The gasoline and flying fuel depot project will encroach on 2 hectares of sea surface in Cam Ranh Bay

Hữu Long |

Khanh Hoa - The first-source petroleum depot combined with Ba Ngoi flying fuel" has an area of 2 hectares encroaching on the sea at Ba Ngoi port in Cam Ranh Bay with a capacity of 15,000m3.

According to information from the Department of Agriculture and Environment of Khanh Hoa province, this agency has posted the content of the consultation report on the environmental impact assessment (EIA) of the project " priori-source petroleum warehouse combined with Ba Ngoi flying fuel".

The project has a total investment of more than 150 billion VND, invested by Vietnam Oil Corporation - JSC (PVOIL) PVOIL and Cam Ranh Port Joint Stock Company, built in Cam Linh ward, Cam Ranh city, with an expected warehouse capacity of 15,000m3.

This project has 2 components, of which component 1 is the sea encroachment item. Specifically, the leveling area has an area of 19,929m2, filling the sea, protective stone embankment and technical infrastructure.

It is expected that the construction and acceptance of the project for the sea encroachment item will be completed within 10 months from the date of acceptance of the investment policy (expected in August 2025).

Component 2 will be a gas station project with an area of about 2 hectares. Component 2 will have a total capacity of 13,500m3, construction area (maximum 12,000m2); number of floors (1-2); height of the project (maximum 17.2m)...

Component 2 will be completed within 13 months from the date of completion of the sea encroachment item (expected in September 2026).

The project "Ba Ngoi Flight Fuel First Lieu Lieu Lieu" was built with the goal of becoming a primary warehouse for aviation fuel supply for the fuel warehouse at Cam Ranh airport, initially participating in the goal of increasing output and developing the aviation fuel market of PVOIL in the area.

According to the environmental impact assessment report, the project will encroach on 2 hectares of sea surface, which will change the terrain, natural landscape of the area and certainly affect the flow momentum.

In addition, the process of leveling and building sea encroachment items will take away part of the habitats of some coastal animals and plants, disrupting the stability of ecosystems that have existed for a long time... Thereby changing the structure of the bottom layer, decreasing and changing the composition of organizms.

The investor commits to minimizing the impact of clearing activities; minimizing dust caused by excavation and filling activities such as equipping workers with adequate labor protection equipment and regularly reminding workers to use sprayed water to reduce dust on transportation routes and in project areas in areas with high dust...

Hữu Long
TIN LIÊN QUAN

After the arrangement, Khanh Hoa provides guidance on incentives and adjustments to investment projects

|

On June 15, the People's Committee of Khanh Hoa province issued instructions on determining investment incentives; procedures for adjusting investment projects after the arrangement of administrative units.

Super urban area along Cam Ranh Bay is eligible for capital mobilization

|

Khanh Hoa - The authorities have notified all conditions for capital mobilization through investment cooperation and business cooperation of the Cam Ranh Bay Urban Area project.

Rectifying a series of Cam Ranh contractors in construction acceptance

|

Khanh Hoa - The inspection agency discovered many violations in the acceptance and handover of construction works in Cam Ranh.

Questions about the fate of the Beautiful brothers, sisters, and children

|

The success of Anh trai say hi, Call Me by Fire has created miracles, including the explosion of concerts attracting tens of thousands of audiences.

Director commits to pay workers' salaries after Lao Dong Newspaper's reflection

|

Dien Bien - Immediately after Lao Dong Newspaper reported that dozens of workers were rolling out banners to collect debts, the director of this company pledged to pay their salaries before June 30.

Russian exports increase sharply amid a wave of sanctions from the West

|

Russian exports have increased significantly compared to before the escalation of the Ukrainian conflict, despite large-scale sanctions from the West.

Parents anxiously wait for their children to take the 6th grade entrance exam at Tran Dai Nghia Secondary and High School

|

HCMC - On the morning of June 16, more than 4,800 students entered the survey to win 350 6th grade seats at Tran Dai Nghia Secondary and High School, with a corresponding competition rate of 1/14.

Pakistan calls on Hoi giao countries to unite against Israel

|

Pakistan's defense minister urged a cut-off with Israel and called for a common response from the Muslim world.

After the arrangement, Khanh Hoa provides guidance on incentives and adjustments to investment projects

Hữu Long |

On June 15, the People's Committee of Khanh Hoa province issued instructions on determining investment incentives; procedures for adjusting investment projects after the arrangement of administrative units.

Super urban area along Cam Ranh Bay is eligible for capital mobilization

Hữu Long |

Khanh Hoa - The authorities have notified all conditions for capital mobilization through investment cooperation and business cooperation of the Cam Ranh Bay Urban Area project.

Rectifying a series of Cam Ranh contractors in construction acceptance

Hữu Long |

Khanh Hoa - The inspection agency discovered many violations in the acceptance and handover of construction works in Cam Ranh.