Society
Tra Ly river overpass on a road worth more than 4,900 billion VND in Hung Yen
|
Hung Yen - Tra Ly river overpass, belonging to the road of more than 4,900 billion VND connecting Thai Binh - Pho Hien, has completed more than 50% of the volume.
Water levels of hydropower reservoirs nationwide on September 21
|
Many hydropower reservoirs across the country are still lower than the normal water level, some reservoirs are having large discharges, notably in Hoa Binh, Son La, Lai Chau.
Obsession with pothole traps and trucks at the National Highway 14B construction site - passing through Da Nang
|
Da Nang - People living along National Highway 14B are always worried about accidents due to messy construction sites and rampant trucks.
River water rises to flood temporary bridge, Hanoi residents hope new bridge will be completed soon
|
Hanoi - People on both banks of the Day River hope that the Tan Phu bridge project will be completed soon, replacing the temporary bridge that is often flooded when the Day River water rises.
13 units in Lang Son have not disbursed capital for national target programs
|
Lang Son - By the beginning of September, the disbursement rate of national target program capital only reached 19.5%; 13 units have not disbursed.
