Quang Ninh requests to protect the remaining hills in Bai Chay

Nguyễn Hùng |

Quang Ninh - The People's Committee of Quang Ninh province has just approved the adjustment of the 1/2000 scale planning of sub-area 6 in the wards: Bai Chay, Hung Thang and Ha Khau, Ha Long city.

Zone 6 is planned to build a high-class tourism service and entertainment center, stretching from Ha Khau ward at the intersection between National Highway 18 and Ha Long - Van Don expressway to Hung Thang ward and Bai Chay ward, with a total area of nearly 2,000 hectares.

Of which, the construction land area is 1,299.70ha; the civil land area is 804.04ha; the new residential group land area is 37.10ha; the service - public works land at the unit level is 19.86ha; the green land for public use in the unit is 22.22ha.

The subdivision consists of 4 sub-areas, divided into 3 landscape areas.

In particular, for the Southern coastal urban landscape space: Orient the formation of a coastal urban area with a characteristic shape, enhancing green spaces for the future urban landscape area, especially green spaces opening to the sea from residential areas.

The image of Ha Long Bay is identified as a typical image that needs to be protected and promoted. The urban landscape architectural space is in harmony with the heritage landscape of Ha Long Bay, without negatively affecting Ha Long Bay.

For the space along the hillside: Orient the landscape of the area to be green space for the city. Tightly control the density and elevation, do not disrupt the architectural landscape space along the hillside; you can arrange residential areas and tourism services in the form of points on mountainous areas, avoid affecting forest space, creating clusters of works with views from the sea.

For coastal space: When viewed from the sea, it is recommended to create a harmonious, unified architectural facade with its own identity and highlights. Develop the space around Cua Luc Bay into a space center, an expanded urban connection center. Arrange highlight projects in coastal areas of Bai Chay and Hung Thang.

In particular, in sub-area B, Hung Thang ward, taking Hung Thang hill landscape as the center, protecting the terrain and appearance of the area; limiting the expansion of existing residential areas on the hill. Hung Thang Hill - one of the largest and most beautiful hills in Ha Long City is still intact, and was once assigned to a business to research and build an urban area but was later revoked.

Sub-area D takes Bai Chay hill landscape as the center, protecting the terrain and appearance of the area; limiting the expansion of existing residential areas on the hill.

Regarding the seaport and tourist wharf system, in addition to Ha Long International Passenger Port, in the area between peninsula 1 and peninsula 2, Hung Thang Urban Area is planned to build a tourist wharf.

Nguyễn Hùng
TIN LIÊN QUAN

Building a public toilet for over 4.5 billion VND in the middle of Bai Chay

|

Quang Ninh - To better serve tourists, Ha Long City has just invested in building an additional public toilet in the center of Bai Chay Tourist Area.

Architectural management, protecting the view of Bai Tho mountain and Bai Chay bridge

|

Quang Ninh - The People's Council of Quang Ninh province has just passed a Resolution on the architectural management regulations of 13 urban areas in Quang Ninh, with special emphasis on Ha Long.

Strong earthquake in Tonga just a few days after Myanmar earthquake

|

A 7.1-magnitude earthquake near Tonga prompted an initial Tsunami warning but was later lifted.

The Cong Viettel beat Hoang Anh Gia Lai to advance to the semi-finals of the National Cup

|

On the evening of March 30, The Cong Viettel defeated Hoang Anh Gia Lai with a score of 2-0 to win a ticket to the semi-finals of the 2024-2025 National Cup.

Updated gold price at the end of session 30.3: Profit despite surfing

|

Updated gold price at the end of the session on March 30: The difference between buying and selling is at a high level, investors still make a profit even if investing in the short term.

The army and police set out to support overcoming the consequences of the earthquake

|

The delegation of officers and soldiers of the Ministry of National Defense and the Ministry of Public Security have set out to support Myanmar in overcoming the consequences of the earthquake.

Waiting for the end of living with wastewater in industrial parks

|

Quang Tri - The lives of people living next to industrial parks have been disrupted by wastewater. Meanwhile, the wastewater treatment plant has not yet come into operation

Soc Trang informs about selecting people when arranging commune level

|

Soc Trang - Soc Trang province will arrange and assign according to the spirit of "from selecting people", retaining capable officials.

Building a public toilet for over 4.5 billion VND in the middle of Bai Chay

Nguyễn Hùng |

Quang Ninh - To better serve tourists, Ha Long City has just invested in building an additional public toilet in the center of Bai Chay Tourist Area.

Architectural management, protecting the view of Bai Tho mountain and Bai Chay bridge

Nguyễn Hùng |

Quang Ninh - The People's Council of Quang Ninh province has just passed a Resolution on the architectural management regulations of 13 urban areas in Quang Ninh, with special emphasis on Ha Long.

Dành quỹ đất đẹp ở Bãi Cháy để xây dựng Nhà hát Quảng Ninh

Nguyễn Hùng |

Quảng Ninh - Tại hội nghị nghe và cho ý kiến về quy hoạch các phân khu của TP.Hạ Long hôm nay (23.4), Ban Thường vụ Tỉnh ủy Quảng Ninh đã thống nhất dành quỹ đất thỏa đáng ở vị trí phù hợp tại phường Bãi Cháy để xây dựng Nhà hát tỉnh Quảng Ninh.