Starting construction of a bridge worth nearly 180 billion VND with unique architecture in Ninh Binh

NGUYỄN TRƯỜNG |

Ninh Binh - On the morning of June 28, the People's Committee of Hoa Lu city organized the groundbreaking ceremony for the construction of a bridge across the Trang An river with a total investment of nearly 180 billion VND.

The bridge is located at the intersection of Le Thai To Street and Trang An Street, Tan Thanh Ward, Hoa Lu City, this is the 5th project the city has held the Inauguration Ceremony and started construction to celebrate the Party Congresses at all levels, term 2025 - 2030.

The project to build a bridge across Trang An River at the intersection of Le Thai To Street and Trang An Street, Tan Thanh Ward, Hoa Lu City was approved by the City People's Council in Resolution No. 39 dated October 10, 2024 and organized by the City People's Committee to conduct a competition, approving the results of the project's architectural design competition in Decision No. 3187 dated April 14, 2025.

Phoi canh cau qua song Trang An. Anh: Xuan Hung
Perspective of the bridge over the Trang An River. Photo: Xuan Hung

This is one of the city's iconic key projects in the new development stage, gradually completing and connecting the waterway transport network between areas, focusing on Trang An, Tam Coc Bich Dong tourist areas with neighboring areas. Thereby, contributing to the synchronous completion of urban traffic infrastructure, urban drainage, ensuring traffic safety for vehicles, people and tourists, promoting the development of services, tourism, socio-economic development and building Ninh Binh urban area.

The project has a construction investment scale including 2 parallel bridges and is 11.8m apart. The cross-section of a single unit is 16.5m wide (the road surface is 10.5m wide, the railing on both sides is 1m wide, the sidewalk on the one side is 5m wide).

At the location between the two bridge units, there is a pedestrian bridge and a view attic with a cross-section of 7.9m wide (7.1m pedestrian surface + railings on both sides of the bridge are 0.8m wide). The viewing tower is arranged in the middle of the pedestrian bridge with a scale of about 163.84m2 (12.8m x 12.8m).

At both ends of the bridge, an underpass is arranged to connect the pedestrian from the walking path on both sides of the river to the pedestrian bridge and the scenic tower.

The total investment of the project is nearly 180 billion VND from the city budget. Project implementation period: 2024 - 2027.

NGUYỄN TRƯỜNG
RELATED NEWS

Preparing to start construction of Bao Loc - Lien Khuong expressway worth nearly VND 12,000 billion

|

Lam Dong - The groundbreaking ceremony for Bao Loc Lien Khuong Expressway will take place on June 29.

Hanoi is about to start construction of 2 bridges across the Red River on Ring Road 4

|

Hanoi - It is expected that in 2025, the city will start construction of the Hong Ha and Me So bridges across the Red River on Ring Road 4.

Tomorrow, Hanoi will start construction of a bridge worth more than 20,000 billion VND connecting Tay Ho with Dong Anh

|

Hanoi - The Tu Lien Bridge project and the approach roads at both ends of the Tay Ho bridge connecting Dong Anh, with an investment capital of more than 20,000 billion VND, will start construction tomorrow (May 19).

V.League final round 2025-2026 and the pressure of 3 coaches

|

Coaches Le Duc Tuan, Tran Tien Dai, Hua Hien Vinh will enter the final round with the goal of helping their team stay in the V.League.

Fruit festival opens up favorable production direction

|

Dong Thap - The Fruit Festival aims to open up a favorable production direction, creating motivation to promote the fruit industry to move towards green and circular production.

Vietnam General Confederation of Labor sets a target to build more than 10,700 houses for workers to rent

|

Implementing the tasks assigned in the Project to develop at least 1 million social housing units in the period 2021-2030, the Vietnam General Confederation of Labor is implementing housing projects for workers to rent in many localities.

Prime Minister Le Minh Hung presents flowers to congratulate the Executive Committee of the 14th Vietnam General Confederation of Labour

|

At the 14th Vietnam Trade Union Congress, Prime Minister Le Minh Hung presented flowers to congratulate the Executive Committee of the 14th Vietnam General Confederation of Labor, term 2026-2031.

Series of high schools in Ho Chi Minh City forecast to have benchmark scores from 20 points or higher

|

Ho Chi Minh City - The 10th grade exam score level for 2026 is forecast to be positive, leading to the possibility of a slight increase in benchmark scores in many high schools.

Preparing to start construction of Bao Loc - Lien Khuong expressway worth nearly VND 12,000 billion

LAM HỒNG |

Lam Dong - The groundbreaking ceremony for Bao Loc Lien Khuong Expressway will take place on June 29.

Hanoi is about to start construction of 2 bridges across the Red River on Ring Road 4

HỮU CHÁNH |

Hanoi - It is expected that in 2025, the city will start construction of the Hong Ha and Me So bridges across the Red River on Ring Road 4.

Tomorrow, Hanoi will start construction of a bridge worth more than 20,000 billion VND connecting Tay Ho with Dong Anh

HỮU CHÁNH - KHÁNH AN |

Hanoi - The Tu Lien Bridge project and the approach roads at both ends of the Tay Ho bridge connecting Dong Anh, with an investment capital of more than 20,000 billion VND, will start construction tomorrow (May 19).