Close-up of launching of Phong Chau pontoon bridge spans

Tô Công |

Phu Tho - On the afternoon of September 28, each span of the pontoon bridge was launched by Brigade 249 of the Engineering Corps and assembled on the riverbank in Huong Non commune, Tam Nong district.

Theo ghi nhan cua phong vien Bao Lao Dong ngay 28.9, tai ben song thuoc khu 5, xa Huong Non, huyen Tam Nong, cac can bo chien si cua Lu doan Cong binh 249 (Binh chung Cong binh) tien hanh ha thuy cac nhip cau phao (cac dot khoi), chuan bi cho viec lap dat cau phao Phong Chau. Anh: To Cong.
According to the reporter of Lao Dong Newspaper on the afternoon of September 28, at the river wharf in Zone 5, Huong Non Commune, Tam Nong District, officers and soldiers of the 249th Engineering Brigade (Engineering Corps) launched the pontoon bridge spans (offshore segments), preparing for the installation of Phong Chau pontoon bridge. Photo: To Cong.
Nhung chiec xe chuyen dung di chuyen xuong ben. Anh: To Cong.
Specialized vehicles carrying offshore segments move down to the wharf. Photo: To Cong.
Noi duoc lap dat cau phao cach vi tri xay ra su co sap cau Phong Chau khoang 400m ve phia ha luu song Hong. Anh: To Cong.
The location where the pontoon bridge was installed is about 400m downstream of the Red River from the site of the Phong Chau bridge collapse. Photo: To Cong.
Se co hon 20 dot khoi duoc ha thuy. Anh: To Cong.
Over 20 offshore platforms have been launched. Photo: To Cong.
Ngay sau khi duoc ha thuy, cac can bo chien si cua Lu doan Cong binh 249 da khan truong dua vao bo de tap ket. Anh: To Cong.
Immediately after being launched, officers and soldiers of the 249th Engineer Brigade quickly brought the boat ashore for assembly. Photo: To Cong.
Cong viec duoc dien ra rat khan truong, chuyen nghiep. Anh: To Cong.
The work was carried out very urgently and professionally. Photo: To Cong.
Theo tim hieu cua phong vien, ngay mai 29.9, Lu doan 249 se chinh thuc lap dat cau phao Phong Chau. Chiec cau phao se dam bao giao thong thong suot, phuc vu nhu cau di lai cua Nhan dan. Anh: To Cong.
According to the reporter's findings, tomorrow, September 29, Brigade 249 will officially install the Phong Chau pontoon bridge, ensuring smooth traffic, serving the travel needs of the people. Photo: To Cong.
Khi to chuc bac cau, luc luong chuc nang se nghiem cam quay phim, ghi hinh va tu tap ngan can bo doi thuc hien nhiem vu. Den hom nay, cac chot chan da duoc lap. Anh: To Cong.
When organizing the bridge building, the authorities will strictly prohibit filming, recording, and gathering to prevent the soldiers from carrying out their duties. As of today, checkpoints have been set up. Photo: To Cong.
Tu ngay 30.9, Binh chung Cong binh bat dau dam bao thong cau phao Phong Chau. Thoi gian dam bao cau la tu 6h den 22h hang ngay. Doi voi nguoi, phuong tien duong bo ra vao cau phao, cac xe tho so, xe may, xe gan may, xe moto 3 banh duoc phep luu thong 2 chieu, van toc ≤ 5km/h; doi voi oto, chi cho phep cac loai xe o to con, xe ban tai (tu 2 den 4 cho ngoi), luu thong 1 chieu khi di qua cau, thoi gian moi chieu khi luu thong 10 phut, khoang cach giua cac xe ≤ 30m, van toc ≤ 10km/h... Anh: To Cong.
From September 30, the Engineering Corps began to ensure the operation of Phong Chau pontoon bridge. The bridge is guaranteed from 6am to 10pm every day. For people and road vehicles entering and exiting the pontoon bridge, rudimentary vehicles, motorbikes, scooters, and three-wheeled motorbikes are allowed to travel in two directions, at a speed of ≤ 5km/h; for cars, only cars and pickup trucks (from 2 to 4 seats) are allowed to travel in one direction when crossing the bridge, with a travel time of 10 minutes each way, a distance between vehicles of ≤ 30m, and a speed of ≤ 10km/h... Photo: To Cong.
Tô Công
TIN LIÊN QUAN

Những công đoạn cuối trước khi lắp cầu phao thay thế cầu Phong Châu

Tô Công |

Phú Thọ - Quân đội đang tiến hành những bước cuối cùng trước khi chính thức lắp đặt cầu phao thay thế cầu Phong Châu bị sập, phục vụ đi lại của nhân dân.

Quân đội gia cố cứng bến sông, sắp làm cầu phao thay cầu Phong Châu

Tô Công |

Phú Thọ - Đông đảo lực lượng quân đội đang tiến hành gia cố đường và bến bờ sông Hồng, chuẩn bị lắp cầu phao tạm thay thế cho cầu Phong Châu đã bị sập.

Vị trí sẽ lắp cầu phao sau sự cố sập cầu Phong Châu

Tô Công |

Phú Thọ - Một chiếc cầu phao sẽ được lắp đặt trên sông Hồng đoạn qua khu 5, xã Hương Nộn, huyện Tam Nông, cách nơi cầu Phong Châu bị sập khoảng 400m.

Israel tấn công, 3 lãnh đạo phong trào Palestine thiệt mạng

Song Minh |

Mặt trận Nhân dân Giải phóng Palestine (PFLP) cho biết 3 lãnh đạo của tổ chức này thiệt mạng trong cuộc không kích của Israel vào Beirut, Lebanon.

1 tài xế ôtô đưa đón học sinh dùng giấy phép lái xe giả

Duy Tuấn |

Bình Thuận - Một tài xế ôtô đưa đón học sinh dùng giấy phép lái xe giả bị phát hiện và xử phạt.

Vẫn khó giao dịch vàng nhẫn ở TPHCM

HẠ MÂY |

Nhiều người dân TPHCM đến các cửa hàng giao dịch vàng nhẫn, nhưng không thành, vì thời điểm này, các thương hiệu vàng lớn không có hàng để bán.

Nữ bác sĩ BV K bị tấm kính rơi vào người đã trở lại làm việc

Lệ Hà |

Nữ bác sĩ nội trú Hoàng Minh Lý công tác tại Bệnh viện K bị tấm kính ở quán cà phê rơi vào người đã hồi phục sức khỏe, trở lại làm việc.

Ông Chu Ngọc Anh, Đinh La Thăng không được đặc xá năm 2024

Ái Vân |

Các ông Chu Ngọc Anh, Phạm Xuân Thăng, Đinh La Thăng không nằm trong danh sách được đặc xá năm 2024.

Final steps before installing the pontoon bridge to replace Phong Chau bridge

Tô Công |

Phu Tho - The army is taking the final steps before officially installing a pontoon bridge to replace the collapsed Phong Chau bridge, serving people's travel.

The army is reinforcing the riverbank and is about to build a pontoon bridge to replace Phong Chau bridge

Tô Công |

Phu Tho - A large number of military forces are reinforcing the road and the banks of the Red River, preparing to install a temporary pontoon bridge to replace the collapsed Phong Chau bridge.

Location of pontoon bridge installation after Phong Chau bridge collapse

Tô Công |

Phu Tho - A pontoon bridge will be installed on the Red River through zone 5, Huong Non commune, Tam Nong district, about 400m from where Phong Chau bridge collapsed.