The railway project worth more than $8 billion was submitted to the National Assembly in February

Xuyên Đông |

According to information from the Ministry of Transport, the Lao Cai - Hanoi - Hai Phong railway project with more than 8 billion USD will be submitted to the National Assembly in February 2025.

The National Assembly delegation led by Mr. Nguyen Minh Son - Deputy Chairman of the National Assembly's Economic Committee - recently met with localities about the investment project to build the Lao Cai - Hanoi - Hai Phong railway line.

On February 4-5, 2025, the National Assembly's Economic Committee chaired the coordination with the Ethnic Council and the National Assembly Committees conducted a field survey in localities to serve the appraisal of the investment project to build the Lao Cai - Hanoi - Hai Phong railway line. If eligible, this project will be presented at the extraordinary session of the National Assembly from February 12, 2025.

Through the survey and opinions of the locality, delegates all agreed with the necessity of investing in the project to concretize the policies, Resolutions, Conclusions of the Politburo and deploy plans, strengthen regional connectivity, growth poles, spread, open up new development space, and meet the needs of socio-economic development associated with national defense and security.

Sharing about the project, Deputy Minister of Transport Nguyen Danh Huy said that the early investment and completion of this strategic railway line is to realize the policies and orientations of the Party, Resolutions, Concluding the Politburo and implementing related plans.

The invested railway line will also help realize strategic cooperation agreements and strengthen international connections. The existing 1,000mm railway line was built during the French colonial period, while the railways of other countries serving international transport train runs were 1,435mm.

After building a new route, imported goods can be transported by intervention ships to Europe, reducing transportation costs and logistics costs.

Regarding transportation needs, according to Deputy Minister Huy, there are currently 3 transportation methods on this route: Roads, railways, and inland waterways. However, according to forecasts, although the existing road, waterway and railway capacity has been fully exploited, by 2040 it will not be able to meet transportation needs, especially freight transport.

Therefore, it is necessary to build a new mode of transport, which is a 1,435mm gauge railway, because the cost is cheaper, safer, the land area is less occupied and is environmentally friendly. The investment in the new route also creates a construction market, thereby affecting economic growth.

"The 1,435mm gauge railway, electrification is a sustainable, modern, friendly mode of transport, contributing to reducing traffic accidents, environmental pollution, responding to climate change and contributing to ensuring national defense and security", Deputy Minister Huy emphasized.

According to the project's pre-feasibility study report, the entire railway line is about 400 km long with 36 stations, passing through 9 provinces and cities. In which, the section through Hai Phong includes the main route, 46.1 km long and 2 branch routes, 20.5 km long. Design speed of the main route is 160 km/h; branch route 80 km/h. The total estimated investment capital is more than 8 billion USD.

Xuyên Đông
RELATED NEWS

Special mechanism helps shorten procedures for urban railway construction

|

The implementation of investment in urban railway lines in Hanoi and Ho Chi Minh City is still slow and has not achieved the target.

Expectations of the North-South high-speed railway project to help the country grow

|

One of the “mega-projects” expected to contribute to bringing the country into the era of national development is the North-South high-speed railway. The project has been officially approved by the National Assembly, carrying with it the faith and hope of many generations of Vietnamese people.

The truck license plate was obscured, the driver blamed the manufacturer

|

Hanoi - Many trucks were stopped for inspection by the traffic police due to their license plates being obscured. The driver gave many reasons to justify.

Miss Universe President Prosecuted and crisis of 74-Year-Old pageant

|

Miss Universe 2025 ended in Bangkok (Thailand) with the crown belonging to the representative of Mexico Fatima Bosch, but the aftermath was a series of scandals surrounding it.

Thang Long Boulevard service road is deteriorating for a long time, people live miserably in the dust and flooding

|

Thang Long Boulevard service road is heavily degraded and is constantly dusty, causing people around the area to face many risks of insecurity.

AI sings Trinh's music, copyright issues are a headache

|

AI sings Trinh's music, AI covers a series of famous songs that have reached millions of views, but the author is "empty-handed", raising copyright issues.

3 large reservoirs in Ho Chi Minh City simultaneously release floodwaters

|

HCMC - Faced with complicated weather developments and rising water levels, 3 large reservoirs continue to release floodwaters to ensure the safety of the project.

Union Newsletter: Deadline for evaluating and classifying cadres and civil servants this year according to Decree 90

|

Abundant orders at the end of the year, workers are excited because of increased income; Time to evaluate and classify quality in 2025 for cadres, civil servants, public employees...

Special mechanism helps shorten procedures for urban railway construction

TRÍ MINH |

The implementation of investment in urban railway lines in Hanoi and Ho Chi Minh City is still slow and has not achieved the target.

Expectations of the North-South high-speed railway project to help the country grow

Hiếu Anh |

One of the “mega-projects” expected to contribute to bringing the country into the era of national development is the North-South high-speed railway. The project has been officially approved by the National Assembly, carrying with it the faith and hope of many generations of Vietnamese people.

Chi tiết 15 tuyến đường sắt đô thị Hà Nội dự kiến xây dựng

KHÁNH AN |

Hà Nội - Hiện tại, thành phố đang có 2 tuyến đường sắt đô thị và đang phấn đấu đến năm 2045 có 15 tuyến với tổng chiều dài 616,9km.