Photo
Female track and field athlete crawls to the finish line at the National Marathon Championship
|
Female athlete Hoang Thi Ngoc Hoa suddenly fell but still strained herself to crawl across the finish line at the National Marathon Championship - Tien Phong Newspaper 2026.
Project of over 31,200 billion VND in Can Tho lacks millions of cubic meters of sand
|
Can Tho - The Chau Doc - Can Tho - Soc Trang expressway project is facing a shortage of materials as the amount of sand brought to the construction site does not meet construction needs.
Overview of the repair site of the Lo River bridge pier that once had bare steel reinforcement
|
Phu Tho - The Lo River bridge in Doan Hung commune was damaged, the bridge pier once had bare steel reinforcement and is now being urgently repaired by the construction unit.
Striker Xuan Son and weight issues
|
Xuan Son's physical condition and weight became the focus when coach Kim Sang-sik frankly said that this striker has not reached his best form.
Workers work through noon to push forward the high-speed railway resettlement project in Hue
|
HUE - Workers work in the sun through noon, taking advantage of favorable weather to accelerate construction, ensuring the progress of the high-speed railway resettlement project.
High tide, people wade through water to get home
|
On the evening of December 2, high tides caused some roads in low-lying areas in Ho Chi Minh City to be flooded, making travel difficult for people.
President Luong Cuong works with the Supreme People's Court
|
This morning (December 2), in Hanoi, President Luong Cuong worked with the Supreme People's Court, according to VNA.
“Keeping the fire” for the century-old blacksmith village in Hue
|
HUE - The government and people of Huong Vinh ward (Hue city) are making efforts to revive the local traditional blacksmithing profession that has existed for hundreds of years.
The first steel arch bridge in Quang Ngai is under construction
|
Tra Khuc 3 Bridge with the first steel arch design in Quang Ngai is accelerating construction, ready for technical traffic opening by the end of this year.
Cruise ships and tourist boats bobbing on the Can Tho River
|
Can Tho - From Ninh Kieu wharf, many yachts and tourist boats bustlingly parade on Can Tho river to Cai Rang floating market.
"Lynx" beauty: Sharp and beautiful, once acted with Anh Tu Atus
|
Thien An was highly praised for her role as Mrs. Kim in "The Cat: The Devil's Incarnation".
National relic associated with traditional blacksmithing in Nam Dinh
|
Nam Dinh - Van Chang communal house national relic is a place of worship and gratitude of local people towards the Six Blacksmith Patriarchs.
Impressive 300kg costume performed for the first time in Can Tho
|
Can Tho - More than 100 models performed in traditional and modern costumes, with impressive and eye-catching transformations.
Impressions of an international-scale Festival in Ninh Binh
|
Ninh Binh - On the evening of November 30, the 3rd Ninh Binh Festival 2024 with the theme "Heritage Flow" ended with many unique artistic and cultural activities.
Colorful cultural street festival in Ninh Binh
|
Ninh Binh - Within the framework of Ninh Binh Festival 2024, on the evening of November 29, the Street Festival was held with many unique cultural activities.
To the place where a straw is as precious as a grain of rice
|
Soc Trang - Harvesting rice with combine harvesters or burning straw in the fields is not present in the coastal fields of Vinh Chau.
The nearly 315 billion VND embankment project in Can Tho has subsided before it was completed
|
Can Tho – The Cai Son canal embankment project, over 2.8 km long, started construction at the end of 2019, however, to date, this project remains unfinished and degraded.
Vietnam team beat Daegu FC 2-0
|
Midfielder Nguyen Quang Hai left his mark with a goal in Vietnam's 2-0 win over Daegu FC in South Korea.
Overview of the urgent 600 billion project that is sluggish due to lack of land
|
Hoa Binh - The urgent project of Pheo - Che flood prevention dyke in the lower Da River with a total investment of nearly 600 billion VND is being slowly constructed due to lack of land.
Capital Youth Park in ruins, waiting to be renovated
|
After nearly 1 year of Hanoi City handing over management to Hai Ba Trung District, the Capital Youth Park (Thanh Nhan Ward) is still in a state of disrepair.