A section of National Highway 1A through Vinh Long will be repaired in the third quarter of 2026

Xuyên Đông |

The Ministry of Construction has just responded to Vinh Long voters about the repair of National Highway 1A through Binh Minh Bus Station.

Voters in Vinh Long province reported that National Highway 1A, the section of road passing through Binh Minh Bus Station, is about 300m low and flooded, with a large volume of traffic, causing many potential traffic accidents, affecting the crops of households around this area.

Voters recommend that this road section should be upgraded and repaired soon to make it more convenient for vehicles to travel and for people around this area to feel secure in producing and growing crops.

After studying, the Ministry of Construction responded as follows: According to the report of the Vietnam Road Administration, National Highway 1 through Binh Minh Bus Station, about 300m long (project from Km2061+150 to Km2061+450), has been invested in to ensure the scale of 4 lanes for motor vehicles with a median strip. The current road surface is smooth, without damage, but there is a phenomenon of localized flooding due to the impact of high tides.

To address the above local flooding phenomenon, the Ministry of Construction has approved the plan to repair the drainage system of sections Km 2061+150 - Km 2061+340, Km 2061+150 - Km 2061+500 in document No. 7955/BXD-KCHT dated August 7, 2025 and assigned the Vietnam Road Administration to organize the implementation, expected to be completed in the third quarter of 2026 to thoroughly resolve the local flooding situation, ensuring drainage capacity and traffic safety on the route.

During this period, the Ministry of Construction assigned the Vietnam Road Administration to direct the unit managing the route to strengthen regular maintenance work, promptly unblock the drainage system to limit flooding caused by high tides.

Xuyên Đông
RELATED NEWS

Heavy rain causes landslides in Son La, 1 person injured, National Highway 4G is partially congested

|

Son La - Heavy rain caused local flooding on the 4G National Highway section through Chieng Khuong commune, landslides injured 1 person.

Steven Nguyen, Do Nhat Hoang talk about the journey and challenges of playing Red Rain

|

In the program Saturday Afternoon Coffee of Lao Dong Newspaper, actors Steven Nguyen and Do Nhat Hoang shared after the success of the movie Red Rain.

Prime Minister approves personnel to hold the position of Chairman of the People's Committee of Da Nang City

|

The Prime Minister approved the election results for the position of Chairman of the Da Nang People's Committee for Mr. Pham Duc An, Deputy Secretary of the Da Nang City Party Committee.

Vinh Hao - Phan Thiet Expressway shows erosion, dangerous frog jaw openings

|

Lam Dong - The roadbed of the Vinh Hao - Phan Thiet expressway has eroded and has open frog jaw, causing a risk of insecurity for vehicles participating in traffic.

Associate Professor, Dr. Tran Dinh Thien: There may be attacks using fake news to destroy leading enterprises

|

Associate Professor, Dr. Tran Dinh Thien - Member of the Prime Minister's Policy Advisory Council, former Director of the Vietnam Economic Institute - said that fake news is no longer a simple "social networking story" but has become a danger to the entire economy.

Heavy rain causes landslides in Son La, 1 person injured, National Highway 4G is partially congested

Trường Sơn |

Son La - Heavy rain caused local flooding on the 4G National Highway section through Chieng Khuong commune, landslides injured 1 person.

Tai nạn nghiêm trọng trên Quốc lộ 5 đoạn qua Hải Phòng khiến giao thông ùn tắc kéo dài

Mai Hương |

Hải Phòng - Vụ va chạm nghiêm trọng giữa xe chở thép và xe bồn khiến tài xế mắc kẹt trong cabin và giao thông ùn tắc kéo dài.

Va chạm liên hoàn nhiều ôtô, Quốc lộ 51 qua Đồng Nai ùn tắc kéo dài

Hà Anh Chiến |

Đồng Nai - Va chạm liên hoàn nhiều xe ôtô trên Quốc lộ 51 khiến tuyến đường này ùn tắc kéo dài.