Hanoi adjusts the planning of Tay Ho Tay urban area

KHÁNH AN |

Hanoi adjusts the central area of Tay Ho Tay Urban Area in the direction of reorganizing the site of the landscape architectural space and the underground construction area.

On February 20, the Hanoi People's Committee issued a decision approving the project to locally adjust the detailed planning of the central area of Tay Ho Tay Urban Area, scale 1/500 at lot B2-CC2 (the part of the landscape architectural space organization and the underground construction area) in Xuan Tao ward, Bac Tu Liem district.

The location of the land lot with symbol B2-CC2 has a total area of about 8,731m2, located in the central area of Tay Ho Tay Urban Area (phase 1). The North borders the existing road with a cross-section of B= 60.5m; the South borders the existing road with a cross-section of B= 15m; the East borders the existing road with a cross-section of B= 24m; the West borders the land lot marked B2-CC1.

Accordingly, locally adjust the detailed planning of the central area of Tay Ho Tay Urban Area, scale 1/500 at lot B2-CC2 in the direction of reorganizing the site of the landscape architectural space and the underground construction area; specifically determine the functional function of the project and the line of use, in accordance with the needs of exploitation, operation and management; create a project with beautiful, modern architectural form, harmonizing the landscape architectural space of the Tay Ho Tay Urban Area.

This is the legal basis for investors to establish construction investment projects and authorities at all levels to manage architectural planning and construction investment according to approved planning.

KHÁNH AN
RELATED NEWS

Hanoi reclaims land for the Central Area project of Tay Ho Tay Urban Area

|

Hanoi - The city has just decided to reclaim 15,087 square meters of land at plot B1CC4 of the Tay Ho Tay Urban Area Central Area project (Bac Tu Liem district).

Types of housing projects are exempt from construction permits from July 1st

|

From July 1st, individual houses with a scale of less than 7 floors with a total floor area of less than 500m2 are eligible for exemption from construction permits.

Launching the book 80 years of the Vietnamese National Assembly - Historical Imprints

|

The book "80 years of the National Assembly of Vietnam - Historical Imprints" recreating the 80-year journey of the National Assembly of Vietnam has just been officially launched.

Coach Ruben Amorim sacked by Man United

|

British media simultaneously reported that Man United has decided to sack coach Ruben Amorim.

Hanoi to build 3 more sections of Ring Road 2.5, investment capital of 8,402 billion VND

|

Hanoi plans to build 3 sections of Ring Road 2.5 with a length of 2.26km in 2026, with a total investment of about 8,402 billion VND.

Venezuela reveals the fate of President Maduro's security team

|

Most of the members of Venezuelan President Nicolas Maduro's security team have been killed.

Hanoi reclaims land for the Central Area project of Tay Ho Tay Urban Area

KHÁNH AN |

Hanoi - The city has just decided to reclaim 15,087 square meters of land at plot B1CC4 of the Tay Ho Tay Urban Area Central Area project (Bac Tu Liem district).

Thêm dự án nhà ở cao cấp ở khu đô thị Tây Hồ Tây

Minh Hạnh |

Hà Nội – Theo kế hoạch điều chỉnh sử dụng đất năm 2024 của Ủy ban Nhân dân (UBND) TP Hà Nội, quận Bắc Từ Liêm sẽ có thêm một dự án nhà ở cao cấp.

Hà Nội điều chỉnh quy hoạch khu vực trung tâm khu đô thị Tây Hồ Tây

KHÁNH AN |

Phó Chủ tịch UBND TP Hà Nội Dương Đức Tuấn vừa ký ban hành quyết định về việc phê duyệt đồ án Điều chỉnh cục bộ Quy hoạch chi tiết khu vực trung tâm khu đô thị Tây Hồ Tây, tỷ lệ 1/500 tại lô đất H2CC2.