Long Bien District:
- Construction of 3 routes according to the plan (1 13m route connecting from the left and right dykes of Hong to Ngoc Thuy 40m road, 1 route from lane 66 Ngoc Thuy to Ngoc Thuy 40m road and 1 route 13.5m from lane 140 Ngoc Thuy to the end of lane A.8/NT2), Ngoc Thuy ward.
Tay Ho District:
- Construction of Dang Thai Mai route extended to Au Co street (according to the plan).
- Construction of a road from Lane 50 Dang Thai Mai to Quang Khanh Street, Quang An Ward.
- Construction of a road connecting Dang Thai Mai Street with Quang Ba Street, Tay Ho Street and expansion of Quang Ba Street from the lower Thuy Su Lake to the upper Thuy Su Lake (according to the plan).
- Construction of a road from Dong Do apartment building extended to Xuan Tao street (according to the plan).
- Build a walking path along West Lake from Kim Lien Pagoda to Thang Loi Hotel (according to the plan).
- Construction of a road section from the intersection of lane 612 Lac Long Quan - Vu Tuan Chieu street to Nhat Chieu street; installation of the West Lake water supply pipeline (from the intersection of Vo Chi Cong - lane 685 Lac Long Quan to Nhat Chieu street).
Cau Giay District:
- Build a road from Tran Vy Street to the high school at the land plot marked F/HHPT1 in Mai Dich Ward.
- 13.5m road to Nghia Do Kindergarten ( Facilities 3).
- Xuan Thuy Street next to HITC to Ma Khay sluice.
Thanh Oai District:
- Bich Hoa - Binh Minh road to Provincial Road 427.
- Hong Duong commune traffic axis road to provincial road 429.
- Binh Minh - My Hung inter-commune road (from the development axis road to Minh Kha communal house).
- Kim Bai - Do Dong - Tan Uoc inter-commune road (from Thanh Oai A High School to Tan Uoc commune).
- Traffic route connecting from Provincial Road 427 (at the end of Dia Muoi Road) to the Southern development axis road.
- Kim An - Do Dong Street (Since Kim An to National Highway 21B).
- Thanh Van Street - the development axis south to Thuong Tin, in Thanh Oai District.
Phuc Tho District:
- Construction of a road connecting National Highway 32 to the inter-commune road of Tam Hiep - Ngoc Tao - Phung Thuong.
- Construction of a road connecting National Highway 32 to Rang Nhan to TL421 road throughui Mat to Duong Lieu, Hoai Duc district.
Thuong Tin District:
- Internal traffic route of To Hieu commune residential area (section passing through To Hieu General Clinic).
- Do Van, Do Dang streets - Van Diem commune.
My Duc District:
- Renovate and upgrade route 419 from km51+55 to km53+552 (the section coinciding with the Mieu Mon - Huong Son economic development axis road).
- Traffic road from Hop Thanh commune to Do Xa - Quan Son road.
Hoai Duc District:
- Main road of Cat Que commune central area.
- Expanding the road to the gate area of Hiep communal house, Minh Khai commune.
- Rural traffic route of Dac So commune, lines 1, 2, Dong village.
- Invest in the construction of the main road of Dong La commune, the section connecting the commune center to Yen Nghia - Ha Dong.
Son Tay Town:
- Road connecting from Provincial Road 414 (Vi Thuy intersection) to Provincial Road 416.
Gia Lam District:
- Construction of routes according to the planning to connect routes according to the planning in Trau Quy town, Gia Lam district (phase I).
Thanh Tri District:
- Construction of a road connecting Hoa Binh bridge to Nam Linh Dam urban area, Thanh Tri district.
- Construction of the road northwest of Vinh Ninh village, Vinh Quynh commune, Thanh Tri district.
Me Linh District:
- Construction of Tien Phong - Tu Lap route, Me Linh district (Phase 1).
- Construction of a road connecting Road 100 Me Linh Urban Center Axis through the District General Hospital to the left dike of the Red River, Me Linh District.