Successfully reattached arm to student in traffic accident

THANH TUẤN |

Gia Lai - Thanks to proper preservation of the severed arm, the victim was successfully reattached by surgeons.

On December 3, Hoang Anh Gia Lai University of Medicine and Pharmacy Hospital announced that the unit had just successfully performed emergency surgery on a patient who had suffered a serious traffic accident.

Previously, on the afternoon of November 26, Tran Hung Phuc (12 years old), residing in Kong Chro district, went out to eat with his father. At that time, he wrapped his shirt around his arm while sitting on the back of a motorbike. When the motorbike was running at high speed, unfortunately, the shirt got caught in the chain, dragging Phuc's arm along, causing the forearm (from the elbow to the wrist) to be severed. Phuc was then taken to Kong Chro District Medical Center. Here, medical staff performed an inter-hospital red alert, provided effective first aid, and urgently took the patient to Hoang Anh Gia Lai University of Medicine and Pharmacy Hospital in Pleiku city.

At the hospital, doctors from the Neurosurgery - Orthopedic Trauma Department cleaned the forearm, removed the crushed parts and began emergency surgery.

After 5 hours, the surgery to reattach Phuc's arm was successful. Phuc's arm is now warm again and is gradually recovering well.

THANH TUẤN
RELATED NEWS

The billion-VND bridge connecting Nam Dinh - Ninh Binh officially closed

|

Nam Dinh - The Day River overpass connecting Nam Dinh and Ninh Binh provinces has officially been closed.

Russia leaves open the possibility of resuming nuclear testing

|

The risk of nuclear war still exists, but Russia will do everything possible to prevent this possibility.

Speeding up construction of the trillion-dollar road connecting Lao Cai - Lai Chau

|

The project to upgrade National Highway 279 connecting Lai Chau with Noi Bai - Lao Cai Expressway at IC16 intersection is accelerating construction to complete the progress.

Hanoi Party Secretary requests drastic removal of urban bottlenecks

|

Hanoi - Hanoi Party Secretary Nguyen Duy Ngoc requests the Construction sector to thoroughly handle congestion, flooding, and urban bottlenecks.

Live football U23 Korea vs U23 Australia in the U23 Asian Cup quarter-finals

|

Live broadcast of the match between U23 Korea and U23 Australia in the quarter-finals of the 2026 AFC U23 Championship, taking place at 10:30 PM today (January 17).

Live football Man United vs Man City in the Premier League

|

Live football match Man United - Man City in round 22 of the Premier League, taking place at 7:30 PM on January 17 (Vietnam time).

15-year traffic jam at the eastern gateway of Ho Chi Minh City is about to be removed

|

Ho Chi Minh City - The bottleneck on National Highway 1, the section of the new Mien Dong Bus Station - Tan Van, is expected to be expanded from the end of 2026, helping to eliminate traffic jams at the eastern gateway.

Excavation of an ancient tomb nearly 2,000 years old in Quang Ninh

|

Quang Ninh - During the excavation of an ancient tomb nearly 2,000 years old in Vang Danh, Quang Ninh province, many important artifacts were discovered.

The billion-VND bridge connecting Nam Dinh - Ninh Binh officially closed

Lương Hà |

Nam Dinh - The Day River overpass connecting Nam Dinh and Ninh Binh provinces has officially been closed.

Russia leaves open the possibility of resuming nuclear testing

Thanh Hà |

The risk of nuclear war still exists, but Russia will do everything possible to prevent this possibility.

Speeding up construction of the trillion-dollar road connecting Lao Cai - Lai Chau

Đinh Đại |

The project to upgrade National Highway 279 connecting Lai Chau with Noi Bai - Lao Cai Expressway at IC16 intersection is accelerating construction to complete the progress.