The most congested road in Ho Chi Minh City is about to be expanded, people are happily waiting

NHƯ QUỲNH |

HCMC - Nguyen Tat Thanh Street is one of the most congested routes in HCMC, exceeding the designed capacity by 140%, and is about to be expanded, making people excited and happy.

NHƯ QUỲNH
RELATED NEWS

People are tired of waiting for the opening of the traffic jam hot spot at the Northwest gateway of Ho Chi Minh City

|

HCMC - The Truong Chinh and Tan Ky Tan Quy road expansion project has been included by HCMC in the priority investment portfolio, expected to relieve traffic congestion in the Northwest region.

The Northwest gateway of Ho Chi Minh City is often congested because Metro No. 2 lots occupy the road

|

HCMC - The Northwest gateway of HCMC has been often congested in recent days because the Metro Line 2 lot is located right at the Truong Chinh - Cong Hoa intersection.

The main road in Ho Chi Minh City is congested more than 800 times a year

|

HCMC - Nguyen Tat Thanh Street is the main traffic route connecting to the center of HCMC, with high traffic density so it is often congested, even overloaded many times.

Officials working abroad and integrating regularly internationally will be supported with 100% of their salary

|

The Government proposes that people working in foreign affairs and international integration who are regularly supported with 100% of their salary according to the current coefficient (excluding allowances).

Ho Chi Minh City Department of Construction speaks out about the proposal to convert gasoline motorbikes to electricity

|

HCMC - The renovation of gasoline motorbikes to electric vehicles to be officially implemented needs to continue to perfect the legal basis, technical regulations, safety standards...

Dak Lak bans people from going out in storm-affected areas from the afternoon of November 6

|

Dak Lak requires the ban on all people in areas affected by the storm until the storm passes, except for functional forces on duty.

Hai Phong Lung Hospital is seriously degraded after half a century of operation

|

Hai Phong - After 50 years of use, 7 works at Hai Phong Lung Hospital have seriously degraded, not ensuring medical examination and treatment.

The risk of landslides still lurks on the La Son - Hoa Lien Expressway

|

HUE - Historical floods caused rocks and soil from the mountain slopes to fall down, burying many sections of the La Son - Hoa Lien Expressway and Provincial Road 14B, and the risk of landslides still exists.

People are tired of waiting for the opening of the traffic jam hot spot at the Northwest gateway of Ho Chi Minh City

NGỌC ÁNH - NHƯ QUỲNH |

HCMC - The Truong Chinh and Tan Ky Tan Quy road expansion project has been included by HCMC in the priority investment portfolio, expected to relieve traffic congestion in the Northwest region.

The Northwest gateway of Ho Chi Minh City is often congested because Metro No. 2 lots occupy the road

MINH QUÂN |

HCMC - The Northwest gateway of HCMC has been often congested in recent days because the Metro Line 2 lot is located right at the Truong Chinh - Cong Hoa intersection.

The main road in Ho Chi Minh City is congested more than 800 times a year

NHƯ QUỲNH |

HCMC - Nguyen Tat Thanh Street is the main traffic route connecting to the center of HCMC, with high traffic density so it is often congested, even overloaded many times.