Da Nang invests more than 34.6 billion VND in Son Thuy beach project

Mai Hương |

Da Nang invested more than 34.6 billion VND to build the project of Park, Sea Sports Club and Son Thuy beach, Hoa Hai ward, Ngu Hanh Son district.

The People's Committee of Da Nang City has just issued a decision approving the investment policy for the project of Park, Sea Sports Club and Son Thuy Beach, Hoa Hai Ward, Ngu Hanh Son District with a total investment of more than 34.6 billion VND.

The Son Thuy Park, Sea Sports Club and Beach Project will be implemented in 2024 - 2026 to invest in the facilities of the Park, Sea Sports Club and Son Thuy Beach, meeting the facilities to serve the needs of entertainment, recreation, sports, and beach bathing of the people, while also serving the activities and training of high-performance athletes in sea sports.

Thereby, further developing the movement of physical training and sports in general and sea sports in particular of the people and athletes; contributing to the development of the physical training and sports movement, the development of sea sports and the development of tourism in the city.

Specifically, the project will dismantle the degraded and damaged items of Son Thuy beach including: storage house, changing area, showers, current foundation. Build 1 new storage house, 8 changing areas, 10 fresh water shower areas; build 4 new lakes, 1 toilet, green landscape yard, 1 underground water tank, steps down to the sea.

bai tam Son Thuy
Son Thuy beach, Hoa Hai ward, Ngu Hanh Son district. Photo: Thuy Trang

The sea sports club will build a sports field with a total area of ​​5,900m2; build a new 1-storey technical house with a common hall, 1 meeting room, 1 working area, 1 referee room, 1 canteen, 2 athlete changing areas, 2 athlete shower areas, 1 athlete shower area, 1 common restroom and 1 large warehouse.

The project uses a reinforced concrete foundation, frame, roof structure, waterproof roof floor, soil filled with grass and shrubs to create a green space in harmony with nature; unburnt brick walls, cement plaster, painted; aluminum-glass frame doors and windows; electricity and water supply and drainage systems with a total floor area of ​​about 670m2.

In addition, the project will build new auxiliary items including: 2 public toilets, a guard house, 2 containers for boats; planting shade trees, decoration; paving with granite and cubic stone; equipping with stone benches, trash cans; technical house equipment; sports field equipment, gymnasium equipment, children's playground equipment, equipment for covering the competition field. Arrange 2 shower areas with an area of ​​80m2.

For the Green Park and internal roads, Vinh Cong will pave the floor with cubic stone; green trees, landscape with granite and cubic stone; plant shade trees, low trees and shrubs to create landscape; granite basins, arrange granite benches, trash cans...; build a parking lot for cars and buses with concrete foundation; make gates, soft fences with green trees and invest synchronously in technical infrastructure system (water supply, drainage, lighting...).

Mai Hương
RELATED NEWS

Hanoi traffic police on duty throughout the night of Countdown, maintaining traffic peace in the Capital

|

Hanoi - Traffic police forces proactively divert traffic, on duty throughout the night of Countdown and fireworks display, ensuring smooth and safe traffic for people to welcome the New Year 2026.

Opening of the N2 overpass branch at An Phu intersection on the last night of the year

|

Ho Chi Minh City - Branch N2 overpass belonging to the An Phu traffic junction construction project (Ho Chi Minh City) officially opened to traffic on the evening of December 31st.

Metro Line 1 in Ho Chi Minh City runs all night, free tickets to welcome New Year's Day

|

Ho Chi Minh City - Metro Line 1 increases trips, running overnight on December 31st and free tickets on January 1st, 2026 to serve people celebrating the New Year 2026.

Parking a motorbike for Countdown is quoted as a price of 100,000 VND

|

Hanoi - A sea of people flocking to Hoan Kiem Lake area to welcome Countdown 2026 makes parking areas crowded, in some places asking for prices up to hundreds of thousands of dong.

9th Hour: The price of choice - Part 1

|

9th hour number 183 - A boring marriage suddenly erupts when the husband demands a divorce. Finding clues behind it, how will the wife handle it when the truth is exposed?

Business ecosystem of the director of the program "Come here, four birds of the sky

|

The director of the program "Come here, four birds of the sky" is representing and participating in operating the business ecosystem operating in the entertainment and training fields.

Completing site clearance for Ring Road 4 project in the Capital region

|

Hanoi - Communes and wards have completed site clearance and handed over to investors to construct Ring Road 4 project in the Capital region.

Prime Minister Pham Minh Chinh: Agriculture is still a pillar but must be innovative

|

Prime Minister Pham Minh Chinh affirmed that in the new era, agriculture is still a pillar but must make stronger breakthroughs.

Xuất hiện 2 hố sâu tại bãi tắm Hòn Gai, Hạ Long

Đoàn Hưng |

Sau bão số 3 (Yagi), tại Bãi tắm Hòn Gai, thành phố Hạ Long, tỉnh Quảng Ninh xuất hiện hai hố sâu khoảng 2m, gây lo ngại về an toàn cho người dân và du khách.

Nhiều vụ đuối nước ở bãi tắm biển Đá Ông Địa dù có cảnh báo

Duy Tuấn |

Bình Thuận - Nhiều vụ du khách tắm biển bị đuối nước ở vị trí "điểm đen" gần kè đá bãi tắm Đá Ông Địa, Phan Thiết dù vị trí này đã đặt nhiều bảng cảnh báo.

Cảnh báo nguy cơ đuối nước tại bãi tắm tự phát ở Cồn Vành

NAM HỒNG |

Thái Bình - Tại Khu du lịch sinh thái Cồn Vành vừa qua liên tiếp xảy ra các vụ đuối nước khiến 2 nạn nhân tử vong khi tắm biển tại 1 bãi tắm tự phát.