The square of the coastal tourism area is deteriorating after 1 year of use

TRẦN TUẤN |

Ha Tinh - Ky Ninh Sea Tourism Area Square (Ky Anh town) with a total investment of 55 billion VND, just put into use for a year, has deteriorated.

The Ky Ninh Sea Tourism Area Square Project, part of the Ky Ninh Sea Urban Area Project, started construction in January 2023. The square has a total area of over 49,000m2 invested by the Ky Anh Town Construction Project Management Board, with a construction estimated cost of over 55 billion VND.

The project includes items such as: square yard; natural stone internal road yard; Ky Ninh sea tourism symbol; traffic system; water supply and drainage system; square lighting...

Nhieu vien gach bi bong. Anh: Tran Tuan.
Many bricks were peeling. Photo: Tran Tuan.

The enterprise constructing this project is a joint venture between Truong Thanh Construction and Trading Joint Stock Company and 68 Ha Tinh Construction Joint Stock Company.

The project will be handed over to serve the sea tourism season in April 2024. However, less than a year after being put into use, some items of the project showed signs of deterioration.

Some locations in the stone yard area, the steps up and down in the square are cracked and peeling. The volleyball court campus next to the square, the layers of stone are temporarily paved on the sand. Many trees wither after being planted, and their branches break and fall.

Mr. Hoang Trung Thong - Chairman of the People's Committee of Ky Ninh Ward - said: The sea area during the rainy season is often hit by strong waves, so the stone paving system in the Ky Ninh sea square area is cracked and peeling.

Mat nen be tong bi bong. Anh: Tran Tuan.
The concrete foundation is peeling. Photo: Tran Tuan.

According to Mr. Thong, the locality will propose to the town's Project Management Board to request the contractor to promptly repair and fix it, ensure synchronous infrastructure, serve the sea tourism season, and attract tourists.

Nhieu cay xanh vang ua, tro la. Anh: Tran Tuan.
Many trees are yellow and with bare leaves. Photo: Tran Tuan.

A leader of the Ky Anh Town Construction Project Management Board said that the Ky Ninh Sea Tourism Area Square project has not expired the warranty period, so the construction unit will have to repair it. The Board will contact the construction unit to promptly repair the damage and deterioration of the project.

TRẦN TUẤN
TIN LIÊN QUAN

Cau Giay Park is renovated after many years of deterioration

|

After a long time of deterioration, Cau Giay Park (Hanoi) has now been renovated.

Bach Thao Park and Thu Le Park are degraded, renovation is delayed

|

Bach Thao Park and Thu Le Park in Hanoi are both facing deterioration, but the renovation and upgrading progress is slow.

The 220 billion VND fishing port in Hue has just been handed over and has deteriorated

|

Thuan An fishing port worth 220 billion VND has just been announced to open a port, but many construction items have cracked, sunk, and even been demolished.

Hour 9: I am the third person - Part 2

|

Hour 9 - The husband in the story has developed feelings for his wife's best friend. Where will this marriage go?

Mobilizing resources to treat accident victims on National Highway 6

|

The accident on National Highway 6, Sup Vat commune, Yen Chau district, Son La province caused many casualties and heavy casualties were transferred to the upper level.

Ho Chi Minh City University of Education has many violations in the 17.42 billion VND project

|

The Inspectorate of the Ministry of Education and Training concluded that Ho Chi Minh City University of Education has limitations, shortcomings, and violations related to the project with an investment of 17.42 billion VND.

Man United escaped defeat against Everton

|

Everton drew 2-2 with Man United in the match of round 26 of the Premier League on the evening of February 22 (Vietnam time).

making a living on landfills

|

Soc Trang - The landfill is a home, the only source of life for dozens of households.

Cau Giay Park is renovated after many years of deterioration

Hữu Vũ |

After a long time of deterioration, Cau Giay Park (Hanoi) has now been renovated.

Bach Thao Park and Thu Le Park are degraded, renovation is delayed

Tùng Giang |

Bach Thao Park and Thu Le Park in Hanoi are both facing deterioration, but the renovation and upgrading progress is slow.

The 220 billion VND fishing port in Hue has just been handed over and has deteriorated

PHÚC ĐẠT - NGUYỄN LUÂN |

Thuan An fishing port worth 220 billion VND has just been announced to open a port, but many construction items have cracked, sunk, and even been demolished.