Diversifying traffic on Prenn Pass - the gateway to Da Lat to overcome landslides

Phúc Khánh |

Lam Dong - The authorities organized traffic diversion on Prenn Pass in Xuan Huong - Da Lat Ward to serve the landslide recovery work.

On the afternoon of December 4, the Department of Construction of Lam Dong province issued a notice of traffic diversion and organized the traffic diversion on Prenn Pass, section Km224+600 - Km224+700 (in Xuan Huong - Da Lat ward) to overcome the landslide.

Due to the impact of heavy rain from December 2 to 4, on the Prenn Pass section Km224+600 - Km224+700 (in Xuan Huong - Da Lat ward), a landslide occurred on the positive slope, burying the road surface with rocks and soil, causing traffic congestion.

Deo Prenn dang tam dong do sat lo nghiem trong. Anh: Phuc Khanh
Prenn Pass is temporarily closed due to serious landslides. Photo: Phuc Khanh

Along with that, cracks appeared on the positive slope, causing instability of the slope, leading to some pine trees on the top of the slope being at risk of falling, posing a potential danger to vehicles traveling on the route.

Currently, the Department of Construction is coordinating with local authorities and related units to implement a plan to clear landslides and cut down trees at risk of falling, affecting the safety of vehicles traveling on the route.

To ensure traffic safety on the route and serve the above work, the Department of Construction announced the organization of traffic diversion on Prenn Pass (Xuan Huong Ward - Da Lat) specifically.

People and vehicles are prohibited from traveling through Km224+600 - Km224+700, Prenn Pass (Xuan Huong - Da Lat Ward, Lam Dong Province).

The traffic flow is guaranteed as follows: Traffic routes for Da Lat vehicles and vice versa in 3 directions.

Sat lo khien khoi luong lon dat da tu taluy duong do xuong duong deo Prenn. Anh: Phuc Khanh
The landslide caused a large amount of rock and soil from the positive slope to flow down to Prenn Pass. Photo: Phuc Khanh

Mimosa Pass, all vehicles are allowed to travel in two directions in the direction of Mimosa Pass (starting normal traffic from 3:30 p.m. on December 4).

Directing to Tuyen Lam Lake (Sacom Tuyen Lam Pass), all vehicles (except trucks) from Lien Khuong Expressway turn left onto Sacom Tuyen Lam Street to the center of Da Lat and vice versa.

Ta Nung Pass (Provincial Road 725), all types of vehicles are allowed to travel in two directions in the direction of Ta Nung Pass.

Canh sat Giao thong Cong an Lam Dong phan luong, dieu tiet giao thong tai chan deo Prenn. Anh: Phuc Khanh
Lam Dong Traffic Police Department divides traffic and regulates traffic at the foot of Prenn Pass. Photo: Phuc Khanh

The traffic diversion time starts from 1:00 p.m. on December 4, until further notice from the Department of Construction of Lam Dong province.

As reported by Lao Dong Newspaper: At noon on December 4, Lam Dong provincial authorities decided to close Prenn Pass, banning vehicles from traveling in both directions due to large-scale landslides.

Phúc Khánh
RELATED NEWS

Large-scale landslide, Prenn Pass - gateway to Da Lat is temporarily closed

|

Da Lat - A large amount of rock and soil and forest trees from the embankment tens of meters high collapsed, burying the surface of Prenn Pass, paralyzing traffic on this route.

Gia Bac Pass in Lam Dong suffered a serious landslide, 20 cars were stuck on National Highway 28

|

Lam Dong - Initially, the authorities recorded a landslide and a fall of forest trees on National Highway 28, causing about 20 cars to be stuck at Gia Bac Pass.

Heavy rain caused landslides at 5 points on Gia Bac Pass, National Highway 28 through Lam Dong completely paralyzed

|

Lam Dong - Heavy rain lasting for many hours caused Gia Bac Pass on National Highway 28 to have 5 landslides, completely paralyzing traffic in both directions.

Exchange experiences in protecting workers' rights in the new context

|

From December 1-4, the Vietnam Trade Union Delegation will work in India at the invitation of the All-India Trade Union Congress (AITUC). At the meeting, the two sides exchanged experiences in protecting workers' rights.

Russia warns Europe about frozen assets, considering it an excuse to start a war

|

Moscow could see the European Union's (EU) efforts to use frozen Russian assets as an act of justification for war.

Minister Nguyen Kim Son: In the near future, there will only be 3 - 4 pedagogical colleges

|

Minister Nguyen Kim Son said that in the planning of universities, colleges, and the pedagogical college system, there will be only 3-4 schools left.

Diversifying traffic on Prenn Pass - the gateway to Da Lat to overcome landslides

|

Lam Dong - The authorities organized traffic diversion on Prenn Pass in Xuan Huong - Da Lat Ward to serve the landslide recovery work.

The Government responds to the proposal not to take exams and consider high school graduation to reduce pressure and costs

|

There are opinions suggesting not to organize exams but to consider high school graduation to suit the goals and nature of this level of education; reduce pressure and costs due to exams.

Large-scale landslide, Prenn Pass - gateway to Da Lat is temporarily closed

Phúc Khánh |

Da Lat - A large amount of rock and soil and forest trees from the embankment tens of meters high collapsed, burying the surface of Prenn Pass, paralyzing traffic on this route.

Gia Bac Pass in Lam Dong suffered a serious landslide, 20 cars were stuck on National Highway 28

Phúc Khánh - Phan Tuấn |

Lam Dong - Initially, the authorities recorded a landslide and a fall of forest trees on National Highway 28, causing about 20 cars to be stuck at Gia Bac Pass.

Heavy rain caused landslides at 5 points on Gia Bac Pass, National Highway 28 through Lam Dong completely paralyzed

Phúc Khánh - Phan Tuấn |

Lam Dong - Heavy rain lasting for many hours caused Gia Bac Pass on National Highway 28 to have 5 landslides, completely paralyzing traffic in both directions.