The first billion-VND construction packages in Phu Tho in 2026

Tô Công |

Phu Tho - In the first week of 2026, investors in the province have deployed contractor selection for a number of large-value construction packages.

As of January 7, 2026, localities in Phu Tho province such as: Thanh Mieu Ward, Phuc Yen Ward, Tam Nong Commune, Van Ban Commune, Bao La Commune... have implemented bidding for a number of construction packages worth billions of VND.

In which, the project to renovate and upgrade the inter-zone Noi Danh Go Muoi traffic road in Van Ban commune, Phu Tho province is the project with the largest valued construction and installation package.

The above project was approved according to Decision No. 364/QD-UBND dated November 24, 2025 of Van Ban Commune People's Committee, the total investment of the project is nearly 20 billion VND, the Investor is Van Ban Commune Public Service Center.

According to the bidding invitation notice of the investor, Package No. 05 - Construction of the project is priced at more than 18.1 billion VND from the State budget and mobilized from other legal capital sources.

This construction package will build a road with a total length of 2,031.16m, a 20cm thick cement concrete road surface; a 15cm thick grade II crushed stone layer, and a synchronous sewer system design.

The construction time of package No. 05 is 330 days.

The project is invested with the aim of serving the management of traffic works, creating favorable conditions for goods circulation and travel of people in the area; and at the same time helping to protect the foundation and road surface; promoting the potential and advantages of traffic roads, contributing to socio-economic development, ensuring political security and social stability of people on the route.

Some other construction packages worth billions of VND were also implemented in the early days of 2026 in Phu Tho province such as:

In Phuc Yen ward, on January 7, the investor of the Luu Quy An Primary School Renovation and Repair Project, Phuc Yen ward, Phu Tho province also announced an invitation to bid for the Construction and Installation package with a price of nearly 11.9 billion VND.

In Thanh Mieu ward, on January 6, the investor of the Urban Embellishment project to welcome the new year and celebrate the Party and Spring 2026 announced the bidding invitation for Package No. 06: Construction and installation of works with a price of nearly 5.8 billion VND.

In Tam Nong commune, on January 5th, the investor of the project to renovate and upgrade rural roads from Nha Ba Temple road to Tung Son pagoda, Tam Nong commune announced the bidding invitation for Package No. 03: construction of works with a price of more than 9.2 billion VND.

In Bao La commune, on January 5th, the investor of the project to repair and renovate Ngoa hamlet and Den hamlet roads, Mai Hich commune announced the bidding invitation for Package No. 01: Construction and installation of works with a price of nearly 2.5 billion VND.

At the Tan Son Regional Health Center, on January 5th, the investor of the project "Repairing the basement of the parking lot in front of the high-quality clinic and treatment facility", relocating the medical gas pipeline and relocating the 0.4KV low voltage power system announced the bidding invitation for Package No. 03: Construction of the project with a price of nearly 1.5 billion VND.

Tô Công
RELATED NEWS

125 kilometers of Quy Nhon - Pleiku Expressway will be divided into 8 construction packages

|

Gia Lai - The division of expressway project packages must be consistent with the technical nature of the project, geology, terrain, and hydrology.

U23 Vietnam returns home in the arms of fans

|

Hundreds of fans were present at Noi Bai airport to welcome U23 Vietnam home after winning a bronze medal at the 2026 AFC U23 Championship.

Live football U23 Japan vs U23 China in the AFC U23 Championship final

|

Live broadcast of the match between U23 Japan and U23 China in the 2026 AFC U23 Championship final, taking place at 10:00 PM today (January 24).

People release buffaloes and crawl to the edge of the Vinh Hao - Phan Thiet expressway

|

Lam Dong - From the locations where the barbed wire fence was cut, people released buffaloes and cows into the corridor next to the Vinh Hao - Phan Thiet expressway.

It's a bit of a bit of a bit of a bit of a bit of a bit.

Vinh Chau purple onions in season, rural workers have more jobs

|

Can Tho - Vinh Chau is not only famous for its purple onion fields but also creates stable livelihoods for thousands of local workers.

US economy accelerates in 2025, opening a brighter growth period in 2026

|

The US economy recorded strong growth in 2025, GDP broke through in the third quarter and consumption maintained its momentum, creating a positive foundation for the outlook for 2026.

How Thanh Nhan deceived the U23 Korean goalkeeper

|

Striker Thanh Nhan took the decisive penalty to bring home a bronze medal for U23 Vietnam at the 2026 AFC U23 Championship.

Border" beauty: I also love myself and instinctively like chairman My Trinh

|

In "Cafe chieu thu 7", actress Huyen Trang (as My Trinh in "Lan ranh") shared about her career and views on happiness.

It's a bit of a bit of a bit of a bit of a bit of a bit.

Thủ đoạn của doanh nhân để thâu tóm gói thầu hơn 608 tỉ đồng

Quang Việt |

Gói thầu số 17 giá trị ban đầu hơn 700 tỉ đồng, song để được trúng thầu, ông chủ Công ty Hoàng Dân chỉ đạo cấp dưới giảm sâu giá thi công xuống tới hơn 16%.

Cựu lãnh đạo Vicem và thỏa thuận lại quả 5% giá trị gói thầu

Việt Dũng |

Lại quả 5% giá trị gói thầu số 19 cho cựu lãnh đạo Ban Quản lý dự án Vicem khi trúng thầu, lãnh đạo Công ty ECON đã lập khống hợp đồng thuê nhân công, thiết bị.

125 kilometers of Quy Nhon - Pleiku Expressway will be divided into 8 construction packages

THANH TUẤN |

Gia Lai - The division of expressway project packages must be consistent with the technical nature of the project, geology, terrain, and hydrology.