Hanoi comprehensively reviews and handles degraded urban railway items

Minh Hạnh |

Hanoi is exploiting and immediately handling damaged and degraded urban railway items to ensure safety and urban aesthetics.

Hanoi City People's Committee requests urgent review of all urban railway lines under operation, and immediately handle damaged and degraded items to ensure safe operation.

According to the request, relevant units urgently inspect, review and handle damaged, degraded, and potentially unsafe items on all urban railway lines under operation, ensuring operational safety, traffic safety and urban aesthetics.

Accordingly, the Hanoi People's Committee assigned the Department of Construction to coordinate with Hanoi Railway Company Limited to organize a comprehensive review of construction items showing signs of damage, degradation or potential safety risks on operating urban railway lines.

Units are responsible for immediately handling existing issues under their authority; and at the same time reporting to the Hanoi People's Committee for contents beyond their authority for timely consideration and direction. Inspection and rectification must be implemented urgently and effectively, not allowing risks to arise affecting the safety of works, safety of operation and exploitation, traffic safety and urban aesthetics.

This move aims to strengthen inspection and risk prevention for the urban railway system in the context that the network is increasingly playing an important role in the capital's public passenger transport.

Proactively detecting and overcoming damage early will contribute to limiting the risk of incidents, ensuring safe and continuous operation, and at the same time enhancing people's trust in modern public transport.

Previously, records by reporters of Construction Newspaper at some stations on the Cat Linh - Ha Dong urban railway line showed that many items no longer maintained their synchronous and modern appearance as when they were newly put into operation. At many locations, escalators stopped operating, glass railings were cracked and broken, and panels peeled off.

Minh Hạnh
RELATED NEWS

Vinhomes - VinSpeed consortium informs about the preparation for building 5 urban railway lines

|

Representatives of Vingroup inform about the preparation for the deployment of 5 new urban railway lines of Hanoi.

Hanoi urgently establishes a working group to develop urban railways

|

Hanoi requests the Department of Construction to soon establish a Working Group to deploy urban railways in the 2026-2030 period, and complete the investment report for the nearly 1,000km metro network.

Warning of heavy rain in 2 provinces and cities, dangerous weather risk in the next 6 hours

|

The meteorological agency warns that Son La, Thanh Hoa, and Da Nang have had moderate to heavy rain; there is a risk of flash floods and landslides in some communes and wards.

Can Gio - Vung Tau sea-crossing road will build 2 lotus-shaped tunnel entrances

|

Ho Chi Minh City - The Can Gio - Vung Tau sea-crossing road will start construction on July 1st with the highlight being 2 scope of lotus-shaped tunnel entrances.

Ho Chi Minh City transfers and appoints 34 leading officials

|

Ho Chi Minh City transfers, appoints and assigns work for 34 leading officials of departments, branches, localities, units and state-owned enterprises.

Gold prices fall deeply, experts point out "bottom-fishing" scenario

|

Although gold prices are falling, falling from the 4,000 USD/ounce level at many times, some experts still consider this an opportunity to "catch bottom" to welcome a long-term upward cycle.

Vị trí 5 tuyến đường sắt đô thị vừa được Hà Nội đồng loạt khởi công

Phương Anh |

Sáng 22.6, UBND TP Hà Nội tổ chức Lễ khởi công đồng thời 5 tuyến đường sắt đô thị với tổng mức đầu tư sơ bộ khoảng 1.315.256 tỉ đồng.

Vinhomes - VinSpeed consortium informs about the preparation for building 5 urban railway lines

Xuyên Đông |

Representatives of Vingroup inform about the preparation for the deployment of 5 new urban railway lines of Hanoi.

Hanoi urgently establishes a working group to develop urban railways

Minh Hạnh |

Hanoi requests the Department of Construction to soon establish a Working Group to deploy urban railways in the 2026-2030 period, and complete the investment report for the nearly 1,000km metro network.