Request to demolish 2 temporary works in the 226 billion VND social housing area in Bac Ninh

Vân Trường |

Bac Ninh - The Provincial People's Committee has just issued an official dispatch on resolving some existing problems of projects invested by Quang Minh Group Joint Stock Company.

Accordingly, considering the proposal of the Department of Construction in the official dispatch dated October 17, 2025 on reporting the results of the inspection of the implementation of the project of Investment in construction of apartment buildings for low-income people, residential area No. 1 of Bac Giang city of Quang Minh Group Joint Stock Company.

The Chairman of the People's Committee of Bac Ninh province has the following opinion:

Request Quang Minh Group Joint Stock Company to dismantle 2 temporary works located in the premises of the 18-storey building to ensure compliance with the overall planning of the project and urban order and aesthetics.

Urgently organize the first apartment building conference to establish the Board of Directors of the 18-storey building according to regulations.

The People's Committee of Bac Giang Ward inspected and urged Quang Minh Group Joint Stock Company to implement the above content; at the same time, organize an inspection of construction order for the Company's construction works on the land with symbol 2-DV-3 under the Sub- Zoning Plan No. 1 of Bac Giang urban area.

The Department of Agriculture and Environment shall preside over and coordinate with relevant agencies to clearly identify the location, boundaries, area of traffic land and yard land, green premises in the plots of land for apartment building construction to hand over to land users, as a basis for management.

The Department of Construction urged the People's Committee of Bac Giang Ward and the project investor to dismantle 2 temporary works located in the premises of the 18-storey building. The results will be reported to the Chairman of the Provincial People's Committee before December 25, 2025.

Quang Minh low-income apartment complex (Bac Giang ward) is a social housing project with a total capital of more than 226 billion VND, started in 2010.

The project includes 5 blocks of 5 floors, 1 block of 18 floors and 2 blocks of 15 floors, with a scale of about 600 apartments.

Vân Trường
RELATED NEWS

Overcoming shortcomings on the approach road connecting Bac Ninh - Hai Phong

|

Bac Ninh - The Provincial People's Committee has just issued an official dispatch on ensuring traffic safety on the road leading to Dong Viet bridge.

Bac Ninh will merge Tang Tien industrial cluster into Van Trung Industrial Park

|

Bac Ninh - The total area after merging Tang Tien industrial cluster into Van Trung Industrial Park is 388 hectares.

A business in Bac Ninh had 4.2 hectares of land reclaimed

|

Bac Ninh - The Provincial People's Committee has just issued a decision on the recovery of land managed by Thai Son Blu Company Limited.

Ukrainian President publicly abandons NATO membership goal for first time

|

Ukrainian President Volodymyr Zelensky said Kiev had accepted giving up its ambition to join NATO to find a way out of the conflict with Russia.

Nguyen Thi Thanh Phuc is exhausted, must give up in the 33rd SEA Games walking event

|

On the evening of December 14, Nguyen Thi Thanh Phuc was forced to give up the women's walking event at the 33rd SEA Games due to a recurring and exhausted injury.

Workers in Quang Ngai worry when the arranging unit still owes billions in wages

|

Quang Ngai - The Transport Technical Training Center - is operating stably but is worried if the project to reorganize the apparatus is implemented.

The beach party suddenly involved a tragic shooting incident, killing 10 people

|

The two were detained after reports of a shooting that left many people dead or injured at Bondi Beach, Sydney, on December 14.

My Tien burst into tears after winning the silver medal, the Vietnamese sports delegation took part

|

The leaders of the Vietnamese sports delegation worked with the Water Sports Association after the incident of swimmer Vo Thi My Tien burst into tears on the podium to receive the 33rd SEA Games medal.

Overcoming shortcomings on the approach road connecting Bac Ninh - Hai Phong

Vân Trường |

Bac Ninh - The Provincial People's Committee has just issued an official dispatch on ensuring traffic safety on the road leading to Dong Viet bridge.

Bac Ninh will merge Tang Tien industrial cluster into Van Trung Industrial Park

Vân Trường |

Bac Ninh - The total area after merging Tang Tien industrial cluster into Van Trung Industrial Park is 388 hectares.

A business in Bac Ninh had 4.2 hectares of land reclaimed

Vân Trường |

Bac Ninh - The Provincial People's Committee has just issued a decision on the recovery of land managed by Thai Son Blu Company Limited.