Bao Ngoc social housing project land left unused is a waste

NGỌC THÙY |

Bao Ngoc high-rise social housing project (Thach Ban, Long Bien, Hanoi) has become deserted after many years of abandonment.

Du an nha o xa hoi cao tang Bao Ngoc o quan Long Bien  (Cong ty co phan Dau tu xay dung va Co dien - IEC lam chu dau tu) co dien tich khoang 0,86 ha. Tong muc dau tu 1.138 ti dong, mat do xay dung 31,5% voi tong dien tich san 66.044 m2.
Bao Ngoc high-rise social housing project in Long Bien district (investor is IEC Construction and Mechanical Investment Joint Stock Company) has an area of ​​about 0.86 ha. Total investment is 1,138 billion VND, construction density is 31.5% with a total floor area of ​​66,044 m2.
Theo chu dau tu, du an duoc thiet ke xay dung voi loai hinh can ho chung cu gom 3 toa nha cao 25 tang va 3 tang ham, se cung cap ra thi truong khoang 800 can ho co dien tich 62 den 110 m2, thoi gian du kien hoan thanh la quy I/2024.
According to the investor, the project is designed and built with the type of apartment building including 3 buildings 25 floors high and 3 basements, will provide the market with about 800 apartments with an area of ​​62 to 110 m2, expected completion time is the first quarter of 2024.
Tuy nhien, theo ghi nhan cua Lao Dong ngay 11.1, hien khu dat nay khong co dau hieu hoat dong xay dung.
However, according to Lao Dong's records on January 11, there are currently no signs of construction activity on this land.
Nhieu phan dien tich dat co dai moc um tum, nguoi dan song quanh khu vuc nay trung dung lam noi nuoi gia cam, trong hoa mau.
Many areas of land are overgrown with weeds, and people living around this area use them to raise poultry and grow crops.
Du an dan bi hoang hoa do bo khong lang phi nhieu nam, chi co mot day nha duoc xay dung dang do.
The project gradually fell into disrepair due to years of abandonment, with only one row of unfinished houses remaining.
Duoc biet, khu vuc du an nha o xa hoi IEC Bao Ngoc va lo dat du an khu do thi ho tro - khu cong nghiep Sai Dong B truoc tinh trang bi lan chiem da duoc UBND phuong Thach Ban nhieu lan xu ly va treo bien thong bao yeu cau nguoi dan co tai san, hoa mau trong pham vi dat du an phai di doi truoc ngay 15.12.2024. Nhung den nay, hien trang khu vuc nay van chua duoc cai thien.
It is known that the IEC Bao Ngoc social housing project area and the land plot of the supporting urban area - Sai Dong B industrial park, facing the encroachment situation, have been handled many times by the People's Committee of Thach Ban ward and posted notices requiring people with assets and crops within the project land to relocate before December 15, 2024. However, up to now, the current situation of this area has not improved.
Moi day, to cong tac dac biet cua UBND TP Ha Noi da hop, thao go kho khan cho 3 du an dang cham trien khai, trong do co du an khu nha o xa hoi cao tang Bao Ngoc tai phuong Thach Ban (quan Long Bien).
Recently, a special working group of the Hanoi People's Committee met to remove difficulties for three projects that are slow to implement, including the Bao Ngoc high-rise social housing project in Thach Ban ward (Long Bien district).
Du an nay duoc xac dinh la co vuong mac lien quan den thu tuc giao dat, chuyen nhuong cung nhu chu truong dau tu, keo dai nhieu nam.
This project is identified to have problems related to land allocation and transfer procedures as well as investment policies, lasting for many years.
Chu tich UBND thanh pho Ha Noi Tran Sy Thanh chi dao cac so, nganh phoi hop voi chinh quyen dia phuong, to chuc kiem tra, ra soat, giai quyet dut diem cac vuong mac phat sinh thuoc tham quyen cua cac don vi. Doi voi noi dung vuot tham quyen, ong Tran Sy Thanh de nghi Van phong UBND TP Ha Noi tong hop va som bao cao Chinh phu, To cong tac dac biet cua Thu tuong Chinh phu xem xet, giai quyet thao go, bao dam loi ich cho nguoi dan va doanh nghiep.
Chairman of the Hanoi People's Committee Tran Sy Thanh directed departments and branches to coordinate with local authorities to organize inspections, reviews, and thoroughly resolve arising problems under the authority of the units. Regarding the contents beyond the authority, Mr. Tran Sy Thanh requested the Office of the Hanoi People's Committee to synthesize and promptly report to the Government and the Prime Minister's Special Working Group for consideration, resolution, and ensuring benefits for people and businesses.
NGỌC THÙY
RELATED NEWS

Social housing investment - still far from the target of 1 million units

|

Despite positive developments in social housing development, the target of building 1 million units by 2030 remains elusive. The number of social housing units completed in the past four years has been relatively modest.

Social housing project on prime land of over 2,700m2 is about to be handed over

|

Hanoi - NHS Trung Van social housing project (Nam Tu Liem district) is built on a total area of ​​2,726.1m2, expected to be handed over in the first quarter of 2025.

Deploying dozens of social housing projects in Thanh Hoa by 2025

|

Thanh Hoa province decided to allocate dozens of land plots to implement social housing projects in 2025.

Weather forecast changes from the night of the 1st day of Tet due to stronger cold air

|

According to the meteorological agency, the weather forecast in the North will change from the night of the 1st day of Tet, the weather will turn cold due to increased cold air.

Warm embraces of care for the elderly at the nursing home during Tet

|

Hanoi - Leaving aside Tet alone, the team of young nurses at Nhan Ai Nursing Home wholeheartedly cares for and brings a warm and peaceful spring atmosphere to the elderly.

Queuing to buy boiled chickens for 1 million VND/chicken, roasted birds in the "rich market" of Hanoi

|

Hanoi - Hang Be market is bustling as families buy year-end offerings. Many shops are busy and cannot sell in time, customers line up in long lines.

Binh Ngo Tet of "Jade Emperor" Quoc Khanh and the Tao Quan artists

|

On Binh Ngo Tet, People's Artist Quoc Khanh played Ngoc Hoang in the movie series "Oh my god! Where are we going?", while Meritorious Artist Chi Trung participated in "Spring Square".

Spending millions to hunt for beautiful places to watch New Year's Eve fireworks at Hoan Kiem Lake

|

Hanoi - Many people are willing to spend millions of VND to have a seat with beautiful views to watch fireworks in the Hoan Kiem Lake area on New Year's Eve.

Social housing investment - still far from the target of 1 million units

Phan Anh |

Despite positive developments in social housing development, the target of building 1 million units by 2030 remains elusive. The number of social housing units completed in the past four years has been relatively modest.

Social housing project on prime land of over 2,700m2 is about to be handed over

Thu Giang - Hải Nguyễn |

Hanoi - NHS Trung Van social housing project (Nam Tu Liem district) is built on a total area of ​​2,726.1m2, expected to be handed over in the first quarter of 2025.

Deploying dozens of social housing projects in Thanh Hoa by 2025

QUÁCH DU |

Thanh Hoa province decided to allocate dozens of land plots to implement social housing projects in 2025.