Ho Chi Minh City adjusts Thu Thiem planning to build a new administrative center, 99-story tower

MINH QUÂN |

Ho Chi Minh City adjusts the planning of Thu Thiem to build a new Political - Administrative Center, a 99-story financial tower, and adjusts the location of the Children's Palace and the Opera House.

Ho Chi Minh City People's Committee has just issued a decision approving the partial adjustment of the 1/2000 scale zoning plan of Sub-zone No. 1 in Thu Thiem New Urban Area.

The total area of the adjusted area is about 50.41 ha, including two areas: area 1 is about 36.04 ha and area 2 is about 14.37 ha.

The adjustment aims to rearrange key projects in Thu Thiem urban area such as the Political - Administrative Center, Children's Palace and Theater - Performing Arts - Conference Center. This plan is also in line with the development orientation of Ho Chi Minh City after implementing administrative boundaries arrangement and merger.

According to the plan, this area will develop into a Political - Administrative Center, a financial, commercial, service, and cultural center of Ho Chi Minh City and the region, with an international position; and at the same time a mixed urban area associated with the inundated ecological landscape along the Saigon River.

Building a new administrative center to serve 6,000 officials

The new Political - Administrative Center of Ho Chi Minh City is built in Central Lake Park, over 33 hectares wide, located in the core area of Thu Thiem New Urban Area.

The Political - Administrative Center area alone has an area of about 7.84 hectares, planned to be a maximum of 30 floors along To Huu Avenue.

Khu đất rộng hơn 33 ha, trong đó xây Trung tâm Chính trị - Hành chính rộng 7,84 ha. Ảnh: Anh Tú
The land area is over 33 hectares, of which the Political - Administrative Center is built with an area of 7.84 hectares. Photo: Anh Tu
Phối cảnh không gian kiến trúc Trung tâm Chính trị - Hành chính TPHCM.
Perspective of architectural space of the Ho Chi Minh City Political - Administrative Center.

The new Political - Administrative Center can meet the regular work needs of about 6,000 officials, civil servants, and public employees.

Every day, this place is expected to receive about 1,500 - 2,000 people and businesses through the modern "one-stop shop" system.

Ho Chi Minh City is expected to start construction of a new Political - Administrative Center on April 30, 2026.

Adjusting the location of the Children's Palace and the Opera House

Ho Chi Minh City Children's Palace (currently deployed in the Central Lake Park land area) will be converted to the block code HC-5. The current Children's Palace construction land area will be converted into a green park and water surface.

Khu đất rộng hơn 33 ha, trong đó xây Trung tâm Chính trị - Hành chính rộng 7,84 ha. Ảnh: Anh Tú
Ho Chi Minh City Children's Palace (location that has been leveled) will be moved to another location to build the Central Political - Administrative - Cultural Area and Central Lake Park. Photo: Anh Tu

The city also swapped the location of the Ho Chi Minh City Symphony Orchestra, Music and Ballet Theater from the Ba Son bridgehead area to the adjacent position of the Political - Administrative Center. The project will be developed into a Theater - Performing Arts - Conference Center with a scale of about 2,000 seats, forming a multi-functional public project complex including administration, politics and culture.

The theater land at the old location will be converted into a park and square, connected to the central square and riverside park, creating a continuous open space along the Saigon River.

Building a 99-story tower 500 m high

In parallel with the administrative area, the planning of the core area of the International Financial Center in Thu Thiem is also adjusted to increase the height of the building.

There are 9 land plots for the construction of the Vietnam International Finance Center in Ho Chi Minh City (symbols from 1. K1. 2. HH to 1. K1. 10. HH) that will be maximized height.

Vị trí khu đất dự kiến xây tháp 99 tầng tại Thủ Thiêm. Ảnh: Anh Tú
Location of the land plot expected to build a 99-story tower in Thu Thiem. Photo: Anh Tu

The most notable is land plot 1. K1. 8. HH with an area of about 1.26 ha. This land plot has increased the height of the building from a maximum of 30 floors to 99 floors, with an expected height of about 500 m, instead of 120 m as before.

When implemented, this will be one of the tallest buildings in Vietnam, playing the role of architectural highlight and new symbol of the Financial Center in Thu Thiem.

MINH QUÂN
RELATED NEWS

Current status of land for the upcoming 99-story tower, the tallest in Vietnam

|

Ho Chi Minh City - The core land of Thu Thiem proposed for building a 99-story tower (500 m high) is still a deserted swamp.

Reasons for Ho Chi Minh City to relocate key administrative agencies to Thu Thiem

|

Ho Chi Minh City builds a new Political - Administrative Center in Thu Thiem to reduce the center area and meet the management requirements of a 14 million-population megacity.

Ho Chi Minh City urgently builds a new Political - Administrative Center for 6,000 officials

|

Ho Chi Minh City adjusts more than 128 hectares in Thu Thiem Urban Area to build a new Political - Administrative Center, serving 6,000 officials and thousands of people every day.

Nearly 130,000 students register for the 10th grade entrance exam in Hanoi

|

Nearly 130,000 Hanoi students registered to participate in the 10th grade high school (THPT) entrance exam for the 2026-2027 school year.

Landfill in a residential area in Can Tho stops operating, pollution concerns still exist

|

Can Tho - The landfill in Thoi Nhut 2 residential area has stopped operating, but the situation of illegal dumping of garbage and the risk of pollution still make people uneasy.

US fires naval artillery, pierces Iranian ship engine room

|

The cargo ship Touska flying the Iranian flag was intercepted by the US destroyer USS Spruance while trying to break through the US Navy's blockade.

Police major dies in accident on Noi Bai - Lao Cai expressway

|

The victim who died in the traffic accident on the Noi Bai - Lao Cai expressway is a police major working at Lao Cai Provincial Police.

Forecast of thunderstorms in provinces and cities due to cold air, with heavy rain in some places over 70mm

|

According to the meteorological agency, it is forecast that today, April 20, the North, Thanh Hoa and Nghe An will have rain due to the impact of a weak cold air mass.

Current status of land for the upcoming 99-story tower, the tallest in Vietnam

Bảo Tú |

Ho Chi Minh City - The core land of Thu Thiem proposed for building a 99-story tower (500 m high) is still a deserted swamp.

Reasons for Ho Chi Minh City to relocate key administrative agencies to Thu Thiem

MINH QUÂN |

Ho Chi Minh City builds a new Political - Administrative Center in Thu Thiem to reduce the center area and meet the management requirements of a 14 million-population megacity.

Ho Chi Minh City urgently builds a new Political - Administrative Center for 6,000 officials

MINH QUÂN |

Ho Chi Minh City adjusts more than 128 hectares in Thu Thiem Urban Area to build a new Political - Administrative Center, serving 6,000 officials and thousands of people every day.