Opening for more than two weeks, two schools in Ca Mau have no students

NHẬT HỒ |

Ca Mau - Two schools in Buu 2 Hamlet, Dong Hai Commune, Ca Mau Province have no students despite investing tens of billions of VND.

These are Vo Van Kiet Primary School, Huong Duong Kindergarten, Buu 2 Hamlet Cultural House and technical infrastructure works under the Residential Area and Resettlement Project out of the forest of Bac Lieu province (old).

This is a project that Bac Lieu province decided to invest in 2014 in Bac Lieu city, Hoa Binh district, Dong Hai (old). The two locations of the school and the Cultural House of Buu 2 Hamlet were completed in 2022.

Khu Dan cu va tai dinh cu di dan ra khoi rung tai ap Buu 2, xa Dong Hai. Anh: Nhat Ho
Resettlement area and resettlement of people from the forest in Buu 2 Hamlet, Dong Hai Commune. Photo: Nhat Ho

According to the assessment of the People's Committee of Dong Hai commune, the above projects have been fully invested in since 2022, but have not been effective due to their location far from residential areas (more than 4km), so it is difficult to encourage parents to send students to school.

Truong tieu hoc Vo Van Kiet duoc xay dung chac chan, be the, hoan thanh tu nam 2022 nhung khong co hoc sinh. Anh: Nhat Ho
Vo Van Kiet Primary School was built solidly and majestically, completed in 2022 but had no students. Photo: Nhat Ho

Mr. Huynh Van Doi, 80 years old, Buu 2 hamlet, Dong Hai commune, said: The state has built this school for a long time, but no one comes here to study because the surrounding area is full of shrimp ponds, too far from the people.

Nam canh ben la Truong mau giao Huong Duong cung duoc xay dung be the voi day du cong nang. Anh: Nhat Ho
Located next to it is Huong Duong Kindergarten, which is also built majestically with full functions. Photo: Nhat Ho

Huong Duong Kindergarten is built with two blocks of houses, designed with one floor, including: block of 4 classrooms and multi-purpose building with a total area of 3,500m2 (70m x 50m). Of which, the construction area is 300.69m2 and the campus area is 2,624m2.

Do da 3 nam khong don hoc sinh nao nen san truong co da moc nhieu noi. Anh: Nhat Ho
After 3 years of not welcoming any students, the schoolyard has grown grass in many places. Photo: Nhat Ho

Vo Van Kiet Primary School is built with two blocks of houses, designed with 1 ground floor and 1 upper floor, including: Multi-purpose school building and the main hall block. Total area of 3,700m2 (74m x 50m). Of which, the construction area is 573.84m2, the campus area is 3,126.16m2.

The Cultural House and the water supply station have a total area of 1,500m2. Of which, the construction area of the Cultural House is 216m2; the station and water supply system is 300m2, the campus area is 984m2.

Nha van hoa bo hoang 3 nam nen ngoai san co da moc len. Anh: Nhat Ho
The cultural house has been abandoned for 3 years, so it has sprung up on the field. Photo: Nhat Ho

The project to build 2 schools and a Cultural House is part of the project of the Residential Area and Resettlement of Migration People out of the Forest. The total investment of the 3 projects is nearly 50 billion VND. Due to not using them for a long time, grass grows around them, but the classrooms are still very good.

Co day moc nhieu noi trong khuon vien truong, khong anh huong den ket cau cua khoi nha. Anh: Nhat Ho
Weeds grow in many places in the school grounds, not affecting the structure of the building. Photo: Nhat Ho

The People's Committee of Dong Hai commune, Ca Mau province said that it has submitted a document requesting the policy of converting all the functions of the two schools and the above-mentioned Cultural House into the commune's administrative center.

On September 14, Vice Chairman of the People's Committee of Ca Mau province Nguyen Minh Luan and departments and branches inspected the site. Vice Chairman of Ca Mau Provincial People's Committee Nguyen Minh Luan suggested that Dong Hai Commune People's Committee accept the opinions of departments and branches to review and have reports to assess the needs of using Buu 2 Hamlet Resettlement Area as a basis for proposing to change the functions of the works; at the same time, have a plan to arrange and arrange working headquarters after converting functions accordingly, report to the Provincial People's Committee for consideration and decision as soon as possible.

Truong tieu hoc Vo Van Kiet, ap Buu 2, xa Dong Hai, tinh Ca Mau kha be the du 3 nam chua don bat cu hoc sinh nao. Anh: Nhat Ho
Vo Van Kiet Primary School, Buu 2 Hamlet, Dong Hai Commune, Ca Mau Province is quite majestic despite not welcoming any students for 3 years. Photo: Nhat Ho

Based on the proposal of the People's Committee of the commune, Vice Chairman of the People's Committee of Ca Mau province Nguyen Minh Luan requested the Department of Agriculture and Environment, the Department of Finance, and the Department of Construction to review legal regulations and the practical situation of the locality, as a basis for advising and proposing to the Provincial People's Committee to consider and handle in accordance with regulations, in order to promote the effectiveness of management and use of public assets, preventing loss, waste, and negativity.

NHẬT HỒ
RELATED NEWS

Ca Mau leaders strongly direct the slow disbursement of public investment capital

|

Ca Mau - More than VND 8,226 billion in public investment capital must be disbursed in the remaining months of 2025, but many key projects are still sluggish and behind schedule.

Ca Mau fosters Khmer language for officers and professional soldiers

|

Ca Mau - Students gradually become fluent in their studies, aiming to communicate directly in the Khmer language in their later study and work activities.

High tide, many sections of National Highway 1A through Ca Mau are deeply flooded

|

Ca Mau - High tides caused National Highway 1A through Ca Mau to be flooded in many places, making traffic difficult.

Ca Mau people donate flood prevention plans to receive thank you letters from Can Tho government

|

Can Tho - Can Tho City has received more than 50 creative flood prevention solutions, some of which are macro-level.

Communes and wards in Ca Mau choose their own characteristics to make a breakthrough

|

Ca Mau - Currently, all 64/64 communes and wards have held Party Congresses. The good news is that some communes and wards have chosen their own characteristics to break through and rise up in the next term.

Ensuring clean toilets and clean water for Ca Mau students

|

In the new school year, Ca Mau province has implemented a project to build new and repair public school toilets in Ca Mau province at the same time as a project to teach 2 sessions/day.

Nearly 1,000 billion VND for teaching 2 sessions/day, boarding in Ca Mau

|

Ca Mau - The total budget for implementing the Project of teaching 2 sessions/day, boarding for public preschool and general education in the province is up to nearly 1,000 billion VND.

Dancing head-on with a car, a man riding a bicycle died on Nhat Tan bridge

|

Hanoi - A man riding a bicycle in the wrong direction on Nhat Tan bridge collided with a car, resulting in his death.

Ca Mau leaders strongly direct the slow disbursement of public investment capital

NHẬT HỒ |

Ca Mau - More than VND 8,226 billion in public investment capital must be disbursed in the remaining months of 2025, but many key projects are still sluggish and behind schedule.

Ca Mau fosters Khmer language for officers and professional soldiers

NHẬT HỒ |

Ca Mau - Students gradually become fluent in their studies, aiming to communicate directly in the Khmer language in their later study and work activities.

Xã, phường ở Cà Mau kêu khó vì các dự án gần 900 tỉ đồng chậm giải ngân

NHẬT HỒ |

Cà Mau - Đó là 3 dự án do Ban Quản lý dự án đầu tư xây dựng các công trình giao thông Bạc Liêu làm chủ đầu tư.

High tide, many sections of National Highway 1A through Ca Mau are deeply flooded

NHẬT HỒ |

Ca Mau - High tides caused National Highway 1A through Ca Mau to be flooded in many places, making traffic difficult.

Ca Mau people donate flood prevention plans to receive thank you letters from Can Tho government

PHƯƠNG ANH |

Can Tho - Can Tho City has received more than 50 creative flood prevention solutions, some of which are macro-level.

Communes and wards in Ca Mau choose their own characteristics to make a breakthrough

NHẬT HỒ |

Ca Mau - Currently, all 64/64 communes and wards have held Party Congresses. The good news is that some communes and wards have chosen their own characteristics to break through and rise up in the next term.

Ensuring clean toilets and clean water for Ca Mau students

NHẬT HỒ - PHƯƠNG ANH |

In the new school year, Ca Mau province has implemented a project to build new and repair public school toilets in Ca Mau province at the same time as a project to teach 2 sessions/day.

Nearly 1,000 billion VND for teaching 2 sessions/day, boarding in Ca Mau

NHẬT HỒ |

Ca Mau - The total budget for implementing the Project of teaching 2 sessions/day, boarding for public preschool and general education in the province is up to nearly 1,000 billion VND.