485 delegates will attend the 1st Can Tho City Party Congress

Tạ Quang |

Can Tho - On the afternoon of September 22, the Can Tho City Party Committee held a press conference to inform about the 1st Can Tho City Party Congress, term 2025 - 2030.

According to the Organizing Committee, the 1st Congress of the Can Tho City Party Committee, term 2025 - 2030, will take place for 3 days, from September 26 to September 28, 2025 at the Can Tho City Military Command Hall.

Quang canh buoi hop bao. Anh: Ta Quang
Scene of the press conference. Photo: Ta Quang

The first working day (the General Meeting held a Bousiness Session) is at 2:00 p.m., September; the second working day (official General Meeting), opens at 7:30 a.m. on September9; The third working day (the General Meeting closed at 7:30 a.m., September 28).

The Congress was attended by 485 official delegates (of which, there were 96 female delegates, accounting for 19.79%; 19 delegates were ethnic minorities, accounting for 3. 90%), representing over 141,000 party members of 109 Party Committees under the Can Tho City Party Committee. The delegates are of course 79 members of the current City Party Committee, the delegates are appointed as 406 delegates. The delegates invited about 70 delegates.

Dai hoi dai bieu Dang bo thanh pho Can Tho lan thu I, nhiem ky 2025 - 2030 se dien ra trong 3 ngay, tu ngay 26.9 den ngay 28.9.2025. Anh: Ta Quang
The 1st Congress of the Can Tho City Party Committee, term 2025 - 2030, will take place for 3 days, from September 26 to September 28, 2025. Photo: Ta Quang

On the theme of the Congress: "Promoting the tradition of solidarity; building and rectifying the Party and the political system to be clean and strong in all aspects; mobilizing all resources, breakthroughs, creativity, international integration, developing Can Tho city quickly, sustainably and modernly".

The Congress motto is "Solidarity - Democracy - Discipline - Breakthrough - Development", demonstrating the principles, core values and methods of action in the Congress and throughout the City Party Committee in the 2025 - 2030 term.

The draft Political Report has 28 targets, including: Economic targets (8 targets); social targets (7 targets); environmental targets (4 targets); targets for infrastructure development (3 targets); targets for Party building and the political system (3 targets); targets for national defense, security, foreign affairs (3 targets), and at the same time identified 5 key tasks and 3 breakthroughs and 10 groups of solutions in the 2025 - 2030 term.

Ong Nguyen Ngoc Tam - Truong Ban Tuyen giao va Dan van Thanh uy Can Tho. Anh: Ta Quang
Mr. Nguyen Ngoc Tam - Head of the Propaganda and Mass Mobilization Department of the Can Tho City Party Committee. Photo: Ta Quang

Regarding personnel work, based on Directive No. 45-CT/TW, dated April 14, 2025 of the Politburo and regulations and instructions of the Central Committee, the Congress will not elect the City Party Executive Committee, the Standing Committee of the City Party Committee, the Inspection Committee of the City Party Committee for the 2025-2030 term and the Delegation attending the 14th National Congress of the Party, but will be appointed by the Politburo and the Secretariat.

At the Congress, personnel decisions will be announced. Human resources are prepared closely, democratically, fairly, objectively, and in accordance with procedures, ensuring inheritance, continuous innovation and development, meeting the requirements of tasks in the new period.

The new point of the congress organization is to promote the application of information technology in many important stages: Management and issuance of electronic documents, registration and nomination of delegates, operation of some working sessions via electronic system, ... especially deploying on the Can Tho Smart App the section "The First Can Tho City Party Congress" to serve information work, expand the scope of information dissemination about the Congress; provide documents, receive comments from cadres, party members and people, and at the same time support reporters to access official documents.

Tạ Quang
RELATED NEWS

The project worth over VND7,200 billion to upgrade 7km of National Highway 91 in Can Tho officially started construction

|

Can Tho - After many "missed deadlines", up to now, the National Highway 91 Upgrade and Expansion Project (Km0 - Km7) has officially started construction along with many other projects.

Nearly 5,180 billion VND to upgrade National Highway 61C and expand regional connections in Can Tho

|

Can Tho - The projects aim to develop transport infrastructure, increase regional connectivity, while responding to climate change and controlling urban flooding in Can Tho.

Can Tho prepares to do 2 traffic projects worth 14,000 billion VND

|

Can Tho - 2 projects have a total capital of nearly 14,000 billion VND, most of which is Japanese loans.

Ho Chi Minh City Police invite Ngu Ho Tuong band with Ung Hoang Phuc to work

|

The Cyber Security and High-Tech Crime Prevention Department (PA05) of Ho Chi Minh City Police invited the group of singer Ngu Ho Tuong with Ung Hoang Phuc to work.

12,800 hectares of land in 245 projects waiting to be cleared in Khanh Hoa

|

The Government Office has just announced the conclusion of Permanent Deputy Prime Minister Nguyen Hoa Binh on removing difficulties and obstacles for projects in Khanh Hoa province.

Elderly people need care in the morning to pick them up and take them home in the afternoon

|

Mr. Truong Xuan Cu - Vice President of the Vietnam Association of the Elderly - hopes that many elderly people will be cared for during the day "in the morning pick them up and take them home in the afternoon".

Work accident at Metro No. 2 project kills a worker

|

HCMC - A worker died after a work accident at Metro Line 2 when a tractor hit his head during construction.

The project worth over VND7,200 billion to upgrade 7km of National Highway 91 in Can Tho officially started construction

Tạ Quang |

Can Tho - After many "missed deadlines", up to now, the National Highway 91 Upgrade and Expansion Project (Km0 - Km7) has officially started construction along with many other projects.

Nearly 5,180 billion VND to upgrade National Highway 61C and expand regional connections in Can Tho

Tạ Quang |

Can Tho - The projects aim to develop transport infrastructure, increase regional connectivity, while responding to climate change and controlling urban flooding in Can Tho.

Can Tho prepares to do 2 traffic projects worth 14,000 billion VND

Tạ Quang |

Can Tho - 2 projects have a total capital of nearly 14,000 billion VND, most of which is Japanese loans.