Khanh Hoa Traffic Police handle the incident of a tanker truck leaking oil for more than 1km on National Highway 1

Hữu Long |

Khanh Hoa - The Traffic Police force has coordinated to handle the incident of a tanker truck traveling on National Highway 1 from South to North leaking and leaking oil on the road.

In the early morning of August 4, Ninh Hoa Traffic Police Station (Traffic Police Department of Khanh Hoa Provincial Police) received information from Dai Lanh Commune Police about a leaked oil tanker traveling on National Highway 1 in the South - North direction.

This caused oil to flow on the road section through Dai Lanh commune (old Van Ninh district). This affected area is more than 1km long and about 2m wide, posing a potential risk to traffic safety.

Immediately after receiving the report, Ninh Hoa Traffic Police Station coordinated with Dai Lanh Commune Police, Fire Prevention and Rescue forces and Road Management Department III to urgently arrive at the scene to organize warnings and regulate traffic.

The units spread sand and cleared the incense oil to avoid accidents.

Luc luong CSGT tinh Khanh Hoa phoi hop xu ly su co xe bon cho dau luu thong tren Quoc lo 1 huong Nam – Bac bi ro ri. Anh: CSGT tinh Khanh Hoa
Khanh Hoa Provincial Traffic Police force coordinated to handle the leaked oil tanker truck incident on National Highway 1 in the South - North direction. Photo: Khanh Hoa Provincial Traffic Police

The vehicle involved in the incident was a tanker truck carrying liquid oil (used as a road asphalt) with license plate 51C-797.92 belonging to Duc Thanh Cu Chi Company Limited, driven by Mr. Nguyen Ngoc Anh (49 years old, residing in Ho Chi Minh City).

Ninh Hoa Traffic Police Station is coordinating with relevant units to continue collecting information, clarifying the cause of the incident; at the same time, determining the responsibility of the transport unit in ensuring the technical safety of the vehicle.

Hữu Long
RELATED NEWS

Khanh Hoa increases the frequency of meetings and dialogues to remove difficulties for businesses and investors

|

Khanh Hoa - The locality has just requested to strengthen coordination in meeting, resolving recommendations, and removing difficulties for businesses and investors in the area.

Khanh Hoa ensures smooth administrative procedures after the arrangement of two-level government

|

Khanh Hoa - Chairman of the Provincial People's Committee Tran Quoc Nam requested to ensure the operation of the 2-level local government model.

Khanh Hoa adds 28 projects with problems, bringing the total to 245 projects with long-standing backlog

|

Khanh Hoa has reported on the results of reviewing and updating additional 28 investment projects facing difficulties and obstacles, bringing the total to 245 projects with long-standingstanding.

Police and military soldiers wade in mud to help people in flooded areas in Dien Bien

|

Dien Bien - Hundreds of police officers and soldiers, working day and night, wade in mud to search for missing people, supporting people to overcome floods.

Mr. Trump confirms he will send a special delegate to Russia

|

Mr. Trump confirmed that US special missionary Steve Witkoff will visit Moscow to seek a solution to the Russia-Ukraine conflict.

The last words of referee Tran Dinh Thinh before passing away

|

Referee Tran Dinh Thinh still determined to complete the inspection before passing away and passing away.

Former volleyball beauty queen Pham Thi Yen's husband confides in his partner

|

Former volleyball beauty queen Pham Thi Yen always has a special companion from her partner.

List of enterprises expected to honor "Outstanding Enterprises for Workers" in 2025

|

The 2025 "Outstanding Enterprise for Workers" Award is a prestigious socio-political event chaired by the Vietnam General Confederation of Labor, in coordination with the Ministry of Home Affairs and the Vietnam Federation of Commerce and Industry (VCCI), assigned to Lao Dong Newspaper to directly implement.

Khanh Hoa increases the frequency of meetings and dialogues to remove difficulties for businesses and investors

Hữu Long |

Khanh Hoa - The locality has just requested to strengthen coordination in meeting, resolving recommendations, and removing difficulties for businesses and investors in the area.

Khanh Hoa ensures smooth administrative procedures after the arrangement of two-level government

Bình Quý |

Khanh Hoa - Chairman of the Provincial People's Committee Tran Quoc Nam requested to ensure the operation of the 2-level local government model.

Khanh Hoa adds 28 projects with problems, bringing the total to 245 projects with long-standing backlog

Hữu Long |

Khanh Hoa has reported on the results of reviewing and updating additional 28 investment projects facing difficulties and obstacles, bringing the total to 245 projects with long-standingstanding.