The An Phu intersection project is one of the key infrastructure projects of Ho Chi Minh City, with a total investment of more than 3,400 billion VND. The project connects important traffic axes such as Mai Chi Tho - Dong Van Cong, and supports traffic from Cat Lai port area to the Ho Chi Minh City - Long Thanh - Dau Giay expressway.
The opening of the N3 bridge branch has been recognized by many press agencies, reflecting the role of the project in completing the urban transport system.
According to the representative of the implementing unit, the request to organize the event was received on April 30, while the time of taking place was the morning of May 1. Preparation time was less than 24 hours, coinciding with the holiday, posing many challenges in terms of personnel, transportation and coordination.

In those conditions, the organizational items are still completed on schedule, ensuring a neat space, suitable for recording and communication requirements. The implementing unit is Saigon Light Event - a business operating in the field of event organization in Ho Chi Minh City.
Due to the specific nature of the organization at the construction site, one of the arising difficulties is that the power source is not available in the event area. The deployment team has implemented a plan to pull the power source from a location about 200 meters away, while calculating the power load and ensuring safety during operation.
In addition, items such as air gates, event carpets and space arrangements are also implemented in accordance with actual conditions, Saigon Light event contributes to ensuring the event image when appearing on media channels.
According to records, events related to transportation projects often require high progress, accuracy and adaptability to actual conditions. Completing events in a short time is considered an important factor contributing to the overall success of the program.
Saigon Light Event is a unit providing event organization services in Ho Chi Minh City, participating in the implementation of opening, groundbreaking, groundbreaking, inauguration, opening ceremony and infrastructure events.
Website: https://www.tochucsukiensaigon.com/index.html
028 3811 9599
Consulting hotline/Zalo: 0931 71 89 39 - 0935 727 663 -090.680.7969 – 0939 819 687
sukiensaigonlight@gmail. com