Traffic
The current condition of Vo Chi Cong street is being restored to its road surface
|
Hanoi - Vo Chi Cong Street is being restored to its road surface after a long period of partial barricades to serve the construction of the flood control system.
Ho Chi Minh City residents take free buses in the last 6 months of 2026
|
Ho Chi Minh City - From July 1 to the end of 2026, Ho Chi Minh City residents will be able to take free buses on 135 inter-provincial routes.
Starting traffic diversion for metro station construction on Van Cao street, Hanoi
|
Hanoi - Functional agencies begin barricading a part of Van Cao street to construct station S1 - Quan Ngua belonging to metro line No. 5.
Self-propelled truck crashes into power pole on National Highway 20 in Lam Dong
|
Lam Dong - A coffee truck suddenly drifted on its own, damaging many vehicles and breaking an electric pole on National Highway 20, fortunately no casualties were caused.
Workers stay up all night repairing Truong Tien bridge
|
HUE - Workers work overnight on Truong Tien bridge to keep up with the repair and maintenance progress of the iconic project of Hue.
Hanoi builds 2 projects worth VND1,400 billion, expands 10km of arterial road
|
Hanoi has just started 2 traffic projects in Ung Hoa and approved a project to upgrade and expand the 10km long arterial road in Soc Son.
Are clearing land to open a 50m wide central road in Hanoi
|
Hanoi - Some sections are being cleared to construct the Ring Road 1 project, Hoang Cau - Voi Phuc section, with an investment capital of more than VND 7,200 billion after many years of delay.
Starting construction of nearly 6,000 billion VND expressway running through Bac Kan
|
Bac Kan - On March 15, the Cho Moi - Bac Kan expressway project, nearly 29km long with a total investment of VND5,750 billion, was officially started.
Scene of a container truck hitting a median strip, causing prolonged traffic jams
|
Binh Duong - The container truck crashed into the median strip, causing other cars to crash into each other, on March 15 on My Phuoc Tan Van Street, Thuan An City.
Opening a 4-8 lane road connecting 5 districts and cities of Dong Nai province
|
Dong Nai - DT 770B road passing through 5 districts and cities is more than 42km long, with 4-8 lanes expected to approve the feasibility study report in the third quarter of 2025.
HCMC builds 2 canals along the canal, 30km long, connecting 7 districts
|
HCMC - 2 routes along the Tham Luong - Ben Cat canal, 30km long, passing through 7 districts, will open to traffic in some sections on April 30, completing the entire route by the end of 2025.
Striving to complete the 960 billion VND Hai Phong traffic project soon
|
The road project connecting the coastal road to Van Bun intersection (Do Son district, Hai Phong) is being accelerated, striving to finish in May 2025.
People live with danger waiting for a road opening project in Hanoi
|
Hanoi - People have been crowded with heavy trucks on Provincial Road 70 for many years, while the project was opened in 2020 but has not been completed yet.
Billion-dollar road in mountainous district of Thai Nguyen completed
|
Thai Nguyen - After more than 1 year of implementation, the project to expand the Tien Hoi - Hoang Nong inter-commune road in the mountainous district of Dai Tu has been completed.
Ho Chi Minh City residents hope for reasonable motorbike emission inspection fees
|
HCMC - The acceleration of the application of emission standards for motorbikes in Hanoi and HCMC is attracting the attention of people, with the expectation that the fee will be reasonable.
Road worth over VND50 billion/km in Tuyen Quang after 3 years of construction
|
Tuyen Quang - The route connecting Tuyen Quang - Phu Tho Expressway with National Highway.2D is expected to promote economic and social development, synchronizing traffic infrastructure.
Hanoi pilots new traffic in Ba Dinh
|
Hanoi The Department of Construction will pilot traffic organization adjustment on some routes in Ba Dinh District.
HCMC builds a road along the Saigon River more than 30m wide through the center
|
Ho Chi Minh City will build a 78km long Saigon River road, with a scale of 4-8 lanes, connecting from Cu Chi to Can Gio. In the immediate future, invest in the section from Ba Son Bridge to Saigon Bridge.
The billion-dollar intersection in the East of Ho Chi Minh City is expected to be completed in 2026
|
HCMC - After 9 years of construction, the My Thuy intersection project - a project expected to "rescue" traffic congestion in the East of HCMC continues to start construction in phase 3.
Electric vehicles break out, old car calling platform gradually loses its position
|
For the past half year, Ms. Hoang Lan (name changed) in Tay Mo ward, Nam Tu Liem district, Hanoi and her whole family have changed the habit of calling a technology car every time they move. If before, the family chose Be or Grab, now they have switched to calling SM Green electric cars.
