Hundred-billion-dong hospital in Hue deteriorated, lacking patients

PHÚC ĐẠT - NGUYỄN LUÂN |

HUE - Expected to be a modern medical facility in the southern area of Hue City, Chan May General Hospital is deteriorating and operating ineffectively.

Nam 2013, Benh vien da khoa Chan May (huyen Phu Loc, TP Hue) voi kinh phi dau tu hon 100 ti dong duoc di vao hoat dong. Chuc nang la benh vien hang III tuyen tinh, co so duoc ky vong la benh vien hien dai, phuc vu nhu cau kham, chua benh cua nguoi dan TP Hue khu vuc phia Nam.
In 2013, Chan May General Hospital (Phu Loc District, Hue City) with an investment of more than 100 billion VND was put into operation. Funging as a provincial-level Grade III hospital, the facility is expected to be a modern hospital, serving the medical examination and treatment needs of people in Hue City in the Southern region.
Sau mot thoi gian khai thac, benh vien tro nen vang ve, nhieu khu nha bi bo trong, hoat dong kem hieu qua.
After a period of operation, the hospital became deserted, many housing areas were left empty, and operations were ineffective.
 Nhieu hang muc cua benh vien xuong cap, khuon vien ngap trong cay co dai khien khong khi tai day tro nen hoang vu, nhech nhac.
Many items of the hospital are degraded, the campus is flooded with weeds, making the atmosphere here wild and shabby.
Ghi nhan cua PV Bao Lao Dong, phan tuong cua nhieu toa nha benh vien bi bong troc, loang lo, nhieu cho bam day reu phong. Nhieu toa nha, phong oc phia sau cua benh vien khong duoc khai thac su dung.
According to Lao Dong Newspaper, the walls of many hospital buildings are peeling and leaking, and many places are covered with moss. Many buildings and the rear rooms of the hospital are not exploited and used.
Bui ban, manh kinh vuong vai ben trong nhung can phong de trong.
Dust and broken glass are scattered inside the empty rooms.
Trong thoi gian hoat dong, Benh vien gap phai nhung kho khan nhu thieu hut nhan luc, luong nguoi den kham chua benh cung thua thot. Nam 2021, UBND tinh Thua Thien Hue (nay la UBND TP Hue) ban hanh Quyet dinh ha cap Benh vien da khoa Chan May tro thanh co so 2 cua Trung tam Y te huyen Phu Loc.
During its operation, the Hospital encountered difficulties such as shortage of human resources, and the number of people coming to see a doctor for treatment was also sparse. In 2021, the People's Committee of Thua Thien Hue province (now the People's Committee of Hue city) issued a decision to upgrade Chan May General Hospital to become the second facility of Phu Loc District Medical Center.
So Y te TP Hue cung nhieu lan khao sat, danh gia co so vat chat va trang thiet bi nham dua co so y te nay hoat dong hieu qua hon.
The Hue City Department of Health has also repeatedly surveyed and evaluated facilities and equipment to make this medical facility operate more effectively (images of one of the two hospital gates rusted and broken into scraps of scrap iron).
Phan tuong cua benh vien loang lo, reu phong.
The hospital walls are leaking and moss.
UBND TP Hue va nganh y te co chu truong giao Truong Dai hoc Y Duoc - Dai hoc Hue cung Benh vien Dai hoc Y Duoc Hue nghien cuu, xay dung Trung tam Y te huyen Phu Loc (co so 2) tro thanh mot benh vien truc thuoc Truong Dai hoc Y Duoc - Dai hoc Hue (hinh anh phong chua he thong bang dien khong duoc khoa, xung quanh la cay co um tum).
The People's Committee of Hue City and the health sector have a policy of assigning the University of Medicine and Pharmacy - Hue University and Hue University of Medicine and Pharmacy Hospital to research and build Phu Loc District Medical Center ( Facility 2) to become a hospital under the University of Medicine and Pharmacy - Hue University (images of the room containing the electrical panel system that is not locked, surrounded by overgrown grass).
Theo ong Nguyen Thanh Binh - Pho Chu tich UBND TP Hue, Benh vien da khoa Chan May (tuc co so 2 cua Trung tam Y te huyen Phu Loc) hoat dong ngay cang di xuong, chua dap ung duoc nhu cau cua nguoi dan va dinh huong phat trien khu vuc. Cung theo Pho Chu tich UBND TP Hue, don vi de nghi Truong Dai hoc Y Duoc - Dai hoc Hue ra soat cac dieu kien, tieu chuan de nang cao hieu qua cua benh vien nay.
According to Mr. Nguyen Thanh Binh - Vice Chairman of Hue City People's Committee, Chan May General Hospital (ie Facility 2 of Phu Loc District Health Center) operates more and more down, not meeting the needs of people and the orientation of regional development. Also according to Vice Chairman of Hue City People's Committee, the unit proposed the University of Medicine and Pharmacy - Hue University to review the conditions and standards to improve the effectiveness of this hospital.

PHÚC ĐẠT - NGUYỄN LUÂN
TIN LIÊN QUAN

Carefully buy a dilapidated apartment building worth over VND60 million/m2

|

Hanoi - The segment of old collective houses in central districts of Hanoi is attracting many people's attention despite the expensive selling price.

Image of the deterioration of Dong Kinh Stadium before Lang Son spent 500 billion VND to build a new one

|

Lang Son - Dong Kinh Stadium is seriously degraded, the new Sports Complex is about to be implemented.

Two unfinished resort projects have degraded in Lang Co Bay

|

Along the coast of Lang Co Bay (Phu Loc District, Hue City), two resort projects worth hundreds of millions of USD were built unfinished and then abandoned, many unused items have degraded.

The gift of May to the People: Exciting and sacred in each song to remember Uncle Ho

|

The art program "May gift to the Son" was held on the occasion of the 135th anniversary of President Ho Chi Minh's birth (May 19, 1990 - May 19, 2025).

Ho Quynh Huong gets married at the age of U50, the identity of her future husband has not been revealed yet

|

Ho Quynh Huong and her boyfriend will have a private wedding at a resort on Re Island (Quang Ninh) tomorrow, May 15.

Hour 9: Who is the worthy one? - Part 1

|

Hour 9 No. 155 - A widowed man wants to remarry, his children are worried about having their property taken over so they object. The new wife's pregnancy has caused suspicions. What will happen to this family?

Hundred-billion-dong hospital in Hue deteriorated, lacking patients

|

HUE - Expected to be a modern medical facility in the southern area of Hue City, Chan May General Hospital is deteriorating and operating ineffectively.

PVGas City is at risk of getting off the bench

|

PVGas City was audited and refused to give opinions due to failure to verify many financial amounts, internal problems, ... businesses facing the risk of canceling listings.

Carefully buy a dilapidated apartment building worth over VND60 million/m2

Thu Giang |

Hanoi - The segment of old collective houses in central districts of Hanoi is attracting many people's attention despite the expensive selling price.

Image of the deterioration of Dong Kinh Stadium before Lang Son spent 500 billion VND to build a new one

Khánh Linh |

Lang Son - Dong Kinh Stadium is seriously degraded, the new Sports Complex is about to be implemented.

Two unfinished resort projects have degraded in Lang Co Bay

PHÚC ĐẠT |

Along the coast of Lang Co Bay (Phu Loc District, Hue City), two resort projects worth hundreds of millions of USD were built unfinished and then abandoned, many unused items have degraded.