Hot Saigon: A section of Ring Road 3 will be technically open to traffic on April 30

ĐÔNG DU - MINH TÂM |

HCMC increases bus fares by 40% on April 30 and 1.5; Fire at Thu Duc, mother dies after returning to save her child... is Hot Saigon news No. 2.4.

ĐÔNG DU - MINH TÂM
TIN LIÊN QUAN

Hot Saigon: Thunderstorms in April in the South

|

Hot Saigon News on September 1: Thunderstorms in April in the South; Ho Chi Minh City will expand National Highway 13 to accommodate 10 lanes connecting Binh Duong;...

Hot Saigon: Thunderstorms and high tides in the South

|

Hot Saigon News on March 31: Thunderstorms and high tides in the South; Trucks overturned on the Ho Chi Minh City Y bridge, traffic chaos;...

Hot Saigon: Time of increased thunderstorms in the South

|

Hot Saigon News on March 30: Time of increased thunderstorms in the South; finalizing the 10th grade enrollment plan in Ho Chi Minh City;...

Removing bottlenecks, the 329 billion VND bypass in Tuyen Quang is about to reach the finish line

|

After the problems with the site were resolved, the bypass route worth more than 329 billion VND in Tuyen Quang is accelerating to the finish line.

Removing obstacles for 2 BT projects worth nearly VND2,000 billion in Thai Nguyen

|

The Deputy Prime Minister has issued instructions to remove obstacles for 2 construction projects under BT contracts in Thai Nguyen province.

Forecast for heavy rain in the North due to cold air, some places over 50mm

|

According to the meteorological agency, the Northwest region is about to have rain, with some places having heavy rain over 50mm.

Panorama of raising the steel roof of Long Thanh airport terminal weighing 5,300 tons using a pull-up and push-up solution

|

Dong Nai - The steel roof of the Long Thanh airport passenger terminal weighing 5,300 tons was successfully lifted with a towing and pushing solution using a hydraulic shock system.

The Politburo proposed that the Party Central Committee consider disciplining Mr. Truong Hoa Binh

|

On April 4, 2025, at the Party Central Committee Headquarters, the Politburo reviewed and disciplined party members who violated and had shortcomings.

Hot Saigon: Thunderstorms in April in the South

NGỌC ÁNH - CHÂN PHÚC |

Hot Saigon News on September 1: Thunderstorms in April in the South; Ho Chi Minh City will expand National Highway 13 to accommodate 10 lanes connecting Binh Duong;...

Hot Saigon: Thunderstorms and high tides in the South

Thanh Chân - Ngọc Lê |

Hot Saigon News on March 31: Thunderstorms and high tides in the South; Trucks overturned on the Ho Chi Minh City Y bridge, traffic chaos;...

Hot Saigon: Time of increased thunderstorms in the South

NGỌC ÁNH - CHÂN PHÚC |

Hot Saigon News on March 30: Time of increased thunderstorms in the South; finalizing the 10th grade enrollment plan in Ho Chi Minh City;...