The planning of these two expressways has also been approved by the Prime Minister in the general planning of Quang Ninh province for the period 2021-2030, vision to 2025.
In particular, the Noi Bai - Bac Ninh - Ha Long expressway has its starting point in Quang Ninh province at Dong Trieu Town (bordering Hai Duong - Quang Ninh) and its ending point in Quang Ninh province at Son Duong commune, Ha Long city. This expressway has 4 lanes
The second expressway is Tien Yen, Quang Ninh - Lang Son - Cao Bang expressway. This highway also has 4 lanes, with the starting point in Quang Ninh province at Mui Chua, Tien Yen district and the ending point at the border area between Quang Ninh and Lang Son.
The Noi Bai - Bac Ninh - Ha Long expressway is included in the list of projects prioritized for construction investment in the period 2022-2024, with central capital.
Currently, Quang Ninh is the locality with the longest total number of kilometers of highways in the country, with about 176km of 3 interconnected highways, including: Hai Phong - Ha Long highway, Ha Long - Van Don highway and Van Don - Mong Cai Expressway. All three expressways are invested and built in the public-private form.
In addition to the new planning of two expressways Noi Bai - Bac Ninh - Ha Long and Tien Yen, Quang Ninh - Lang Son - Cao Bang, to contribute to fast and convenient connection within the province as well as interprovincial, Quang Ninh also plans Add 9 new provincial roads.
Among these are: Provincial Road 327, consisting of 2-4 lanes, has a branch connecting to National Highway 18 in Kim Son, Dong Trieu and then connecting to Hai Duong, with the starting point in Quang Ninh province at the The intersection with National Highway 18 is located behind the Provincial Gate, Dong Trieu town and the final point in Quang Ninh province is at the intersection with National Highway 279 in Quang La commune, Ha Long city.
Provincial Road 327B, planned with 2-4 lanes, has a starting point intersecting with National Highway 279 in Tan Dan commune, Ha Long City and an ending point located in the border area between Bac Giang - Quang Ninh, to connect with the road. 291 of Bac Giang.
Provincial Road 328 consists of 8-10 lanes, with a starting point connecting with Ha Long - Hai Phong highway at Ha Long Xanh intersection and an ending point connecting with National Highway 18 after the Provincial Gate, Dong Trieu town.