Binh Dinh directs handling of series of traffic infrastructure problems

Hoài Luân |

On January 6, Chairman of Binh Dinh Province Pham Anh Tuan directed units and localities to handle a number of shortcomings in traffic infrastructure in the province.

The Chairman of Binh Dinh Provincial People's Committee assigned the Department of Transport to direct units to inspect and repaint blurred speed bump clusters on routes managed by the department such as Km108+210, Km107+850, and Km102+00 of DT638 route...

The People's Committee of An Nhon town directed its affiliated units to coordinate with BOT 36.71 Company Limited to clear and clear the view of the intersection of Le Quy Don Street (Nhon Hoa Ward) and Km20+730 on National Highway 19. At the same time, review and invest in installing traffic signs at some locations.

Along with that, statistics on traffic accidents (number of cases, deaths, injuries) occurring at the above intersection area from 2023 to present, sent to the Provincial Traffic Safety Committee for synthesis, recommending the route management unit to implement measures to ensure traffic safety on the route.

Tay Son District People's Committee directed its subordinate units to clear trees, remove business advertising signs, and awnings that obstruct visibility at Km108+210, Km107+850 and Km102+00 of DT638 route; Km52+800 of National Highway 19B, ensuring clear visibility and traffic safety in the area.

Qua kiem tra, Binh Dinh co 4 duong tinh, 56 duong dia phuong bi hu hong nang do phuc vu thi cong du an cao toc. Anh: Cong Tam
Binh Dinh has 4 provincial roads and 56 local roads severely damaged due to construction of the North-South Expressway project. Photo: Cong Tam

Direct subordinate units to inspect and review investment in installing traffic signs and painting blurred speed bumps in the area of ​​Km47+530, Km42+685 on National Highway 19. At the same time, take measures to clear the view to ensure clear traffic from the level crossing to National Highway 19.

Mr. Pham Anh Tuan assigned the Provincial Traffic Safety Committee to coordinate with the Department of Finance, Department of Transport, Tay Son district and relevant parties to inspect, review, consider and propose the investment in installing a traffic light system at the intersection, the new National Highway 19B section intersecting with Provincial Road 638.

Install a traffic violation monitoring camera system at the intersection from Km38+00 - Km40+000 on National Highway 19 to handle violating vehicles.

Previously, the Department of Transport of Binh Dinh province proposed to the Provincial People's Committee to repair and restore damaged local roads due to the construction of the North-South Expressway project, the section passing through the province.

Through inspection, the provincial road system currently has 4 routes (DT629, 630, 636 and 638) that have been severely damaged due to the construction of the expressway project, with a total length of more than 105km. At the same time, the road system in the localities also recorded 56 routes that were severely damaged, with a total length of more than 66km.

One of the most severely damaged routes is the Km1+00 - Km3+170 section of DT629. This damage causes many difficulties for people in the area to travel.

Hoài Luân
TIN LIÊN QUAN

Plumbers in Binh Dinh are busy pruning leaves so flowers can be ready for Tet

|

The cold and rainy weather has lasted for a long time, thousands of households in An Nhon town (Binh Dinh) are rushing to remove leaves so that the yellow apricot blossoms can "smile" in time for the Lunar New Year 2025.

Binh Dinh plumbers hope for a prosperous Tet season after many gloomy years

|

Binh Dinh - After many quiet apricot seasons, apricot workers in the "golden apricot capital of the Central region" can only look forward to this year's apricot season, hoping for a full Tet.

The press arouses the spirit of independence, self-reliance and national pride

|

Tet press publications and programs contribute to arousing the spirit of independence, self-reliance and national pride.

Gold price today 4.2: High increase, surpassing 90 million VND/tael

|

Gold price today 4.2: Domestic gold price increased sharply. World market is close to all-time high.

USD and RMB at banks both increased sharply

|

Exchange rates on February 4 continued to fluctuate strongly, with the USD and the Chinese Yuan both increasing significantly at banks. The market was affected by international developments.

Accident on the highway, 4 family members injured and died

|

Thanh Hoa - On the way to the South after Tet, a car suddenly had an accident that caused 4 people in a family to be injured and killed.

Another cross-Vietnam heart transplant successfully performed in Hue

|

HUE - After more than 2 weeks of monitoring and post-transplant care, the heart transplant patient was discharged from the hospital with a healthy heart.

Trump sets conditions for continued support for Ukraine

|

President Donald Trump asked Kiev to provide rare earths, in return the US would continue to support Ukraine in its conflict with Russia.

Bé trai ở Bình Định bị bố bạn đánh đập dã man giữa đường

Hoài Luân |

Bình Định - Đang ngồi chơi cùng nhóm bạn tại một quán nước, bé trai bị bố bạn đánh đập dã man, khiến dư luận phẫn nộ.

Plumbers in Binh Dinh are busy pruning leaves so flowers can be ready for Tet

Hoài Luân |

The cold and rainy weather has lasted for a long time, thousands of households in An Nhon town (Binh Dinh) are rushing to remove leaves so that the yellow apricot blossoms can "smile" in time for the Lunar New Year 2025.

Binh Dinh plumbers hope for a prosperous Tet season after many gloomy years

Hoài Phương |

Binh Dinh - After many quiet apricot seasons, apricot workers in the "golden apricot capital of the Central region" can only look forward to this year's apricot season, hoping for a full Tet.