Water flooded underpass, cutting off residential roads along Vinh Hao - Phan Thiet expressway

Duy Tuấn |

Lam Dong - Rising water caused flooding of underpasses and residential access roads along the Vinh Hao - Phan Thiet Expressway.

On the afternoon of September 6, it was noted that the residential access road along km212 of the Vinh Hao - Phan Thiet expressway through Ham Thuan commune, Lam Dong province was flooded with underpass and access road.

Duong gom va ham chui dan sinh bi ngap nuoc o doc km212 cao toc Vinh Hao - Phan Thiet. Anh: Duy Tuan
The service road and underpass for people were flooded along km212 of the Vinh Hao - Phan Thiet Expressway. Photo: Duy Tuan

Rising water in the Song Thang bridge area caused the residential access road to be cut off on both sides. People cannot pass through this location. Households wishing to travel through this location must take a detour and travel further.

Ham chui bi ngap nuoc. Anh: Duy Tuan
The underpass was flooded. Photo: Duy Tuan
Duong gom bi chia cat 2 ben do ngap. Anh: Duy Tuan
The service road was cut off on both sides due to flooding. Photo: Duy Tuan

According to observations, the surrounding fields were flooded with white water. On the night of September 5, there was prolonged heavy rain in the area.

Water from upstream flooded and rose, causing flooding in many houses in Ku Ke village, Ham Thuan commune, about 4km from the underpass.

Close-up of flooded underpasses and residential access roads along the Vinh Hao - Phan Thiet Expressway. Clip: Duy Tuan

Previously, in July 2023, a similar flooding occurred at the underpass at km212 of the Vinh Hao - Phan Thiet expressway. The units have brought in machinery to repair the problem. After more than 2 years, the underpass and residential access road here were flooded again.

Dong ruong quanh vi tri km212 cao toc Vinh Hao - Phan Thiet ngap nuoc trang xoa. Anh: Duy Tuan
The fields around km212 of the Vinh Hao - Phan Thiet expressway were flooded with white water. Photo: Duy Tuan

The Vinh Hao - Phan Thiet Expressway is over 100 km long, open to traffic since May 2023, and is a section of the North - South Expressway in the East. The route has 4 lanes, with a maximum speed of 90 km/h. Along the expressway, there are residential access roads, overpasses, and underpasses for local people to travel.

Duy Tuấn
RELATED NEWS

Bringing excavators to clean up landslides and sand that have overflowed onto the Vinh Hao - Phan Thiet Expressway

|

Lam Dong - On September 3, excavators, dump trucks and workers arrived at the landslide site, overflowing onto the Vinh Hao - Phan Thiet expressway to continue clearing the scene.

Close-up of the sandbank caused by the flow of torn water, overflowing onto the Vinh Hao - Phan Thiet Expressway

|

Lam Dong - Sand and soil from above, following the overflow onto the Vinh Hao - Phan Thiet expressway, caused the road to temporarily stop exploitation for about 2 hours for handling.

At midnight, Vinh Hao - Phan Thiet Expressway suddenly overflowed with sand, soil, and rainwater

|

Lam Dong - It took authorities 2 hours to clear all the layer of soil, sand and rainwater stagnant on the highway so that vehicles could circulate again.

Hour 9: Should we get married? - Part 2

|

Hour 9 No. 167 - The husband reunites with his first love after catching his wife cheating and demanding a divorce. Should they get married again?

School apologizes for publicizing the list of students in difficulty at the opening ceremony

|

Hanoi - Thai Thinh Primary School, Dong Da, Hanoi has just issued an apology letter for a major mistake at the opening ceremony.

The State Bank coordinates with the Ministry of Public Security to manage the gold market

|

The State Bank will closely coordinate with the Ministry of Public Security, the Government Inspectorate and agencies to implement the management of the gold market.

Thousands of military officers and soldiers marched back to their units after the A80

|

The military units in the Southern region used 85 cars to transport 1,374 people and materials and equipment to Hanoi Station and Noi Bai Airport.

Mr. Pham Duc An is introduced to be elected Chairman of the People's Committee of Da Nang City

|

Mr. Pham Duc An - Chairman of the People's Committee of Quang Ninh province, was transferred and appointed as Deputy Secretary of the Da Nang City Party Committee to introduce and elect the Chairman of the Da Nang City People's Committee.

Bringing excavators to clean up landslides and sand that have overflowed onto the Vinh Hao - Phan Thiet Expressway

Duy Tuấn |

Lam Dong - On September 3, excavators, dump trucks and workers arrived at the landslide site, overflowing onto the Vinh Hao - Phan Thiet expressway to continue clearing the scene.

Close-up of the sandbank caused by the flow of torn water, overflowing onto the Vinh Hao - Phan Thiet Expressway

Duy Tuấn |

Lam Dong - Sand and soil from above, following the overflow onto the Vinh Hao - Phan Thiet expressway, caused the road to temporarily stop exploitation for about 2 hours for handling.

At midnight, Vinh Hao - Phan Thiet Expressway suddenly overflowed with sand, soil, and rainwater

Duy Tuấn |

Lam Dong - It took authorities 2 hours to clear all the layer of soil, sand and rainwater stagnant on the highway so that vehicles could circulate again.