Van Phu ward was established on the basis of arranging the natural area and population size of Van Phu ward, Phuong Lau commune, Hung Lo commune and Kim Duc commune of former Viet Tri city, Phu Tho province.
The project to renovate and upgrade Tran Toai road section from the old Phuong Lau Commune People's Committee to Nguyen Tat Thanh road and the branch line in Van Phu ward was approved by the People's Committee of this ward according to Decision No. 1135/QD-UBND dated December 9, 2025.
This is a project belonging to Group C, with a total investment of nearly 50 billion VND invested by the Van Phu Ward Project Management Board.
According to the reporter's investigation, the Van Phu Ward Project Management Board recently issued a bidding invitation notice for Package No. 07: Construction of the project.
Package No. 07 was widely bid through the network, with a price of nearly 43 billion VND from the state budget and mobilizing other legal capital sources.
In the near future, after the above-mentioned construction package completes the contractor selection, the winning bidder will construct Tran Toai road, 3,644.99m long, with the starting point intersecting with Nguyen Tat Thanh road, and the ending point intersecting with Truong Chinh road (section near the old Phuong Lau Commune People's Committee headquarters).

The route map is designed to ensure technical requirements for level V mountain roads, with a speed of 30km/h.
According to the design, the section from Km0+00 to Km2+236.21 will have a road surface width of 7m, rolling ditches on both sides 0.3m each for sidewalk sections, and on sections without sidewalks on both sides, at least 0.5m each.
The section from Km2+236.21 to Km3+196.25m will have a minimum roadbed of 6m; road surface width of 5m, sidewalks on both sides of at least 0.5m each.
The section from Km3+196.25 to Km3+644.99 will have a minimum roadbed of 7m; road surface width of 6m, sidewalks on both sides of at least 0.5m each.
With the branch line, with a length of 113.59m connecting from Tran Toai road at Km2+550 connecting to An Thai communal house, old Phuong Lau commune. This section will have a roadbed width of 4.5m; road surface width of 5m, roadside width of at least 0.5m.
The project will also construct items such as: sidewalks, intersections and residential roads, drainage works, traffic safety systems, lighting...
Previously, Van Phu ward also completed the selection of contractors for the project to renovate and upgrade the traffic road from Hung Vuong street to Cultural House area 2 - Kim Duc.
This project has a total investment of nearly equivalent to the Tran Toai road renovation and upgrade project (49.5 billion VND). Toan Thinh Joint Stock Company is the enterprise that won Package No. 8: Construction of the project with a price of nearly 31.7 billion VND.
The above-mentioned contractor will officially construct the renovation and upgrading of the road from Hung Vuong Avenue to the Cultural House of Zone 2 - Kim Duc (old Kim Duc commune) 2.8km long in 360 days.