Mobilizing resources to build 100km of road along the Saigon River

ĐÌNH TRỌNG |

Binh Duong - The province is calculating plans to mobilize resources to develop a nearly 100km long Saigon riverside road.

The People's Committee of Binh Duong province held a meeting to discuss the mobilization of resources to build a road along the Saigon River.

Regarding this issue, the Department of Construction has implemented a project to mobilize resources to build a road along the Saigon River with an orientation for implementation in the period of 2025-2030 and the period after 2030.

After consideration, the People's Committee of Binh Duong province unanimously approved this project. The People's Committee of Binh Duong province assigned relevant units to review the draft decision to submit to the leaders of the Provincial People's Committee for signing and promulgating.

After the project is approved, localities with the Saigon River flowing through will be assigned to coordinate with departments and branches to review and update relevant plans accordingly. At the same time, urgently propose plans to create land funds and investment plans in the areas. Prioritize projects connecting localities and important projects of the province to promote potential along the Saigon River road axis.

Tinh Binh Duong se huy dong nguon luc de xay dung duong ven song Sai Gon. Anh: Duong Binh
Binh Duong province will mobilize resources to build a road along the Saigon River. Photo: Duong Binh

According to records, Binh Duong has nearly 100km along the Saigon River passing through localities such as Thuan An city, Thu Dau Mot city, Ben Cat city and Dau Tieng district. The Saigon River embankment is mainly a dirt dike. Currently, Thuan An and Thu Dau Mot cities are investing in short sections of the Saigon River.

Because transportation along the Saigon River has not been developed, the Saigon River area is still like a rural area, an underdeveloped urban area.

Binh Duong province is developing an investment project to build a road along the Saigon River. According to the project, the total length of the entire Saigon River road is nearly 100 km. This route will orient to connect with the parallel routes of Ho Chi Minh City Ring Road 3 and Ho Chi Minh City Ring Road 4, DT 744. At the same time, the riverside road will be a driving force for the development of a number of projects in the logistics industry such as the development of An Son port cluster, An Tay port cluster, Phu Cuong Thinh port...

Khu vuc ven song Sai Gon chua phat trien do thi, giao thong. Anh: Dinh Trong
The Saigon River area has not yet developed urban areas and transportation. Photo: Dinh Trong

The project calculates the implementation of 13.6 km of the Saigon River road passing through Thuan An city. The road is 32 m wide, with 6 lanes, following the existing Saigon River dike (from 20-40 m from the riverbank).

Construct a 16.7 km long Saigon River road through Thu Dau Mot city with a road width of 14-32 m.

The section through Ben Cat city is 27.9 km long with a road width of 28-36.5 m and the section through Dau Tieng district is 39.79 km long with a road width of 32 m.

Doan qua Thu Dau Mot dang duoc xay dung. Anh: Dinh Trong
The section through Thu Dau Mot is under construction. Photo: Dinh Trong
ĐÌNH TRỌNG
TIN LIÊN QUAN

Investing in the Suoi Cai road expansion project in Binh Duong

|

Binh Duong - The Provincial People's Committee agreed on the investment policy for the Suoi Cai road expansion project in Tan Uyen city, Binh Duong province.

Binh Duong plans to build 100 km of road along the Saigon River

|

Binh Duong province is discussing a plan to build nearly 100 km of road along the Saigon River. The route is of great significance in developing the large urban area along the Saigon River.

Ho Chi Minh City builds a 78.2km long, 4-8 lane wide Saigon River road

|

Ho Chi Minh City will build a 78.2km long Saigon River road, from the Ben Luc - Long Thanh expressway intersection with Rung Sac road to the Tay Ninh province border, with 4 - 8 lanes wide.

Fierce tanker truck on fire on Noi Bai - Lao Cai Expressway

|

A tanker truck caught fire fiercely on the Noi Bai - Lao Cai Expressway this morning (January 1).

After April 10, unreported projects will be considered untroubled

|

After April 10, the national public investment system will not receive further information about investment projects with difficulties, long backlogs and is considered no longer stuck.

Gold prices increase sharply, Germanyans worry about gold reserves in the US

|

In the context of the continuous increase in gold prices, Germans are starting to worry about more than 110 billion euros in gold reserves in the US.

Apartment residents in Ho Chi Minh City check houses after earthquake in Myanmar

|

HCMC - After the earthquake in Myanmar, many HCMC residents are worried, proactively checking their homes and assessing their safety level.

Repairing a billion-dollar road after a report from Lao Dong Newspaper

|

Bac Kan - After Lao Dong Newspaper's reflection on the billion-dollar Nong Ha - Khe Thi route: DH.75 (Cho Moi) is damaged, so far, this project has been repaired.

Investing in the Suoi Cai road expansion project in Binh Duong

ĐÌNH TRỌNG |

Binh Duong - The Provincial People's Committee agreed on the investment policy for the Suoi Cai road expansion project in Tan Uyen city, Binh Duong province.

Binh Duong plans to build 100 km of road along the Saigon River

ĐÌNH TRỌNG |

Binh Duong province is discussing a plan to build nearly 100 km of road along the Saigon River. The route is of great significance in developing the large urban area along the Saigon River.

Ho Chi Minh City builds a 78.2km long, 4-8 lane wide Saigon River road

MINH QUÂN |

Ho Chi Minh City will build a 78.2km long Saigon River road, from the Ben Luc - Long Thanh expressway intersection with Rung Sac road to the Tay Ninh province border, with 4 - 8 lanes wide.