Ho Chi Minh City does not organize architectural competitions for the Ben Thanh - Can Gio Metro line

MINH QUÂN |

Ho Chi Minh City - The Ben Thanh - Can Gio metro line is more than 54 km long, with a total investment of over 102,000 billion VND, and will not organize architectural design competitions.

Ho Chi Minh City People's Committee has just issued documents related to projects under the Ben Thanh - Can Gio railway line project.

Considering the proposal of the Department of Planning and Architecture, the Ho Chi Minh City People's Committee approved not to conduct architectural selection for works belonging to the route plan dossier, and the location of works according to the route of the Ben Thanh - Can Gio Metro project.

The non-organization of the competitive examination is carried out on the principle of ensuring the requirements for history, culture and aesthetics of the project, in accordance with the provisions of Article 28 of the Railway Law and the Investment Law of 2025.

The Ho Chi Minh City People's Committee assigned the Department of Planning and Architecture to preside over and coordinate with investors and related units to unify the design plan, summarize reports, and submit them to the Ho Chi Minh City People's Committee for consideration and decision.

Phoi canh nha ga Metro Ben Thanh - Can Gio.  Anh: Vingroup
Perspective of Ben Thanh - Can Gio Metro station. Photo: Vingroup

Previously, the Ben Thanh - Can Gio Metro project was grounded on December 19, 2025, deployed in the form of a BT contract (build - transfer).

The metro line is more than 54 km long, built with a standard double track gauge of 1,435 mm, operated by a modern electrified system.

The project uses the Velaro Novo ship - Siemens Mobility's newest and most modern high-speed ship, with a maximum design speed of 350 km/h, aiming to reshape high-speed transport standards in Vietnam.

The starting point of the route is located in the Ben Thanh area (Ben Thanh ward), the ending point is in a land area of about 39 hectares, bordering Can Gio sea encroachment tourist urban area (Can Gio commune).

The metro line passes through wards and communes including: Ben Thanh, Khanh Hoi, Xom Chieu, Tan Thuan, Tan My, Nha Be, Binh Khanh, An Thoi Dong and Can Gio.

In phase 1, the project will build two main stations, Ben Thanh and Can Gio. The depot and operating center (OCC) are expected to be located in the Can Gio area.

The metro line is expected to operate 6 regular trains and 1 reserve train, with a total of 56 cars. Daily operating hours are from 6 am to 11 pm, frequency 20 minutes/trip; each hour there are 3 pairs of trains running in two directions.

The total travel time of the entire route is only about 20.3 minutes, significantly shortening travel time between the center of Ho Chi Minh City and the Can Gio coastal area.

The project has a preliminary total investment of about 102,430 billion VND, excluding site clearance costs of about 12,784 billion VND allocated by the state budget.

According to the Ho Chi Minh City Department of Construction, the Ben Thanh - Can Gio Metro project is expected to be constructed from March 2026, completed in 2028.

Along with the Ben Thanh - Can Gio Metro line, Ho Chi Minh City has started the Can Gio bridge project and is preparing to deploy the Can Gio - Vung Tau sea-crossing road. Thanks to that, the Southern area of Ho Chi Minh City is gradually forming a strategic transport infrastructure network, connecting synchronously between roads, urban railways and inter-regional traffic.

When these projects are completed, Can Gio will not only end the "oasis" of transportation that has lasted for many years, but also stand before the opportunity to make strong breakthroughs in economy, tourism and urban development, gradually becoming an important sea gateway of Ho Chi Minh City in the future.

MINH QUÂN
RELATED NEWS

After Metro Line 2, Ho Chi Minh City is about to start construction of 5 more metro lines in 2026

|

Ho Chi Minh City - After starting Metro Line 2 (Ben Thanh - Tham Luong), Ho Chi Minh City plans to start construction of 5 more metro lines in 2026, completed in 2030.

Ho Chi Minh City starts construction of Metro Line 2 worth more than 55,000 billion VND, passing through 14 wards

|

Ho Chi Minh City - On the morning of January 15, the Ho Chi Minh City People's Committee held a groundbreaking ceremony for Metro Line 2 project (Ben Thanh - Tham Luong), connecting the central area with the Northwest gateway of the City.

Ben Thanh - Can Gio Metro broke ground, expected to be completed by the end of 2028

|

Ho Chi Minh City - The Ben Thanh - Can Gio Metro Line is more than 54 km long, with a total capital of more than VND102,000 billion, expected to be completed in the fourth quarter of 2028.

E-mail congratulating General Secretary of the 14th Central Committee of the Communist Party of Vietnam To Lam

|

On the occasion of Comrade To Lam being re-elected by the 14th Central Executive Committee of the Communist Party of Vietnam as General Secretary of the 14th Central Executive Committee of the Communist Party of Vietnam, General Secretary of the Central Executive Committee of the Lao People's Revolutionary Party, President of the Lao People's Democratic Republic Thongloun Sisoulith, General Secretary of the Central Executive Committee of the Communist Party of China, President of the People's Republic of China Xi Jinping, and President of the Cambodian People's Party Hun Sen, they sent congratulatory messages to Comrade General Secretary To Lam.

Hanoi fireworks displays on an unprecedented scale: People are flocking to My Dinh

|

Hanoi - Many people are flocking to the My Dinh Stadium area to watch the unprecedented-scale fireworks display, celebrating the success of the 14th Party Congress.

Land use fees are still a major bottleneck in the real estate market

|

Real estate investors are under great pressure from both project development costs and increased land use fees.

Securities continue to face profit-taking pressure from bluechip stocks

|

The Vietnamese stock market could not regain its green color in the last trading session of the week when investors put unexpected caution first.

Comrade Tran Sy Thanh elected as Chairman of the 14th Central Inspection Committee

|

The 14th Central Executive Committee of the Party elected comrade Tran Sy Thanh to hold the position of Chairman of the 14th Central Inspection Committee.

After Metro Line 2, Ho Chi Minh City is about to start construction of 5 more metro lines in 2026

MINH QUÂN |

Ho Chi Minh City - After starting Metro Line 2 (Ben Thanh - Tham Luong), Ho Chi Minh City plans to start construction of 5 more metro lines in 2026, completed in 2030.

Ho Chi Minh City starts construction of Metro Line 2 worth more than 55,000 billion VND, passing through 14 wards

MINH QUÂN |

Ho Chi Minh City - On the morning of January 15, the Ho Chi Minh City People's Committee held a groundbreaking ceremony for Metro Line 2 project (Ben Thanh - Tham Luong), connecting the central area with the Northwest gateway of the City.

Ben Thanh - Can Gio Metro broke ground, expected to be completed by the end of 2028

MINH QUÂN |

Ho Chi Minh City - The Ben Thanh - Can Gio Metro Line is more than 54 km long, with a total capital of more than VND102,000 billion, expected to be completed in the fourth quarter of 2028.