Verifying the arbitrary naming of Ton Duc Thang street in Premia Eco City urban area

TUẤN TRUNG |

Dak Lak - In the Premia Eco City urban area, a sign named Ton Duc Thang street suddenly appeared. Functional agencies affirmed that they will investigate and clarify the incident.

Unexpectedly appears a street name sign for Ton Duc Thang street

For many months now, inside the Premia Eco City Urban Area Project (in Tan An ward, Dak Lak province), a road with the name Ton Duc Thang has appeared, while other roads in the urban area are only named in characters and numbers.

It is worth mentioning that the Ton Duc Thang road project, invested by the Buon Ma Thuot Construction Investment Project Management Board, is undergoing site clearance and construction in Buon Ma Thuot and Tan An wards.

The road has not been completely cleared and has not yet fully installed the system of signs, street names, lighting, sidewalk paving...

According to research, in 2021, Dak Lak Provincial People's Committee approved the Ton Duc Thang road project (section from Nguyen Dinh Chieu street to Tran Khanh Du street and section from Phan Trong Tue street to Le Quy Don street) with a total investment of more than 565 billion VND, about 1.2km long.

In 2022, the People's Committee of Buon Ma Thuot City (old) continued to approve the Ton Duc Thang extended road project (from Dong Khoi road to 3.2ha infrastructure construction area, Tan An ward) with a total investment of more than 34 billion VND, about 1km long.

Cơ quan chức năng vẫn đang tiến hành công tác giải phóng mặt bằng, thi công tuyến đường Tôn Đức Thắng. Ảnh: Bảo Trung
Functional agencies carry out site clearance and construction of Ton Duc Thang street. Photo: Huong Giang

However, the road section named Ton Duc Thang in the Premia Eco City urban area is not within the project scope implemented by the Buon Ma Thuot Construction Investment Project Management Board but is named by the urban area investor himself.

This unit has also not received any reports from the investor regarding the naming of the road.

Moreover, the road named Ton Duc Thang located in the Premia Eco City urban area has not yet been connected to the Ton Duc Thang road under construction. Between the two routes, there is still a large land plot with many green trees...

Trục đường Tôn Đức Thắng mới được đặt tên trong khu đô thị (chấm đỏ lên phải) chưa được đấu nối với trục đường Tôn Đức Thắng đang thi công (chấm đỏ bên trái), đồng thời hai tuyến đường đang bị ngăn cách bởi một thửa đất lớn. Ảnh: Bảo Trung
The newly named Ton Duc Thang street in the urban area (red dot on the right) is currently not connected to the Ton Duc Thang street under construction (red dot on the left). The two streets are also separated by a large land plot, functional agencies will investigate the incident. Photo: Bao Trung

Functional agencies get involved in verifying

Leaders of Tan An Ward People's Committee said that the investor of Premia Eco City urban area has not yet handed over technical infrastructure, including roads, lighting systems... to local management.

The Ward People's Committee has also not received a report from the investor about naming the street Ton Duc Thang. We will send officials to inspect, review the planning, and verify to handle according to our authority," the leader of Tan An Ward People's Committee informed.

Mr. Tran Hong Tien - Director of the Department of Culture, Sports and Tourism of Dak Lak province said that the proposal to name streets is under the authority of state management agencies according to regulations.

An urban area investor cannot arbitrarily name a street but must be considered, proposed and implemented according to the correct order and procedures by a competent authority, formerly the Buon Ma Thuot City People's Committee (old), now the Tan An Ward People's Committee.

Regarding the road named Ton Duc Thang in the Premia Eco City urban area, Mr. Tran Hong Tien said that the Department of Culture, Sports and Tourism will assign a professional department to inspect and review to advise on appropriate handling directions.

TUẤN TRUNG
RELATED NEWS

747.5 billion VND underpass project under construction in Long Bien, Hanoi

|

Hanoi - The Co Linh intersection area - Vinh Tuy bridge access road (Long Bien ward) is being barricaded to build a 747.5 billion VND underpass.

Gia Lai prevents labor accidents at pig farm projects

|

Gia Lai - With a series of pig farm projects operating and under construction, the province requires strengthening labor safety assurance.

Quang Tri transfers and appoints leaders after establishing new project management boards

|

Quang Tri - The Standing Committee of the Provincial Party Committee transfers and appoints officials to hold leadership positions in 3 project management boards under the Provincial People's Committee.

Video call to reconnect family after 48 years of separation

|

Lao Cai - Losing her mother when she was only 8 years old, carrying faded memories and another name, Ms. Trieu Thi Chip is always tormented by not knowing where her hometown and relatives are.

Youth union members go to each house to support people in digitizing land data

|

Hanoi - During the 45-day peak campaign, youth union members went to each house to support people in updating and digitizing land data.

Bien Hoa market fire, traders burned down 6 kiosks and 10 warehouses

|

Dong Nai - The fire at Bien Hoa market, Tran Bien ward on the night of August 5th caused many small traders to almost lose all their assets.

Crane truck collapses Dak Lung bridge and falls into river

|

Ho Chi Minh City - A crane truck encountered an incident, causing the Dak Lung bridge to collapse and then plunged into the old Song Be bridge area, 1 person on the vehicle was injured.

747.5 billion VND underpass project under construction in Long Bien, Hanoi

SÓNG HỮU |

Hanoi - The Co Linh intersection area - Vinh Tuy bridge access road (Long Bien ward) is being barricaded to build a 747.5 billion VND underpass.

Gia Lai prevents labor accidents at pig farm projects

THANH TUẤN |

Gia Lai - With a series of pig farm projects operating and under construction, the province requires strengthening labor safety assurance.

Quang Tri transfers and appoints leaders after establishing new project management boards

CÔNG SÁNG |

Quang Tri - The Standing Committee of the Provincial Party Committee transfers and appoints officials to hold leadership positions in 3 project management boards under the Provincial People's Committee.

Tiếp tục xác minh, điều tra vụ tiêu cực thi cử ở Quảng Trị

CÔNG SÁNG |

Quảng Trị - Cơ quan An ninh điều tra Công an tỉnh tiếp tục xác minh vụ tiêu cực thi cử trong Kỳ thi tốt nghiệp THPT 2026 ở điểm thi Trường THPT Lê Trực.