The newly built route has a total length of about 740m passing through Kim Chung and Duc Giang communes of Hoai Duc district, Hanoi. The starting point of the route is at the intersection with Provincial Road 422 and the end point is at the intersection with Kim Chung - Di Trach route.
The route has a cross-section of 30m. In which, the roadway for traffic on both sides is 15m wide, the median strip is 5m wide and the sidewalks on both sides are 10m wide. The red line boundary of the route is determined based on the planned road center, the scale of the road cross-section and the technical specifications shown in the drawing.
Hanoi City assigned the People's Committee of Hoai Duc district to preside over and coordinate with relevant agencies to organize the public announcement and handover of approved route plans and road construction locations.