Invitation for quotation for supply of consumables for production

M.H |

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.

- Order name: Supply of consumables for production.

- Order type: Purchase of goods.

- Contract implementation time: 120 days.

1. Supplier selection method: Open bidding.

2. Supplier selection method: 01 stage, 01 application package.

3. Capital source: PPC's 2024 production and business capital.

4. YCCG release time: From 8:00 a.m., December 4, 2024 to before 3:00 p.m., December 11, 2024.

Address for issuing YCCG: Sales Department - PPC Company.

Email: thuongph@pbp.vn).

5. YCCG is released for free.

6. Bidding closing time: 15:00, December 11, 2024.

Bidding opening time: 15:30, December 11, 2024.

M.H
RELATED NEWS

Quotation for providing humic acid grinding service for production

|

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.

Quotation for supplying grey kaolin for fertilizer factory production

|

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.

Quotation for processing materials for production

|

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.

Large trucks are absent during rush hours, Ring Road 3 traffic is less tense

|

Hanoi - Piloting the restriction of heavy trucks during peak hours helps Ring Road 3 traffic become more smooth, and congestion pressure is significantly reduced.

Man United eliminated in the 3rd round of the FA Cup

|

In the early morning of January 12 (Vietnam time), Man United lost to Brighton 1-2 and stopped right from the 3rd round of the FA Cup.

3 large transport projects connecting inter-regional roads worth 2,120 billion VND

|

Phu Tho - 3 traffic routes with a total investment of hundreds of billions of VND are being constructed to connect with the main inter-regional road connecting Phu Tho - Lao Cai.

China sets miracle to save Yangtze river project

|

From a miracle to a miracle, China saved the Yangtze River project with an accurate 2mm "handshake" underground.

House fire in Dong Nai, a person on the roof managed to escape

|

Dong Nai - A large fire occurred on the evening of January 11 at a resident's house on Nguyen Ai Quoc street, a person trapped on the roof was rescued by functional forces in time.

Quotation for providing humic acid grinding service for production

M.H |

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.

Quotation for supplying grey kaolin for fertilizer factory production

M.H |

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.

Quotation for processing materials for production

M.H |

Bidding party: Vietnam Petroleum Packaging Joint Stock Company (PPC).

Address: Lot A1-3, Tra Kha Industrial Park, Ward 8, Bac Lieu City.

Tel: 0291.3957555; Fax: 0291.3957666.