Traffic

Long Thanh airport is about to open, Ho Chi Minh City urgently completes connectivity

|

Ho Chi Minh City - Long Thanh Airport will be operational from mid-2026. Ho Chi Minh City directs acceleration of connecting transport projects to avoid congestion when the airport comes into operation.

Following Phu Tho Riverine Police to ensure safety during the festival season on the lake

|

Phu Tho - The Riverine Police force strengthens inspections on Hoa Binh Lake, resolutely preventing violating vehicles from leaving port.

People agree to expand Lang road, hoping for reasonable compensation

|

Hanoi - Before the proposal of the Department of Construction on the Lang road expansion project, many households supported the policy and hoped for satisfactory compensation.

Multiple car accident, local congestion on Bao Loc Pass

|

Lam Dong - A multi-vehicle accident between 3 cars in heavy rain caused local traffic congestion on Bao Loc Pass.

Commencement of a new road connecting National Highway 32 with National Highway 21A, investment of more than 572.3 billion VND

|

Hanoi - Phuc Tho Commune People's Committee simultaneously started construction of 6 large projects, including the project of the road connecting National Highway 32 with National Highway 21A.

Consulting on motorbike emission testing, people wait for early implementation

|

The Ministry of Transport continues to seek comments on the draft Decision of the Prime Minister on the roadmap for applying motorcycle emission standards.

There was a license plate that exceeded 7 billion in the auction on November 19

|

License plate auction: On the morning of November 19, Vietnam Joint Stock Auction Company organized an auction of 5,000 license plates in 3 time frames.

Struggling to get through a potholed road in the East of Ho Chi Minh City

|

HCMC - Phuoc Thien Street (Thu Duc City) is degraded, dirty, and full of potholes, making it difficult for vehicles to move around.

Hanoi focuses on implementing project to expand roads to 8-10 lanes

|

Hanoi - In November 2024, Thanh Tri district will hand over 100% of the land to construct the expansion of National Highway 1A, Van Dien - Ngoc Hoi section.

Faded or damaged signs may result in temporary suspension of road toll collection

|

From January 1, 2025, signs on national highways and expressways that are blurred or damaged may have to temporarily stop collecting road tolls.

Traffic jam nearly 2km long due to multiple accidents in Binh Duong

|

Binh Duong - On November 19, Di An City Police are investigating a series of accidents involving 3 vehicles that caused prolonged traffic congestion.

Many drivers were encouraged by Ho Chi Minh City Traffic Police to install surveillance cameras

|

Many trucks traveling on National Highway 22 were encouraged by the Northwest Traffic Police Station under the Ho Chi Minh City Traffic Police Department to install surveillance cameras to reduce accidents.

Colliding with a truck parked on Highway 1, 1 person in Binh Dinh died on the spot

|

Binh Dinh - While driving a motorbike on National Highway 1, through Tuy Phuoc district, a man crashed into the back of a truck parked on the side of the road and died on the spot.

Identifying challenges as Hanoi implements unprecedented low emission zone

|

Hanoi is finalizing a draft resolution on low-emission zones in the city. There are many challenges as this is unprecedented.

Growing vegetables on a hundred billion VND road in Hanoi took 4 years to complete

|

Hanoi - The unfinished 6-lane road project in Nam Tu Liem for many years has become a place for people to grow vegetables.

5 BOT projects at Ho Chi Minh City's gateway are expected to collect tolls for 18 to 25 years

|

HCMC - 5 BOT projects to upgrade National Highways 1, 13, 22, the North-South axis road, and Binh Tien bridge and road are expected to recover capital within 18-25 years, with flexible toll collection by trip or km.

Cases where toll stations will be removed from 1.1.2025

|

According to the new Circular of the Ministry of Transport, many cases will be released from road toll stations from January 1, 2025.

Ho Chi Minh City is about to establish 2 more project management boards and land fund centers

|

The establishment of two additional project management boards and a land fund development center is expected to improve the efficiency of construction investment and land management in Ho Chi Minh City.

Proposal to invest in 2 intersections on National Highway 51 under PPP form

|

Dong Nai proposed an investment plan to build and complete the Gate 11 intersection and Vung Tau crossroads on National Highway 51 under the PPP form.

New regulations on road toll collection from 1.1.2025

|

A representative of the Ministry of Transport said that from January 1, 2025, new regulations on road toll collection will be applied.