On August 20, the Hanoi Department of Transport announced a plan to organize traffic flow on Au Co route (section from Thang Loi hotel intersection to Xuan Dieu intersection (near Quang An flower market) in Overpass Construction Project at An Duong - Thanh Nien Street intersection.
Accordingly, organize two-way traffic for all vehicles traveling on Au Co road (on the main road) inside the dike; Residential road (outside the dike) from Thang Loi hotel intersection to Xuan Dieu intersection (near Quang An flower market).
Organize traffic controlled by traffic lights and traffic controllers at 3 intersections on Au Co route, including: Xuan Dieu intersection (near Thang Loi Hotel), Tu Lien intersection (alley 124 Au Co), Xuan Dieu intersection (near Quang An flower market).
Continue to organize one-way traffic for cars on Xuan Dieu route (in the direction and section from the intersection with Au Co (near Quang An flower market) to the intersection with Au Co (near Thang Loi Hotel)) .
Traffic organization time starts from August 20, 2024.