Image of the arterial road in Hanoi that is about to be upgraded and renovated

HỮU CHÁNH |

Hanoi - Nearly 4km of National Highway 1A, a narrow section passing through Gia Lam, is about to be upgraded and renovated to ensure traffic safety and order and reduce congestion.

At 9:00 a.m. on December 4, National Highway 1A, Gia Lam District (Hanoi) was bustling with the sound of engines and horns of many dump trucks, containers... running from Bac Ninh to National Highway 3 Hanoi and vice versa.

The National Highway 1A section passing through here is only about 8-10m wide, without a median strip, while receiving many trucks, containers... passing through every day.

Locals said that during rush hour, cars and large trucks line up in 2-3 rows, almost completely occupying the road, forcing motorbikes to weave through the gaps.

Witnessing many collisions between cars and motorbikes on National Highway 1A, Mr. Nguyen Xuan Ngoc (56 years old, Yen Vien town, Gia Lam) said that although the road is narrow, many trucks, container trucks... still drive very fast. At night, when the road is empty, many cars race each other, honking their horns loudly.

"There are also many motorcyclists who recklessly overtake or drive in the wrong direction, crossing the road without looking, so accidents are more likely to happen," said Mr. Ngoc, adding that in addition to serious accidents, minor collisions between vehicles happen "every day" on the above road section.

For many years, people who regularly travel on this road like Mr. Ngoc have been "waiting with bated breath" for the day the road is upgraded and renovated to ensure their safety.

Faced with the above situation, the Hanoi People's Committee recently assigned the Department of Transport to preside over and coordinate with the Gia Lam District People's Committee to urgently prepare a report proposing an investment policy in the form of public investment for National Highway 1A, from Duong New Bridge to the end of Gia Lam District (about 3.75km), send it to the Department of Planning and Investment for appraisal and report to the City People's Committee according to regulations.

Hanoi City assigned the Department of Planning and Investment to urgently review and update the investment project of National Highway 1A, the section from Duong New Bridge to the end of Gia Lam district mentioned above, into the city's medium-term public investment plan for 2021-2025, and report to the City People's Committee.

The Hanoi People's Committee also directed relevant units to organize traffic flow, ensure traffic order and safety, and reduce traffic congestion on National Highway 1A, from Duong Moi Bridge to the end of Gia Lam district.

Quoc lo 1A sap duoc nang cap, cai tao co diem dau o cau Duong moi. Anh: Huu Chanh
National Highway 1A, from Duong Moi Bridge to Gia Lam District (currently Ha Huy Tap and Dang Phuc Thong streets) is the section connecting to Bac Ninh Province. Photo: Huu Chanh
Tuyen duong thuong xuyen xay ra tinh trang un tac giao thong, tiem an nguy co mat an toan giao thong do su thay doi mat cat duong giua Bac Ninh va Ha Noi. Trong anh la Quoc lo 1A doan qua Bac Ninh co mat cat ngang khoang 40m, dam bao 6 lan xe. Anh: Huu Chanh
The route often experiences traffic congestion, posing a potential risk to traffic safety due to changes in the road cross-section between Bac Ninh and Hanoi. In the photo is National Highway 1A through Tu Son city (Bac Ninh) with a cross-section of about 30m, accommodating 6 lanes. Photo: Huu Chanh
Trong khi do Quoc lo 1A doan qua huyen Gia Lam hien chi rong 8-10m, khong dai phan cach nhung tiep nhan luu luong phuong tien rat lon moi ngay. Anh: Huu Chanh
Meanwhile, National Highway 1A through Gia Lam District (Hanoi) is currently only 8-10m wide, without a median strip, but receives a very large volume of traffic every day. Photo: Huu Chanh
Container chay nuom nuop tren tuyen. Anh: Huu Chanh
Containers run continuously on the route. Photo: Huu Chanh
Duong sat cat ngang Quoc lo 1A Gia Lam. Anh: Huu Chanh
Duong sat cat ngang Quoc lo 1A Gia Lam. Anh: Huu Chanh
The railway cuts across National Highway 1A Gia Lam. Photo: Huu Chanh
Nhieu doan via he Quoc lo 1A doan qua huyen Gia Lam dang duoc cai tao. Anh: Huu Chanh
Many sidewalk sections of National Highway 1A through Gia Lam district are being renovated. Photo: Huu Chanh
Phuong tien dung do, di nguoc chieu tren tuyen gay mat an toan giao thong. Anh: Huu Chanh
Vehicles stopping and driving in the wrong direction on the route cause traffic insecurity. Photo: Huu Chanh
Quoc lo 1A doan di duoi cao toc Ha Noi - Thai Nguyen. Anh: Huu Chanh
Hanoi - Thai Nguyen expressway overpass over National Highway 1A Gia Lam. Photo: Huu Chanh
Anh: Huu Chanh
In addition to preparing a report proposing an investment policy for the project to renovate and upgrade National Highway 1A, from Duong New Bridge to the end of Gia Lam District, the Hanoi People's Committee also requested relevant units to organize, regulate, and separate traffic flows to ensure traffic order and safety, and reduce congestion on the route. Photo: Huu Chanh
HỮU CHÁNH
TIN LIÊN QUAN

The land where the bus station will be built is three times larger than the Nuoc Ngam station in Hanoi

|

Hanoi - Dong Anh bus station is built near the intersection of National Highway 3 and Ring Road 3 with a scale of nearly 55,000m2, 3 times larger than Nuoc Ngam bus station.

Overloaded inner-city roads in Hanoi await rescue of Red River overpass

|

Hanoi - The bridge project across the Red River has not been built yet, putting traffic pressure on the main road in the inner city.

Long-term, capital-intensive project in Hanoi to be completed in 2025

|

Hanoi - After many years of delay and an additional capital increase of nearly VND 1,290 billion, the Tam Trinh Road expansion project is expected to be completed by the end of 2025.

Thuc Phan Ward in Cao Bang Province welcomes the first international group

|

Cao Bang - Officially put into operation, Thuc Phan ward welcomed the first group of international tourists.

The Ministry of Education and Training affirms that the 2025 graduation exam is still within the 2018 Program limit

|

According to the Ministry of Education and Training, this year's high school graduation exam will increase differentiated questions, the content does not exceed the requirements of the new Program.

Many couples registered their marriage on the first day of the operation of the two-level government in Ho Chi Minh City

|

Ho Chi Minh City - Not only is July 1 a special day for many couples when the two-level government apparatus in Ho Chi Minh City officially begins operations.

Prime Minister appoints Lieutenant General Nguyen Van Hien to hold the position of Deputy Minister of National Defense

|

Lieutenant General Nguyen Van Hien was appointed by the Prime Minister to hold the position of Deputy Minister of National Defense.

Bich Tuyen said her billionaire husband was shocked and hurt when reading 15 pages of Dam Vinh Hung's oath

|

Singer Bich Tuyen said that before the lawsuit with Dam Vinh Hung, the two families loved each other very much, her daughter and the male singer's son often went out together.

The land where the bus station will be built is three times larger than the Nuoc Ngam station in Hanoi

HỮU CHÁNH |

Hanoi - Dong Anh bus station is built near the intersection of National Highway 3 and Ring Road 3 with a scale of nearly 55,000m2, 3 times larger than Nuoc Ngam bus station.

Overloaded inner-city roads in Hanoi await rescue of Red River overpass

NHÓM PV |

Hanoi - The bridge project across the Red River has not been built yet, putting traffic pressure on the main road in the inner city.

Long-term, capital-intensive project in Hanoi to be completed in 2025

HỮU CHÁNH |

Hanoi - After many years of delay and an additional capital increase of nearly VND 1,290 billion, the Tam Trinh Road expansion project is expected to be completed by the end of 2025.