The reason why the man rushed up to pull the key of a passenger bus on Ring Road 3

Chánh Tiến |

Hanoi - The authorities have provided initial information about the incident where a man rushed up to pick up the keys of a passenger bus on Ring Road 3.

On the afternoon of August 4, speaking with a reporter from Lao Dong Newspaper, the commander of Thanh Liet Ward Police (Hanoi) said that the unit had just received a report from the bus company about a man getting into a passenger car, taking out the car key and leaving. The police are investigating.

Initial information, during the two vehicles' collision, the driver of the car with license plate 30M-258.XX blocked the passenger car, demanded compensation and took out the key of the passenger car and left it despite having nearly 40 passengers on the car at that time.

At the same time, a representative of Road Traffic Police Team No. 7 (Traffic Police Department of Hanoi City Police) said that this was not a simple traffic accident, the unit had sent officers and soldiers to coordinate with the ward police to verify and clarify the incident.

Previously, on the morning of August 4, a clip recorded the scene of a man suddenly jostling a passenger car, screaming to the driver and taking out the car key and leaving, and was shared on social media.

The incident occurred on Hanoi Ring Road 3 at around 7am the same day.

After the incident, the bus company reported to the authorities and sent staff to give the additional key to the driver so that the vehicle could move.

However, this took 1 hour, causing traffic congestion and making passengers on the bus tired.

Chánh Tiến
RELATED NEWS

Garbage flooded Ring Road 3 in Hanoi, Khuong Dinh ward will report to the Department for final handling

|

Hanoi - Faced with the situation of garbage surrounding Ring Road 3, causing public outrage, the representative of Khuong Dinh Ward People's Committee spoke up.

Time to return the road on Hanoi Ring Road 3 Expressway

|

Hanoi - It is expected that by September 2025, the repair of the expansion joints and bridge deck on the Ring Road 3 expressway will be completed, and traffic will be smooth again.

Gas stations in Ho Chi Minh City are ready to sell E10 gasoline

|

From May 15, gas stations in Ho Chi Minh City began switching from RON 95-V gasoline to E10 gasoline.

Buses and electric taxis in Hanoi increase rapidly

|

Clean buses running on green energy have exceeded 42%, electric taxis have reached more than 60% in just the first 4 months of 2026; many people expect the green transition process to take place faster to improve the air quality of the Capital.

After 1 month of subscriber verification, users are surprised to still receive warnings from the network operator

|

After 1 month of deploying SIM authentication, users continue to receive messages from network operators requesting confirmation of phone numbers still in their names.

Instructions on switching from old gasoline cars to electric cars at Green Transit Day 2026

|

On Green Transformation Day 2026, people can bring old gasoline cars to participate in the "gasoline to electricity exchange" program and directly experience new electric vehicle lines.

Draft Report of the Executive Committee of the Vietnam General Confederation of Labor (XIII term) at the XIV Congress of the Vietnam Trade Union, term 2026 - 2031

|

Building a comprehensively strong Vietnam Trade Union; focusing on representing, caring for, and protecting union members and workers; promoting the pioneering role, spirit of innovation and creativity, contributing to realizing the aspiration to build a rich, prosperous, civilized, and happy country.

Cho xe chạy ở làn dừng khẩn cấp đường Vành đai 3 - Hà Nội để giảm ùn tắc là phù hợp

Lê Thanh Phong |

Tuyến đường Vành đai 3 trên cao - Hà Nội thường xuyên xảy ra kẹt xe, đặc biệt các dịp lễ, tết.

Garbage flooded Ring Road 3 in Hanoi, Khuong Dinh ward will report to the Department for final handling

Nguyễn Linh - Hạnh Thơm |

Hanoi - Faced with the situation of garbage surrounding Ring Road 3, causing public outrage, the representative of Khuong Dinh Ward People's Committee spoke up.

Time to return the road on Hanoi Ring Road 3 Expressway

SÓNG HỮU |

Hanoi - It is expected that by September 2025, the repair of the expansion joints and bridge deck on the Ring Road 3 expressway will be completed, and traffic will be smooth again.