The railway project worth more than $8 billion was submitted to the National Assembly in February

Xuyên Đông |

According to information from the Ministry of Transport, the Lao Cai - Hanoi - Hai Phong railway project with more than 8 billion USD will be submitted to the National Assembly in February 2025.

The National Assembly delegation led by Mr. Nguyen Minh Son - Deputy Chairman of the National Assembly's Economic Committee - recently met with localities about the investment project to build the Lao Cai - Hanoi - Hai Phong railway line.

On February 4-5, 2025, the National Assembly's Economic Committee chaired the coordination with the Ethnic Council and the National Assembly Committees conducted a field survey in localities to serve the appraisal of the investment project to build the Lao Cai - Hanoi - Hai Phong railway line. If eligible, this project will be presented at the extraordinary session of the National Assembly from February 12, 2025.

Through the survey and opinions of the locality, delegates all agreed with the necessity of investing in the project to concretize the policies, Resolutions, Conclusions of the Politburo and deploy plans, strengthen regional connectivity, growth poles, spread, open up new development space, and meet the needs of socio-economic development associated with national defense and security.

Sharing about the project, Deputy Minister of Transport Nguyen Danh Huy said that the early investment and completion of this strategic railway line is to realize the policies and orientations of the Party, Resolutions, Concluding the Politburo and implementing related plans.

The invested railway line will also help realize strategic cooperation agreements and strengthen international connections. The existing 1,000mm railway line was built during the French colonial period, while the railways of other countries serving international transport train runs were 1,435mm.

After building a new route, imported goods can be transported by intervention ships to Europe, reducing transportation costs and logistics costs.

Regarding transportation needs, according to Deputy Minister Huy, there are currently 3 transportation methods on this route: Roads, railways, and inland waterways. However, according to forecasts, although the existing road, waterway and railway capacity has been fully exploited, by 2040 it will not be able to meet transportation needs, especially freight transport.

Therefore, it is necessary to build a new mode of transport, which is a 1,435mm gauge railway, because the cost is cheaper, safer, the land area is less occupied and is environmentally friendly. The investment in the new route also creates a construction market, thereby affecting economic growth.

"The 1,435mm gauge railway, electrification is a sustainable, modern, friendly mode of transport, contributing to reducing traffic accidents, environmental pollution, responding to climate change and contributing to ensuring national defense and security", Deputy Minister Huy emphasized.

According to the project's pre-feasibility study report, the entire railway line is about 400 km long with 36 stations, passing through 9 provinces and cities. In which, the section through Hai Phong includes the main route, 46.1 km long and 2 branch routes, 20.5 km long. Design speed of the main route is 160 km/h; branch route 80 km/h. The total estimated investment capital is more than 8 billion USD.

Xuyên Đông
RELATED NEWS

Special mechanism helps shorten procedures for urban railway construction

|

The implementation of investment in urban railway lines in Hanoi and Ho Chi Minh City is still slow and has not achieved the target.

Expectations of the North-South high-speed railway project to help the country grow

|

One of the “mega-projects” expected to contribute to bringing the country into the era of national development is the North-South high-speed railway. The project has been officially approved by the National Assembly, carrying with it the faith and hope of many generations of Vietnamese people.

Quickly restore infrastructure in Thai Nguyen after historic floods

|

Localities in Thai Nguyen that were heavily affected by the recent historic floods are urgently overcoming the damage and stabilizing people's lives.

Appointment and election of personnel in Hanoi, Ho Chi Minh City, Thanh Hoa, Khanh Hoa

|

Son La, Khanh Hoa, Thanh Hoa, Hanoi, Ho Chi Minh City... have just implemented decisions to elect, transfer, and appoint personnel last week (from October 13-18).

Young people love gifts on October 20 that are affordable and usable every day

|

In Hanoi, the Vietnamese Women's Day gift market on October 20 recorded a trend of shifting from buying flowers and elaborate gifts to simple, practical gifts.

Admiring 200-year-old banyan trees, the canopy intertwined with each other like the gate of the village in Hai Phong

|

Hai Phong - After 2 centuries, the heritage banyan tree in Phu Thai commune is still green and majestic, like a protective arm for the people here.

Hanoi's largest flower village lost everything due to storms, farmers look forward to the Tet crop

|

Hanoi - The efforts and capital of hundreds of households in Tay Tuu flower village have been washed away by water after historic storms.

Special mechanism helps shorten procedures for urban railway construction

TRÍ MINH |

The implementation of investment in urban railway lines in Hanoi and Ho Chi Minh City is still slow and has not achieved the target.

Expectations of the North-South high-speed railway project to help the country grow

Hiếu Anh |

One of the “mega-projects” expected to contribute to bringing the country into the era of national development is the North-South high-speed railway. The project has been officially approved by the National Assembly, carrying with it the faith and hope of many generations of Vietnamese people.

Chi tiết 15 tuyến đường sắt đô thị Hà Nội dự kiến xây dựng

KHÁNH AN |

Hà Nội - Hiện tại, thành phố đang có 2 tuyến đường sắt đô thị và đang phấn đấu đến năm 2045 có 15 tuyến với tổng chiều dài 616,9km.