Voters in Hoang Phu commune, Thanh Hoa province reported that National Highway 1A through Nghia Trang Station is often flooded.
Voters requested the Ministry of Construction to consider and overcome the above situation.
After studying, the Ministry of Construction responded as follows:
According to the report of the Vietnam Road Administration, National Highway 1 through Nghia Trang Station has a route of Km311+120, the current status of both sides of the road has been arranged with drainage ditches. However, due to the increasing urbanization, the existing water discharge gates on the route have been narrowed, leading to slow drainage.
To overcome the above situation, the Vietnam Road Administration has directed Road Management Area I to regularly monitor and handle drainage.
On August 7, 2025, Road Management Area I coordinated with the locality to dredge the ditch for the above section to clear the drainage area, preventing flooding.
In the 2026 Maintenance Plan, the Ministry of Construction approved the list of "Repairing damaged roadbeds, road surfaces and traffic safety systems in the section:
Km292+950 - Km293+130(P), Km296+800 - Km296+100+++++++++++++++++P), Km297+150 - Km297+350 (T+P), Km309+650 - Km309+850 - Km311+00(T), Km330+180 - Km334+100 (P), Km330+180+180+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Handling traffic safety points at Km302+820 and Km293+970.
Repairing and completing the traffic safety system at Km285+400 - Km326+500, National Highway 1.
This list of repairs includes the section recommended by voters. During the project approval and implementation process, the Vietnam Road Administration will coordinate with local authorities to study and thoroughly handle the flooding situation in 2026.