The first stadium in the Yen Bai highlands was renovated

Trần Bùi |

The first stadium of Yen Bai city is being renovated with a new, modern look to serve the cultural and sports needs of the people.

Theo ghi nhan cua Lao Dong ngay 4.11,
According to Lao Dong Newspaper on November 4, at Yen Bai City Stadium, construction is underway to replace the soccer field and Marathon track.
Ong Nguyen Dinh Son (54 tuoi, Hong Ha, TP Yen Bai) cho biet: “Doi voi nguoi dan Yen Bai, day la khong chi la san van dong ma con la mot di tich de nhac nho nhung the he sau ve loi Bac can dan nhan dan Yen Bai, Phai doan ket chat che cac dan toc, Bac biet tinh nha co 10 dan toc anh em cung chung song; nho doan ket ma tao ra suc manh trong chien dau cung nhu san xuat; Phai lam the nao de doi song nhan dan suong hon, duoc an no, mac am, duoc hoc hanh; Dong bao phai biet thuc hanh tiet kiem va thuc hien doi song van hoa moi
The field is under renovation.
Le dai nay thuoc phuong Hong Ha, thanh pho Yen Bai. Le dai nguyen la khan dai san van dong thi xa xua. San va Le dai nam trong khu vuc dong dan cu, trung tam cua tinh ly truoc day. Duong giao thong di lai rat thuan tien, co the di den Di tich bang moi phuong tien. Di tich cach ga Yen Bai chung 600m ve phia Tay va cach Ben xe khach Yen Bai khoang 1,2 km cung theo huong nay.
The historical site of the Stadium (Yen Bai City Stadium) is located in Hong Ha ward, about 600m west of Yen Bai station and about 1.2km from Yen Bai bus station in the same direction. Mr. Nguyen Dinh Son (54 years old, Hong Ha, Yen Bai city) said: "For the people of Yen Bai, this is not only a stadium but also a destination, an address for people and tourists to visit, burn incense to commemorate Uncle Ho, forever a place to preserve sacred memories of the great leader - President Ho Chi Minh in the hearts of the people of all ethnic groups in Yen Bai province".
Di tich duoc cong nhan di tich lich su cap Quoc gia ngay 16.11.1988 cua Bo Van hoa (nay la Bo Van hoa, The thao va Du lich).
The relic was recognized as a national historical relic on November 16, 1988 by the decision of the Ministry of Culture (now the Ministry of Culture, Sports and Tourism).
v
The stage is 10m long, 5.5m wide, 8.2m high and has 2 floors. The first floor has an area of ​​42m2, including 3 entrances, the second floor has a similar area, divided into 2 parts. The outer part is where President Ho Chi Minh stood to speak at the rally on September 25, 1958.
Nam 2016, khu Di tich le dai da duoc cai tao nang cap bao gom 7 hang muc cong trinh, chinh trang nang cap 2 tuyen duong tiep can voi san van dong, cai tao mo rong khu tuong niem Bac Ho va hai ben khan dai voi quy mo 4.300 cho ngoi, xay dung he thong phu tro cap thoat nuoc, phong chay, chua chay, chieu sang, thu set. Di tich le dai va toan bo kien truc cua khu vuc tuong niem Bac duoc thiet ke theo loi kien truc truyen thong, mo phong theo kien truc tuong niem Bac Ho tai Kim Lien - Nghe An que Bac, voi chat lieu chu yeu bang go va gia go, su dung hoan toan bang cac hoa van von co cua dan toc nhu hoa van hinh song nuoc, hinh chu tho va hoa van hoa sen, hoa cuc cach dieu mem mai va tinh te, cang lam tang them dang ve truyen thong, khang trang nhung dam da ban sac dan toc Viet Nam.
In 2016, the Memorial Stage was renovated and upgraded with 7 construction items: Renovating and expanding the Uncle Ho memorial area and the two stands with a capacity of 4,300 seats, and building an auxiliary system.
Di tich le dai va toan bo kien truc cua khu vuc tuong niem Bac duoc thiet ke theo loi kien truc truyen thong, mo phong theo kien truc tuong niem Bac Ho tai Kim Lien - Nghe An que Bac, voi chat lieu chu yeu bang go va gia go, su dung hoan toan bang cac hoa van von co cua dan toc nhu hoa van hinh song nuoc, hinh chu tho va hoa van hoa sen, hoa cuc cach dieu mem mai va tinh te, cang lam tang them dang ve truyen thong, khang trang nhung dam da ban sac dan toc
The memorial platform and the entire architecture of the Uncle Ho memorial area are designed in traditional architectural style, modeled after the Uncle Ho memorial architecture in Kim Lien - Nghe An, with materials mainly made of wood and imitation wood.
Trao doi voi Lao Dong dai dien Ban Quan ly du an dau tu xay dung TP Yen Bai cho biet, mat co, nao vet cong ranh hom bao vua roi, nam trong cong trinh khan cap 2 9,5 ti dong sua chua nguy cap nam vua roi,  cong ty xay dung so 2
Speaking with Lao Dong Newspaper, a representative of the Yen Bai City Construction Investment Project Management Board said that after the storm and flood, the natural grass surface and drainage system at Yen Bai City Stadium were severely damaged.
“Hang muc thay the mat co san va nao vet cong ranh san nam trong du an khac phuc cong trinh sau bao lu voi tong muc dau tu 9,5 ti dong cua du an. Duoc khoi cong ngay 24.10 va du kien hoan thien vao 15.11, do Cong ty Co phan xay dung so 2 la don vi thi cong“.
"The project of replacing the field's grass surface and dredging the field's sewers is part of the project to restore the works after the storm and flood with a total investment of 9.5 billion VND, expected to be completed on November 15 by Construction Joint Stock Company No. 2," the representative informed.
May moc dang tap trung tren cong truong thay the mat co.
Machinery is gathering on site to replace the turf.
duong
The Marathon course is also set to be replaced.

After completing the conquest and establishment of Yen Bai province in 1900, in 1905 the French established a French Foreign Legion barracks to protect their government. To serve the soldiers' lives, in 1927 the French built this stadium to organize festival and soccer activities.

By 1930, the stadium was completed, and since then, France has regularly organized recreational activities here.

In 1954, peace was restored, Yen Bai province decided to restore the football field into a town stadium. In January 1957, the province built a grandstand (the current stage) and a wall surrounding the field in an oval shape.

The most important historical event was on September 25, 1958, when the Government delegation led by President Ho Chi Minh visited Yen Bai province. During his time in the province, at the request of President Ho Chi Minh, the Provincial Administrative Committee chose the town stadium as the rally venue for Uncle Ho to speak to the people of all ethnic groups in the province.

Trần Bùi
TIN LIÊN QUAN

Yen Bai spends nearly 20 billion to repair vital road

|

Yen Bai - After a long period of degradation, the vital road connecting IC12 intersection to Van Hoi has just received tens of billions of dong in investment for upgrading.

Yen Bai people expect the hundred billion overpass to be completed soon

|

Yen Bai - The project to invest in building a railway overpass in An Binh commune, Van Yen district was expected to be completed in 2023 but is still unfinished.

Khe Rong Waterfall is like a fairyland in the mountains and forests of Yen Bai

|

Yen Bai - Multi-tiered waterfall in Khe Rong village, An Binh commune, Van Yen district, clear all year round, beautiful landscape.

Two more projects connecting Yen Bai with Noi Bai - Lao Cai expressway

|

Yen Bai - 2 completed and soon-to-be-completed routes play a particularly important role in connecting the highlands with the Noi Bai - Lao Cai highway.

Mr. Tran Huy Tuan was elected to hold the position of Secretary of Yen Bai Provincial Party Committee

|

Based on the election results, the Yen Bai Provincial Party Committee's Organizing Committee will complete the dossier to submit to the Central Committee for approval of the position of Provincial Party Secretary according to regulations.

Tomorrow, gasoline prices are expected to increase sharply

|

Gasoline prices at tomorrow's adjustment period (November 7) are forecast to increase following the world trend, with an increase of about 380-790 VND/liter.

Cao Bang City has not reported the sand mine incident and the hundred billion dust blowing project

|

Cao Bang - Cao Bang City People's Committee has yet to report on the project to build the Traditional Medicine Hospital and Dong Tam sand mine causing dust in the heart of the city.

Lack of radioactive medicine production reactors in Ho Chi Minh City, patients have to wait for a long time

|

According to records at hospitals in Ho Chi Minh City, the demand for PET/CT for cancer diagnosis and treatment monitoring is increasing, while the number of radioactive drugs provided for this purpose is limited, causing patients to wait for a long time.

Yen Bai spends nearly 20 billion to repair vital road

Trần Bùi |

Yen Bai - After a long period of degradation, the vital road connecting IC12 intersection to Van Hoi has just received tens of billions of dong in investment for upgrading.

Yen Bai people expect the hundred billion overpass to be completed soon

Trần Bùi |

Yen Bai - The project to invest in building a railway overpass in An Binh commune, Van Yen district was expected to be completed in 2023 but is still unfinished.

Khe Rong Waterfall is like a fairyland in the mountains and forests of Yen Bai

Trần Bùi |

Yen Bai - Multi-tiered waterfall in Khe Rong village, An Binh commune, Van Yen district, clear all year round, beautiful landscape.