Road tunnel through Hoang Lien Pass worth VND3,300 billion
The Hoang Lien Pass Road tunnel project connecting the Sa Pa area (Lao Cai) with Tam Duong (Lai Chau) is invested by the Lai Chau Province Traffic Construction Investment Project Management Board.
The project has a total investment of VND 3,300 billion, of which construction cost is VND 2,229 billion and equipment cost is VND 258.7 billion. The estimated investment capital is from the central budget of VND2,500 billion and the Lai Chau provincial budget of VND710 billion, other capital is VND90 billion.

Accordingly, the project has a total length of about 8.8 km, of which the main tunnel is 2.63 km long, the secondary tunnel is 2.65 km long, and will be implemented in the 2023-2027 period.
When completed, the project will replace the 22 km most dangerous mountain pass on National Highway 4D, shortening travel time from 50 - 120 minutes to about 11 minutes.
This is a project of special significance, opening up opportunities to promote trade between Lao Cai - Lai Chau, connecting the region with the Noi Bai - Lao Cai expressway, while creating momentum for the development of services, logistics, tourism and import and export of goods through international border gates.
The project is expected to be completed in 2027, promising to soon become a strategic connecting route, contributing to promoting the socio-economic development of the Northwest region.
Social housing of more than VND 905 billion for workers
The project to invest in the construction of Doan Ket Lai Chau Social Housing Area (in Doan Ket ward) is invested by Lan Hung Real Estate Group Joint Stock Company (located in Thuan Thanh ward, Bac Ninh province).
This project has a total estimated investment of more than 905 billion VND, of which the investor's capital is 220 billion VND and other legal mobilized loans are more than 685 billion VND.

According to the decision, the project will be implemented on an area of about 31,000m2, with complete and synchronous investment in technical infrastructure, social housing, commercial housing and other works.
Accordingly, the construction of 3 social housing blocks in the form of apartments is expected to be 15-20 floors high, providing about 960 apartments. Construction of commercial housing on an area of 20% of residential land belonging to the project, expected to have about 40 apartments, 4-5 floors high.
Build a 2-storey kindergarten on an area of about 370m2. Outdoor technical infrastructure system items: power supply, water supply, fire prevention and fighting, landscape garden and parking lot
This social housing area will accommodate about 3,000 people.
"Waken up" tourism with a super project worth 6,000 billion VND
The Son Binh Jockland Park Resort Complex Project (Son Binh Commune) is invested by Northern Cement Trading Joint Stock Company with a total investment of up to VND6,000 billion.
The project has a total area of over 106 hectares, divided into 6 functional sub-areas such as: Upstream Valley, Encounter Hill, Super Garden School, Son Binh Hanging Garden... Of which, Area D is the highest area, which will be invested in cable car systems and mountain climbing tourism services.
The goal of "Paradise" is to create a diverse resort tourism complex, serving about 300,000 visitors/year.
The project not only exploits the majestic landscape potential of Tam Duong area but also promises to create thousands of jobs, changing the tourism landscape of Lai Chau province.