Lam Dong directs inspection of more than 64,000 tons of stagnant waste after Lao Dong Newspaper's reflection

Phúc Khánh |

Lam Dong - After Lao Dong Newspaper continuously reported the situation of 64,000 tons of garbage stagnant at Bao Loc Waste Treatment Plant, the authorities have stepped in to inspect and handle it.

On November 7, under the direction of Lam Dong Provincial People's Committee, the Department of Agriculture and Environment chaired the inspection in coordination with the Provincial Police and Bao Loc Ward 3 People's Committee to conduct an inspection at Bao Loc Waste Treatment Plant.

Accordingly, Lam Dong provincial authorities have inspected many contents related to Bao Loc Waste Treatment Plant that Lao Dong Newspaper has reported.

Rac thai u dong keo dai theo duong noi bo trong khuon vien Nha may xu ly rac Bao Loc. Anh: Phuc Khanh
Waste stagnates along the internal road in the Bao Loc Waste Treatment Plant. Photo: Phuc Khanh

Specifically, inspect and evaluate the amount of waste remaining at the factory; assess the environmental impact caused by the amount of waste of more than 64,000 tons that can be caused; inspect and evaluate the impact of wastewater from the factory on the environment.

Tinh trang nguoi lao dong bi don vi van hanh Nha may xu ly rac Bao Loc no luong da dien ra tu dau nam 2024 va keo dai den hien tai (trong anh: Lien doan Lao dong TP Bao Loc cu) chu tri tra luong cho nguoi lao dong). Anh: Phuc Khanh
Workers have been owed wages by the Bao Loc Waste Treatment Plant operator since the beginning of 2024 and have been held until now (in the photo: The old Bao Loc City Labor Federation, which presided over paying wages to workers in September 2024). Photo: Phuc Khanh

During the inspection, the Department of Agriculture and Environment of Lam Dong province took samples of wastewater from the waste treatment plant and water sources on Dai Lao stream (at the location directly adjacent to the waste treatment plant) for testing and assessing the level of pollution.

The authorities have questioned the representative of Friendly Green Environment Joint Stock Company (the plant's operator) about the capacity to handle waste. In which, it emphasized the capacity and time to handle the huge mountain of garbage that is still pending.

Rac thai u dong lau ngay chat cao nhu nui tai Nha may rac Bao Loc, tiem an nguy co cao gay o nhiem moi truong nghiem trong. Anh: Phuc Khanh
The waste has been stagnant for a long time, rising as high as a mountain at Bao Loc Waste Treatment Plant, posing a potential risk of serious environmental pollution. Photo: Phuc Khanh

The authorities also requested that Friendly Green Environment Joint Stock Company pay attention to ensuring the legitimate rights and interests of employees working at the Factory. It is necessary to promptly resolve the wages owed to workers, so that they can return to work soon.

Nuoc thai tu Nha may xu ly rac Bao Loc thai ra suoi Dai Lao, nguy co gay o nhiem moi truong. Anh: Phuc Khanh
Wastewater from Bao Loc Waste Treatment Plant flows into Dai Lao stream, which can pollute the environment. Photo: Phuc Khanh

Speaking to Lao Dong Newspaper reporter, Mr. La Thien Luan - Head of the Environment Department (Lam Dong Department of Agriculture and Environment) said: "We have conducted a field survey at the Waste Treatment Plant under the direction of the provincial People's Committee. The inspection and survey are based on issues reported by the press. We will make a record of the actual situation to report to the Provincial People's Committee. When there are results, we will inform the press".

Previously, as reported by Lao Dong Newspaper, more than 64,000 tons of waste stagnant at Bao Loc Waste Treatment Plant pose a high risk of causing serious environmental pollution.

Rac thai u dong keo dai dang la van de nan giai can som co phuong an giai quyet de dam bao moi truong. Anh: Phuc Khanh
Long-standing waste stagnation is a difficult problem that needs to be resolved soon to ensure the environment. Photo: Phuc Khanh

According to the People's Committee of Bao Loc Ward 3, this situation is prolonged due to many reasons. In particular, the main reason is that the machinery system is old, often damaged and the long-term unpaid wages of workers have not been resolved.

In particular, the Bao Loc Construction Investment Project Management Board and Friendly Green Environment Joint Stock Company - the factory operator - have not yet agreed on a unit price for waste treatment.

Phúc Khánh
RELATED NEWS

5m high embankment in Lam Dong collapsed, damaging houses

|

Lam Dong - During heavy rain, a 5m high embankment suddenly collapsed, burying part of a house below, fortunately not causing any human casualties.

The 1st Congress of the Vietnam Fatherland Front of Lam Dong province will have 400 delegates attending

|

Lam Dong - 400 delegates will attend the 1st Congress of the Vietnam Fatherland Front of the province, term 2025 - 2030 taking place in the near future.

Enterprises in Lam Dong arbitrarily block flows, illegally store water, causing lakes to burst, flash floods

|

Lam Dong - Viet Phong Phu Farm Company built an unlicensed reservoir, arbitrarily blocking the water flow - a prohibited act according to regulations.

The Secretariat disciplines the expelment of 3 former cadres in Dong Nai and Phu Yen from the Party

|

The Secretariat decided to take disciplinary action by expelling from the Party 2 former cadres in Dong Nai and 1 former cadres of Phu Yen province (now Dak Lak province).

Mr. Duong Duc Tuan will manage the work of the Hanoi People's Committee from November 8

|

Vice Chairman of Hanoi People's Committee Duong Duc Tuan was assigned to run the work of the Hanoi People's Committee from November 8 until new instructions from the Central and City Party Committee.

Relocating the abandoned ship that caused a stir on social networks from Con Dao

|

HCMC - The abandoned Sheng Li ship, which once attracted tourists to check-in, has begun to be relocated from Con Dao.

Mobilizing many trucks and excavators to clean up the huge amount of mud and waste after floods in Hue

|

HUE - Using many overturned excavators and trucks to urgently clean up garbage and mud after floods, returning a clean and beautiful appearance to the city.

Lam Dong directs inspection of more than 64,000 tons of stagnant waste after Lao Dong Newspaper's reflection

|

Lam Dong - After Lao Dong Newspaper continuously reported the situation of 64,000 tons of garbage stagnant at Bao Loc Waste Treatment Plant, the authorities have stepped in to inspect and handle it.

5m high embankment in Lam Dong collapsed, damaging houses

Phúc Khánh |

Lam Dong - During heavy rain, a 5m high embankment suddenly collapsed, burying part of a house below, fortunately not causing any human casualties.

The 1st Congress of the Vietnam Fatherland Front of Lam Dong province will have 400 delegates attending

Phúc Khánh |

Lam Dong - 400 delegates will attend the 1st Congress of the Vietnam Fatherland Front of the province, term 2025 - 2030 taking place in the near future.

Enterprises in Lam Dong arbitrarily block flows, illegally store water, causing lakes to burst, flash floods

PhúcKhánh |

Lam Dong - Viet Phong Phu Farm Company built an unlicensed reservoir, arbitrarily blocking the water flow - a prohibited act according to regulations.