EVNCPC fixes the problem and restores power to 100% of customers

Tường Minh |

The Central Power Corporation (EVNCPC) has fixed the problem, ensuring power supply to 100% of customers on October 28.

By 1:00 p.m. on October 28, 2024, EVNCPC had basically completed troubleshooting and restored power to all customers affected by storm No. 6 (Tra Mi). Currently, only a few flooded areas are being monitored by EVNCPC to ensure safety before resuming power supply.

EVNCPC General Director Ngo Tan Cu has directed its affiliated units to mobilize maximum forces, urgently on duty 24/7 to quickly overcome the consequences of storms and floods, helping customers in the Central - Central Highlands region to soon stabilize power sources to ensure daily life and production.

Mr. Ngo Tan Cu emphasized: "Immediately after storm No. 6, EVNCPC units immediately took action, overcoming difficulties to restore power to people in the safest and fastest way."

Up to now, 218 incidents have been resolved, restoring power to more than 689,345 customers, accounting for 14.4% of EVNCPC's total customers, accounting for 91% of the total number of affected customers. Except for some flooded and landslide areas that have not yet met safety conditions, EVNCPC has basically completed the recovery work.

With heavy rains still complicated in Quang Binh, Quang Tri and Thua Thien Hue, General Director Ngo Tan Cu requested to closely monitor the weather situation, check safety as the water recedes, and if safety is ensured, immediately restore power to customers. He further emphasized: "Restoring power is an urgent task, but ensuring safety for people and workers is the top priority."

EVNCPC units are currently ready to respond to heavy rain from storm No. 6 to ensure timely and safe power supply for customers.

Tường Minh
RELATED NEWS

Appointment and transfer of personnel in Hanoi, Dong Thap, Dong Nai

|

From May 11-15, personnel transfer and appointment decisions were implemented in localities such as Hanoi, Dong Thap, Dong Nai, and Dien Bien.

No transfer of My Dinh Sports Complex when financial issues are not clarified

|

The Deputy Prime Minister emphasized the requirement to thoroughly handle the remaining issues of the My Dinh National Sports Complex before handover.

Instructions on switching from old gasoline cars to electric cars at Green Transit Day 2026

|

On Green Transformation Day 2026, people can bring old gasoline cars to participate in the "gasoline to electricity exchange" program and directly experience new electric vehicle lines.

Draft Report of the Executive Committee of the Vietnam General Confederation of Labor (XIII term) at the XIV Congress of the Vietnam Trade Union, term 2026 - 2031

|

Building a comprehensively strong Vietnam Trade Union; focusing on representing, caring for, and protecting union members and workers; promoting the pioneering role, spirit of innovation and creativity, contributing to realizing the aspiration to build a rich, prosperous, civilized, and happy country.

EVNCPC quyên góp gần 4,7 tỉ đồng ủng hộ đồng bào vùng bão lũ

Tường Minh |

Tổng công ty Điện lực miền Trung (EVNCPC) đã phát động, quyên góp được 4,7 tỉ đồng hỗ trợ đồng bào các tỉnh phía Bắc bị thiệt hại do bão lũ.

EVNCPC cử 273 kỹ sư, công nhân hỗ trợ khắc phục bão số 3

Tường Minh |

Tổng Công ty Điện lực miền Trung (EVNCPC) cử 273 kỹ sư, công nhân hỗ trợ EVNNPC (Điện lực miền Bắc) khắc phục sự cố lưới điện do bão số 3.

EVNCPC chung tay khắc phục hậu quả bão số 3

Tường Minh |

Tổng Công ty Điện lực miền Trung (EVNCPC) hỗ trợ 3 điện lực phía Bắc 2,5 tỉ đồng để chung tay khắc phục hậu quả bão số 3.

EVNCPC khen thưởng nhóm công nhân cứu người bị điện giật

Tường Minh |

Tổng Giám đốc Tổng Công ty Điện lực miền Trung (EVNCPC) khen thưởng nhóm công nhân Điện lực Bố Trạch, Quảng Bình cứu người bị điện giật.