Da Nang verifies the source of emissions at Lien Chieu Industrial Park

Trần Thi |

Da Nang announced the verification results of the case of people reflecting emissions from the factory in Lien Chieu Industrial Park (Hai Van ward) causing unpleasant odors, affecting neighboring residential areas.

On August 14, the Management Board of Da Nang High-Tech Park and Industrial Zones (BQL) announced the results of verifying the origin of emissions into residential areas around Lien Chieu Industrial Park (Hai Van ward) reported by people.

Previously, people reported the situation of the factory on roads 3 and 5, Lien Chieu Industrial Park, which regularly emits emissions into the air in the afternoon and evening every day.

According to the reflection, this gas is thick, heavy, insoluble, and has an unpleasant black smell that covers the entire neighboring residential area. Worried about the impact on health, people requested the Management Board to inspect and clearly identify the volume of waste discharge and waste composition mentioned above.

Nguoi dan phan anh tinh trang nha may tai duong so 3, so 5 Khu cong nghiep Lien Chieu thuong xuyen xa khi thai vao khong khi vao chieu, toi moi ngay. Anh: Nguoi dan cung cap
People reported the situation of the factory on roads 3 and 5, Lien Chieu Industrial Park, which regularly emits emissions into the air in the afternoon and evening every day. Photo: Provided by the people

Immediately afterwards, the Management Board coordinated with Saigon - Da Nang Investment Joint Stock Company (SDN Company - the investor in the construction and business of Lien Chieu Industrial Park infrastructure) to check and verify the information. Thereby, it was determined that the smoke-generating facility was a clean air factory belonging to Global Clean Energy Company Limited (GCE Company, Road No. 3 and Road No. 7, Lien Chieu Industrial Park).

GCE said that the smoke discharge is due to the phenomenon of "light water stagnation" (white) appearing frequently in the morning when the temperature is low and the humidity is high, causing the water vents in the after-treatment exhaust gas to stagnate into fog flying low through the residential area.

The current height of the chimney is 22m, although it meets the minimum requirements, but in light and humid conditions, it is not enough to push the steam up, causing the phenomenon of "death anniversary" as reflected. According to the company, the upcoming remedies will increase the height of the chimney by 6m to increase the emission point beyond the low diffuser layer in the morning.

At the same time, check and adjust the flow of sprayed water to limit excess water vape in emissions. Install additional sensors for humidity, environmental temperature and wind speeding to monitor, operate fans and a treatment system that is more suitable for times of low risk of smoke.

Organize periodic measurements every 3 months of dust, SO2, NOx, CO, and smoke flow at the chimney, and send reports to the authorities in accordance with regulations. This unit also recommended that the authorities provide professional support, and at the same time coordinate with businesses during inspections and take periodic emission samples to ensure objectivity and transparency.

According to Mr. Thai Ngoc Trung - Deputy Head of the Management Board of Da Nang High-Tech Park and Industrial Zones, in the coming time, the Management Board will continue to coordinate with SDN Company to monitor the discharge activities of enterprises in Lien Chieu Industrial Park, conduct inspections, take analysis samples to have a basis for consideration and handling of administrative violations in case the analysis results exceed the permitted discharge limit.

Trần Thi
RELATED NEWS

4.5km of road under construction for nearly 7 years has not been completed, causing pollution and accidents in Da Nang

|

The Nam Cao extended road (Hoa Khanh ward, Da Nang city) has been under construction for many years, causing dust, mud, pollution and unsafety, disrupting people's lives.

Da Nang residents worry about pollution and dangers from slow urban infrastructure construction

|

Da Nang - People are concerned about slow construction on central roads and school buildings, affecting traffic and safety.

National Highway 91 in Can Tho has a surplus of more than VND3,000 billion: Reviewing and determining the cost of site clearance

|

Can Tho - The investor is coordinating with relevant units to conduct a review to determine the cost of site clearance (GPMB) of the project.

Young man throws 20-liter water bottle from the 26th floor of an apartment building in Ho Chi Minh City to the ground

|

HCMC - On August 14, social networks spread a clip recording the scene of many 20-liter water bottles falling from the upper floors of an apartment building, endangering people.

28 enterprises will be honored as "Outstanding Enterprises for Workers"

|

The "Outstanding Enterprise for Workers" Award is scheduled to take place at 7:30 p.m. on August 15.

UBND xã Bà Nà, Đà Nẵng phản hồi kiến nghị di dời điểm tập kết rác ô nhiễm gần khu dân cư

Thu Giang |

Đà Nẵng - UBND xã Bà Nà vừa trả lời kiến nghị của người dân về việc di dời điểm tập kết rác cuối đường Gò Lăng 5.

4.5km of road under construction for nearly 7 years has not been completed, causing pollution and accidents in Da Nang

Trần Thi |

The Nam Cao extended road (Hoa Khanh ward, Da Nang city) has been under construction for many years, causing dust, mud, pollution and unsafety, disrupting people's lives.

Da Nang residents worry about pollution and dangers from slow urban infrastructure construction

Trần Thi |

Da Nang - People are concerned about slow construction on central roads and school buildings, affecting traffic and safety.