Dak Lak prepares resettlement areas for 2 projects worth over VND20,000 billion

PHAN TUẤN |

Dak Lak - The Provincial People's Committee has just issued a policy to prepare a resettlement fund to serve the implementation of the Hoa Tam Industrial Park and Bai Goc Port construction project.

Recently, Hoa Phat Group has launched 2 projects of Hoa Tam Industrial Park and Bai Goc port.

Of which, Hoa Tam Industrial Park has a land use scale of nearly 492 hectares, with a total investment of more than VND 4,188 billion.

Bai Goc Port has a scale of 12 wharves, capable of receiving ships with a capacity of up to 220,000 DWT with a total investment of about VND 16,300 billion.

According to the Phu Yen Economic Zone Management Board, the Dak Lak Provincial People's Committee has a policy to prepare resettlement areas to serve the implementation of the investment project to build and operate the infrastructure of Hoa Tam Industrial Park - Phase 1 and the investment project to build Bai Goc port.

Accordingly, the Dak Lak Provincial People's Committee has agreed to use existing resettlement areas including: 215 lots in Phu Lac Resettlement Area, about 140 lots in My Hoa Resettlement Area and 492 lots in Hoa Tam Resettlement Area.

The Provincial People's Committee also assigned the Phu Yen Economic Zone Management Board to develop an investment policy for 3 resettlement areas combined with residential areas, including technical infrastructure projects for resettlement areas to serve the relocation of households affected by the implementation of the construction of the Nam Phu Yen Economic Zone.

Tho Lam resettlement area technical infrastructure project. Technical infrastructure project for new residential area and Hoa Tam resettlement area (phase 2).

PHAN TUẤN
RELATED NEWS

After the merger, Dak Lak was assigned 9,230 civil servant positions in 2025

|

Dak Lak - After merging provinces, localities will be assigned 9,230 civil servant positions in 2025.

Accelerating the construction of infrastructure in Nam Pleiku Industrial Park

|

Gia Lai - After many years of sluggishness and problems with procedures, Nam Pleiku Industrial Park is currently being required to speed up the project's progress.

Ho Chi Minh City Party Secretary Tran Luu Quang outlines four principles for selecting officials

|

HCMC - Ho Chi Minh City Party Secretary Tran Luu Quang said that he will select cadres based on 4 principles: selecting people for work, listening, democratically and not conservatively.

Ho Chi Minh City sidewalks are still encroached, the Department of Construction must issue a document for the second time

|

HCMC - The situation of encroachment on sidewalks is still common on many central streets of the city, causing loss of urban beauty and many potential dangers to pedestrians.

Temporarily suspending the duties and powers of National Assembly deputies to Mr. Tran Van Thuc

|

Mr. Tran Van Thuc was temporarily suspended by the National Assembly Standing Committee from performing the duties and powers of the 15th National Assembly delegate.

Returning to the uptrend, stocks approach the threshold of 1,700 points

|

The positive reaction of pillar stocks when the index retreated to the support zone showed that the stock market prospects recovered and the 1,700 point mark was still feasible.

"Daring" TBM to dig a tunnel for the Nhon - Hanoi Railway Station metro has arrived at Cat Linh station

|

Hanoi - The No. 2 TBM digging the Nhon - Hanoi Railway Station metro tunnel arrived at S10 Station - Cat Linh Station this morning (September 15).

From digital transformation to green transformation, a series of dual solutions to protect the environment

|

Reducing pollution, developing green transport infrastructure and applying digital technology will create a breakthrough for urban environmental protection.

After the merger, Dak Lak was assigned 9,230 civil servant positions in 2025

BẢO TRUNG |

Dak Lak - After merging provinces, localities will be assigned 9,230 civil servant positions in 2025.

Bộ Xây dựng trả lời về kiến nghị làm đường nội bộ 1 xã ở Đắk Lắk.

Xuyên Đông |

Bộ Xây dựng vừa trả lời cử tri xã Pơng Drang, tỉnh Đắk Lắk khi đề xuất làm đường nội bộ.

Accelerating the construction of infrastructure in Nam Pleiku Industrial Park

THANH TUẤN |

Gia Lai - After many years of sluggishness and problems with procedures, Nam Pleiku Industrial Park is currently being required to speed up the project's progress.