On the afternoon of December 17, Road Management Area 3, Vietnam Road Administration continued to direct Khanh Hoa Road Management and Construction Joint Stock Company to mobilize dozens of excavators, bulldozers, and trucks to dig, clear the National Highway 27C, through Khanh Le Pass.
According to information from Road Management Area 3, construction units aim to open one lane to traffic this afternoon.
Also today, at km43 on National Highway 27C, after clearing the mud, the construction unit discovered 2 more large rocks. Currently, Khanh Hoa Road Management and Construction Joint Stock Company is drilling, chiseling, and using excavators to push the rocks out of the road surface.
In case the rock is too hard, the company will consider the option of blasting. Last night (December 16) at Km43, the authorities used blasting to break up a large rock. After the rock was blasted, people and vehicles from Lam Dong and Khanh Hoa came down to urgently level and clear the soil and rock.
Earlier, on the morning of December 15, landslides occurred continuously on Khanh Le Pass, trapping dozens of vehicles and hundreds of people. To support the people, Lam Dong and Khanh Hoa provinces mobilized the army and police to cross the forest, bring food supplies to the people and bring them down the mountain.