Hundreds of police fought the "fire" for hours

Tô Thế |

Hanoi - A children's toy warehouse caught fire fiercely on the night of November 18. Hundreds of police and equipment were mobilized to fight the "fire".

On the morning of November 19, information from Hoang Mai District Police (Hanoi) said that professional units are investigating the cause of the fire at the warehouse in alley 115/35 Dinh Cong (Hoang Mai District), which occurred on the night of November 18.

Dam chay bung phat du doi, de doa chay lan sang cac nha xuong lien ke. Anh: Thanh Ha
The fire broke out fiercely, threatening to spread to adjacent factories. Photo: Thanh Ha

Accordingly, at around 10:26 p.m. on November 18, the authorities received a fire report. Hoang Mai District Police then dispatched 2 fire trucks, 1 water tanker, and 1 pickup truck to the scene to put out the fire.

Due to the complexity of the fire, Hai Ba Trung District Police mobilized 2 fire trucks, the Fire and Rescue Team of Area 2 mobilized 2 fire trucks, 1 vehicle and the Fire and Rescue Team of Area 5 mobilized 2 fire trucks to coordinate.

On-site forces such as inter-family groups, civil defense, grassroots fire fighting team, Dinh Cong ward police, Thinh Liet ward police and local people... organized initial fire fighting.

Hang tram canh sat, may moc thiet bi duoc huy dong chien dau voi “giac lua“. Anh: Cong an cung cap
Hundreds of police and equipment were mobilized to fight the "fire". Photo: Provided by the police

Police determined that the fire area of ​​about 250 square meters belonged to Hung Nam Cuong Interior Investment and Development Joint Stock Company, which rented the premises from Railway Transport Services Joint Stock Company.

The warehouse and workshop area of ​​the Railway Transport Service Joint Stock Company has an area of ​​about 800m2, a 1-storey building with brick walls and corrugated iron roof.

Because there were many plastic items and toys inside such as ball houses, plastic balls... the fire flared up fiercely and spread quickly, making firefighting difficult.

After many hours of efforts to put out the fire and prevent it from spreading, by 1:00 a.m. on November 19, the fire was basically extinguished. Authorities continued to spray water to cool the fire and prevent it from flaring up again.

Dam chay duoc dap tat sau nhieu gio chua chay. Anh: Cong an cung cap
The fire was extinguished after many hours of firefighting. Photo: Provided by the police

The fire caused some adjacent warehouses to be scorched, affected by heat and smoke. Adjacent houses suffered heat and smoke damage to their walls.

Initial information, the fire did not cause any human damage, many assets from surrounding warehouses were moved out.

Tô Thế
RELATED NEWS

Police block road, control fire in Nha Trang

|

Khanh Hoa - The fire started on the third floor of a house located in the center of Nha Trang city, making rescue work difficult.

Fire at many kiosks in the market in Ha Tinh

|

Ha Tinh - In the early morning of November 18, at Hoi market in Cam Xuyen town (Cam Xuyen district), a fire broke out, burning down many kiosks.

The humid season haunts cheap boarding houses in Hanoi

|

Hanoi - Prolonged humidity has caused many cheap boarding houses in Hanoi to be flooded and walls moldy. Poor workers and people with underlying diseases face an increased risk of illness.

Consumers are still hesitant to use biofuel

|

In some localities, consumers are still hesitant to use biofuel due to the lack of regular communication.

Pensions and social insurance allowances for February and March: Tens of trillions of VND have reached beneficiaries

|

According to Vietnam Social Security, 44,730 billion VND of pensions and social insurance allowances for February and March 2026 have been paid to beneficiaries in the February 2026 payment period.

Converting IELTS scores into universities in 2026

|

The IELTS conversion table when applying to universities in 2026 is continuously updated by Lao Dong for candidates and parents to follow.

Russia hands over 200 first Storm reconnaissance UAVs to the military

|

The first batch of more than 200 Storm unmanned aerial vehicles (UAVs) has been handed over by the manufacturer to the Russian army.

Long Thanh airport is about to open, Ho Chi Minh City urgently completes connectivity

|

Ho Chi Minh City - Long Thanh Airport will be operational from mid-2026. Ho Chi Minh City directs acceleration of connecting transport projects to avoid congestion when the airport comes into operation.

Police block road, control fire in Nha Trang

Phương Linh |

Khanh Hoa - The fire started on the third floor of a house located in the center of Nha Trang city, making rescue work difficult.

Fire at many kiosks in the market in Ha Tinh

TRẦN TUẤN |

Ha Tinh - In the early morning of November 18, at Hoi market in Cam Xuyen town (Cam Xuyen district), a fire broke out, burning down many kiosks.

Gần 100 giờ phơi nắng, trắng đêm chiến đấu giặc lửa ở biên giới Kiên Giang

NGUYÊN ANH - PHƯƠNG VŨ |

Nơi tuyến lửa biên giới, cán bộ chiến sĩ lực lượng vũ trang tỉnh Kiên Giang đã liên tục chữa cháy rừng, bất kể ngày đêm, bất chấp thời tiết khắc nghiệt, nắng nóng trên đầu, lửa nóng dưới chân, họ vẫn chắc ý chí, vững tinh thần dập lửa.