On March 30, the Dong Nai Provincial Construction Investment Project Management Board proposed to soon resolve the supplementation of the intersection planning to start the project to upgrade and expand provincial road 769 in the second quarter of 2026.
The project to upgrade and expand provincial road 769 is currently facing obstacles in supplementing the planning of the grade-separated intersection of the North-South railway overpass at Km1661+074. The Vietnam Railways Authority suggests that it is necessary to build a road bridge over the railway (the scale of the overpass is according to the planning of provincial road 769), and at the same time eliminate the current grade-separated intersection after building the overpass.

The project to upgrade and expand provincial road 769 is nearly 30km long, starting point intersecting with National Highway 1 at Dau Giay intersection, Dau Giay commune, Dong Nai province; ending point intersecting with National Highway 51 at Loc An intersection, Long Thanh commune, Dong Nai province.
The project is divided into 4 implemented sections with a scale of 6 motorized lanes, 2 mixed lanes (sections 1, 3, 4) and 6 motorized lanes (section 2). The project has a total investment of nearly 5,900 billion VND. Of which, compensation, support, resettlement, and site clearance costs are more than 3,000 billion VND.
The project is implemented in the communes of Dau Giay, Binh An, Long Thanh, Dong Nai province. The total land area to be recovered for project implementation is more than 134ha.
The project to upgrade and expand provincial road 769 is being implemented to increase connectivity, shorten travel time from localities in the province and provinces in the Central Highlands and South Central Coast in general to Long Thanh airport. From there, meeting transportation needs, reducing traffic volume for National Highway 1, contributing to socio-economic development of localities with roads passing through in particular, Dong Nai province and the Southern Key Economic Region in general.
To connect localities in the province with Long Thanh airport, according to the plan, Dong Nai province will implement projects to upgrade, expand, and build 5 provincial roads including: 769, 769E, 773, 770B and the connecting road from Ma Da bridge to Ring Road 4 HCMC.